CCC Marking Process(Model 1)
Relevant Implementation Instructions:
3.1 Available Certification Models
Model 1: type testing + Follow-up inspection
Model 2: Type testing + Initial inspection of the factory + Follow-up inspection
Follow-up inspection refers to Follow-up Investigation & On-site Production Sampling Test, Investigation & Selling Product Sampling Test and/or Investigation.
3.2 Select an appropriate model (For Household and Similar Electrical Appliances)
Products / Model 1 / Model 2Air Conditioners
Electric Motors
Compressors / Category I
Category II
(Note: Category I & II here can select Model 2 as well) / Category III
Category IV
Household Refrigerators
Food Freezers
Electric Fans
Household Washing Machines
Storage Water Heaters
Instantaneous Water Heaters
Room Heaters
Vacuum Cleaners
Appliances For Skin and Hair Care
Electric Irons
Electromagnetic Ovens
Roasters
Electric Food Processors
Microwave Ovens
Cooking Ranges, Cooking Table, Ovens And Similar Appliances
Range Hoods
Liquid Heaters
Cold and Hot-Type Water Dispensers
Electric Rice Cookers / Category I
(Note: Category I here can select Model 2 as well) / Category II
Category III
Category IV
Classification of manufacturers is detailed in appendix 1 of the CVC implementation instructions.
3.2 Select an appropriate model (For Electrical Accessories and Small Power Motors)
Model 1 / Model 2Category I
(Note: Category I here can select Model 2 as well ) / Category II
Category III
Category IV
Classification of manufacturers is detailed in appendix 1 of the CVC implementation instructions.
7.4 Frequency and Timing of Follow-up Inspection (For Household and Similar Electrical Appliances)
There are three methods of follow-up inspection: Investigation & On-site Production Sampling Test, Investigation & Selling Product Sampling Test or Investigation. Follow-up inspection can be performed by adopting a single method or multiple methods therein.
Category of Applicants / Frequency / ContentsCategory I / At least once every two years / End-of-production-line sampling test OR follow-up investigation OR selling products sampling test/check
Category II / At least once a year / End-of-production-line sampling test OR follow-up investigation OR selling products sampling test/check
Category III / At least once a year / Follow-up investigation + End-of-production-line sampling test AND/OR selling products sampling test/check
Category IV / At least twice a year / Follow-up investigation + End-of-production-line sampling test AND/OR selling products sampling test/check
For applicants adopting Model 1 for certification, in principle, initial factory inspection will be conducted within 3 months after the products being certified.
7.4 Frequency and Timing of Follow-up Inspection (For Electrical Accessories and Small Power Motors)
Category of Applicants / Frequency / ContentsCategory I / At least once every two years / End-of-production-line sampling test/check
follow-up investigation (If necessary)
selling products sampling test/check (If necessary)
Category II / At least once a year / End-of-production-line sampling test/check
follow-up investigation (If necessary)
selling products sampling test/check (If necessary)
Category III / At least once a year / Follow-up investigation + End-of-production-line sampling test/check AND/OR selling products sampling test/check
Category IV / At least twice a year / Follow-up investigation + End-of-production-line sampling test/check AND/OR selling products sampling test/check
For applicants adopting Model 1 for certification, in principle, initial factory inspection will be conducted within 3 months after the products being certified.
Address: No.3, Tiantaiyi Road, Kaitai Avenue, Science City, Guangzhou, 510663, P. R. China www.cvc.org.cn
TEL:(86-20)3229 3888 FAX:(86-20)3229 3889 Page 1 of 4