Curriculum Vitae David Lee - Eng Tech MIMechE

PERSONAL HOME ADDRESS

DOB: 3rd August 1967 518 Novana Residence
Nationality: British 348/115 Moo.10
Marital Status – Divorced Soi Land Department 2
Driving Licence: Full British EU, Oman, Thai & South Korean Banglamueng
Chonburi 20150
Thailand
*
* ÈThai Mobile+66 (0)817812328

EDUCATION AND COURSES

·  City & Guilds Aeronautical Engineering Craft Studies Parts 1 & 2 with credits.

·  Zenator &WinPCS Completions System Power User Qualified

·  Opito BOSIET valid till 08-01-2020

·  DuPont STOP Safety Qualified

·  Chevron Incident & Injury Free Trained

·  H2S Opito Qualified

PROFILE

· Experience with Oil & Gas (Onshore and Offshore)

·  Commissioning/Start Up and Completions Engineer

·  Flawless Start-Up/Fault Free Start-Up Implementation Manager

·  Experienced with Project Completions Systems – WinPCS, Qedi-ACS, SPITCH & Zenator

PROFFESIONAL MEMBERSHIP

· Member of the Institute of Mechanical Engineers – No 80107859

·  Member of the Engineering Council

·  Former serving member of the British Armed Forces

Jan 2016 – to date North Caspian Operating Company (NCOC NV) Kazakhstan

PROJECT: Kashagan EP Offshore Project (Improve Team), Kazakhstan

Pre-Commissioning & Completions Supervisor and Area Construction Supervisor (Onshore)

·  Responsible for client monitoring of Contractor Completions Management System on-site implementation and systems handover coordination between Construction and Commissioning & Start-Up team

·  Review final system dossiers including mechanical completion & pre-commissioning completion

·  Review Sub Contractor documentation

·  Field reviews of engineering work packs

·  Supervising contractors construction activities

·  Monitoring contractors manpower and materials status

Jan 2012 – Dec 2015 Kellogg Joint Venture Gorgon South Korea

PROJECT: Chevron Australia Gorgon LNG Project

FSI Implementation Manager, Completions Manager & Deputy Mechanical Commissioning Lead - Fabrication Yards – Hyundai Heavy Industries, Korea; COOEC, China; PTMI, Indonesia & SLC/Kencana, Malaysia

·  Managed Zenator based Completions Management System team, reporting directly to commissioning manager.

·  Deputy Mechanical Commissioning Lead in charge of local technicians to carryout various mechanical commissioning activities required at the fabrication yards, in addition various mechanical activities in support of fabrication team.

·  Managed the implementation of FSI (Fault Free Start-Up Initiative) in the Gorgon project fabrication yards

·  Management of “Company” and “Contractor” FSI Coordinators across all yards

·  Ensuring FSI Key Performance Indicators were achieved

·  Ensuring site quality tours with “Contractors” and their sub-contractors

·  Facilitated Operational Excellence presentations to management during the fabrication of project modules

·  Facilitated FSI Health Checks by Shell Global Solutions

August 2009 – September 2011 Agipkco Kazakhstan

PROJECT: Kashagan EP Offshore Project, Kazakhstan.

Flash Gas & Raw Gas Injection Commissioning Engineer

Commissioning and Start Up of: Siemens Flash Gas Turbo Compressor Modules, Nuovo Pignone (GE) Raw (Sour) Gas Injection Turbo Compressor Modules &Rolls Royce RB211 DLNE/ABB Power Generation Units.

·  Responsibility for commissioning:

·  Siemens Flash Gas Turbo Compressor Modules x 3

·  Nuovo Pignone (GE) Raw (Sour) Gas Injection Turbo Compressor Modules x 2

·  Rolls Royce RB211 DLNE/ABB Power Generation Units x 4

·  Final Witness Acceptance of both contractor and sub-contractor work

·  Review final system dossiers including mechanical completion

·  Review Completion Documentation, punchlists, etc, via Qedi ACS system

·  Review Sub Contractor documentation

·  Reviewing all relevant Republic of Kazakhstan Government Regulatory documents

·  Customer Representative for the acceptance of the construction and commissioned systems

·  Defining System Limits for the contractor

·  Writing Commissioning procedures

·  Witness site commissioning

·  Review all drawings and as-built

·  Review all documentation

·  Created and implemented on site design changes

·  Training Kazakh Nationals on all areas of commissioning role

August 2007 – July 2009 Petroleum Development Oman Oman

PROJECT: Harweel Phase 2A/B Sour Gas Injection Project

Flawless Start-Up Initiative (FSI) & Systems Turnover Coordinator

·  Coordination of EPC (Petrofac) contractor FSI programs

·  Ensuring FSI Key Performance Indicators were achieved

·  Ensuring site quality tours with EPC and its sub-contractors

·  Held presentations on FSI status to management during the construction and commissioning phases of the project

·  Responsible for client monitoring of WinPCS on-site implementation and systems turnover coordination with PDO Construction and Commissioning & Start-Up team

·  Review final system dossiers including mechanical completion

·  Review Sub Contractor documentation

·  Coordinated Handover to Operations

·  Review all documentation

October 2005 – August 2007 TCO Tengizchevroil Kazakhstan

PROJECT: Tengiz Second Generation Project

Senior Mechanical Commissioning Engineer

·  Coordinate all discipline commissioning activities and tasks at site areas allocated

·  Responsibility for commissioning:

·  Utilities systems (Fire, N2, IA, etc)

·  Waste Water Treatment

·  Next Generation Gathering Systems (NGGS)

·  High Pressure Fuel Gas Systems

·  Sour Gas Injection Wells Phase 1

·  Supervision of Expatriate technicians and Kazak national trainees

·  Procedural writing and procedural reviews

·  Complete It (WinPCS) completions system for overall control of commissioning activities

·  Coordinate all Permits required for the activities and tasks

·  Review Sub Contractor documentation

·  Defining System Limits for the contractor

·  Prepare work schedules and plans for site engineers

·  Review all drawings and as-built

·  Review all documentation

April 2004 – October 2005 Petroleum Development Oman Oman

PROJECT: Harweel EDF Phase 1 Project

Deputy Commissioning Team Manager

·  Deputy Commissioning Team Manager

·  Responsible for commissioning of:

· 3 Nuovo Pignone Sour Gas reciprocating compressors

· 12 high sour production wells, Trunk line, Manifolds and main pipelines.

· Separation Train

· Nitrogen Generation package

· Kaeser Instrument Air Compressor package

· Atmospheric Flare

·  Defining System Limits for the contractor

·  Prepare work schedules and plans for site engineers

·  Prepare procedures for overall commissioning

·  Prepare PSSR documentation and plan

·  Review all drawings and as-built

·  Review all documentation

·  Handover to Operations

Dec 2003 – Mar 2004 Oman Gas Company Buraimi, Oman/ Al Ain, Abu Dhabi

PROJECT: Oman(Oman Gas Company) to UAE (Dolphin Energy) Fiscal Gas Metering &

Pressure Reduction Station

Commissioning Engineer

·  Deputy Commissioning Team Manager

·  Responsible for commissioning of:

· Fiscal Gas Metering Unit

· Pressure Reduction Train

· ABB & Invensys PLC/DCS System

·  Defining System Limits for the contractor

·  Prepare work schedules and plans for site engineers

·  Prepare procedures for overall commissioning

·  Prepare PSSR documentation and plan

·  Review all drawings and as-built

·  Review all documentation

Jan 2003 – Dec 2003 Petroleum Development Oman Oman

PROJECT: Qaharir Water Injection Project, Nimr Phase 5 Water Injection Project &

Rima Phase 2 Water Injection Project

Commissioning Engineer

·  Responsible for commissioning of:

· Sulzer & Nuovo Pignone Multi Stage Centrifugal pumps& associated systems

· Bentley Nevada Vibration Detection System

· Fisher Rosemount Delta V Digital Control System

·  Defining System Limits for the contractor

·  Prepare work schedules and plans for site engineers

·  Prepare procedures for overall commissioning

·  Prepare PSSR documentation and plan

·  Review all drawings and as-built

·  Review all documentation

July 2002 – Jan 2003 Petroleum Development Oman Oman

PROJECT: Haima West Water Injection Project

Commissioning/Start Up Engineer

Nov 2001 – July 2002 Petroleum Development Oman Oman

PROJECT: Yibal Single Station Project

Commissioning Engineer

July 2000 – Nov 2001 Petroleum Development Oman Oman

PROJECT: Haima West (Marmul A) Surface Production Sand Filtration Trials

Commissioning Engineer

July 1998 – July 2000 Bombardier Seeb, Muscat, Oman

Royal Oman Air Force Support Contract, Seeb Airbase, Oman

Aircraft Maintenance Supervisor/Instructor – Bell 204, 212 & 214 Helicopters

1984 – 1998 Royal Air Force (UK & Overseas) UK& Global

ROYAL AIR FORCE:

Aircraft Airframe & Engines Engineering Technician/Supervisor – Various aircraft types and models

Page 1 of 3