Trade of Plumbing
Module 3: / Domestic Heating/MMA Welding
Unit 4: / Commissioning and Maintenance
Phase 2


Trade of Plumbing – Phase 2 Module 3

Table of Contents

List of Figures 4

List of Tables 5

Document Release History 6

Module 4 – Domestic Hot and Cold Services 7

Unit 4 – Commissioning and Maintenance 7

Learning Outcome: 7

Key Learning Points: 7

Training Resources: 8

Key Learning Points Code 8

About Unit 4 9

Self Assessment 10

Exercise 10

Index 11

List of Figures

List of Tables

Document Release History

Date / Version / Comments /
June 2006 / V.1.0
17/02/14 / 2.0 / SOLAS transfer

Unit 4 6

Trade of Plumbing – Phase 2 Module 3

Module 4 – Domestic Hot and Cold Services

Unit 4 – Commissioning and Maintenance

Duration – 15 Hours

Learning Outcome:

By the end of this unit each apprentice will be able to:

·  Describe the commissioning procedure for domestic heating systems.

·  Describe the purpose and procedure for balancing heating systems.

·  Replace radiator valves and pumps in domestic heating systems.

Key Learning Points:

Rk / Commissioning procedures.
Rk Sc / Flushing through heating systems.
Sk / Filling and venting system.
Sk / Venting and adjusting pump.
Sk / Checking for leaks.
RK Sk / Balancing a heating system.
Sk / Identification of valves.
Sk / Checking safety valve.
Sk / Checking feed and expansion tank, water level, expansion pipe, overflow.
Rk / Chemical treatment for heating systems.
Sk / Draining heating system.
Sk / Replacing radiator valves.
Rk / Isolation of electrical supply.
Sk / Replacing pump.
Rk / Air locks in heating systems.
Rk / Cold spots in radiators, flushing radiators.
P / Communication and teamwork.

Training Resources:

·  Classroom facilities.

·  Information sheets.

·  Workshop facilities.

·  Domestic heating system.

Key Learning Points Code

M = Maths D= Drawing RK = Related Knowledge Sc = Science

P = Personal Skills Sk = Skill H = Hazards

Unit 4 11

Trade of Plumbing – Phase 2 Module 3

About Unit 4

This unit is primarily a skill based unit, please refer to your instructor.

Self Assessment

Exercise

1.  Describe the sequence of events when commissioning a heating system.

2.  State the purpose and procedure for balancing a heating system.

3.  State the pressure at which a domestic heating safety valve should open.

Index

Unit 4 11