GL8K 22 / SVQ in Network Construction Operations (Water) — Main Layer at SCQF level 5
To attain all candidates must complete 11 mandatory units. For candidates following the distribution route, a further mandatory unit must be completed.
11mandatory units
1Distributionunit only if following the Distribution Route

Please note the table below shows the SSC identification codes listed alongside the corresponding SQA unitcodes. It is important that the SQA unitcodes are used in all your recording documentation and when your results are communicated to SQA.

Mandatory units: Network Construction Operations (Water) — Main Layer — candidates must complete all 11 units in this group
SQA code / SSCcode / Title / SCQF level / SCQF credits
FA89 04 / EUSMUNC01 / Create an Efficient and Effective Work Environment in Utilities Network Construction / 5 / 4
FA99 04 / EUSMUNC02 / Maintain a Safe and Secure Working Environment in Utilities Network Construction / 5 / 3
FA8H 04 / EUSMUNC03 / Establish and Maintain Effective Working Relationships in Utilities Network Construction / 5 / 3
FA91 04 / EUSMUNC05 / Install Equipment for Safe Working on Sites for Utilities Network Construction / 5 / 3
FG2W 04 / EUSMUNC06 / Locate and Avoid Supply Apparatus for Utilities Network Construction / 5 / 4
FA8M 04 / EUSMUNC07 / Excavate and Maintain Holes and Trenches for Utilities Network Construction / 5 / 5
FA9K 04 / EUSMUNC09 / Operate Powered Tools and Equipment for Routine and Predictable Requirements on the Utilities Construction Network / 5 / 5
FA96 04 / EUSMUNC10 / Joint Materials by Electrofusion Processes on Utilities Network Construction / 5 / 3
FA95 04 / EUSMUNC11a / Joint Materials by Butt Fusion Processes on Utilities Network Construction (up to 180 mm) / 5 / 3
Mandatory units: (cont)
SQA code / SSCcode / Title / SCQF level / SCQF credits
FA97 04 / EUSMUNC12 / Joint Materials by Mechanical Means on Water Construction Network / 5 / 4
FA8Y 04 / EUSMUNC13b / Install Engineering Products or Assets for Utility Network Construction (Water Mains up to 150 mm NB (180 mm PE)) / 5 / 5
Distribution Route – candidates following the distribution route must also complete the following unit.
FA92 04 / EUSMUNC04 / Install Equipment for Safe Working on the Highway for Utilities Network Construction / 5 / 4
Additional units — Candidates may also complete any of the additional units below, however they do not contribute to the achievement of the full SVQ.
Unit Code / SSC Ref / Unit Title / SCQF level / SCQF credit points
FC00 04 / EUSMUNC08 / Reinstate Excavation and Pavement Surfaces after Network Construction Operations / 5 / 5
FA94 04 / EUSMUNC11b / Joint Materials by Butt Fusion Processes on Utilities Network Construction (between 180mm and 315mm) / 5 / 3
FA93 04 / EUSMUNC11c / Joint Materials by Butt Fusion Processes on Utilities Network Construction (above 315mm) / 5 / 3
FA8X 04 / EUSMUNC13c / Install Engineering Products or Assets for Utility Network Construction (from 150mm NB (180mm PE) to 300mm NB (315mm PE)) / 5 / 5
FA8W 04 / EUSMUNC13d / Install Engineering Products or Assets for Utility Network Construction (above 300mm NB (315mm PE)) / 5 / 5
FA85 04 / EUSMUNC14 / Conduct Specified Testing of Water Network Engineering Products or Assets / 5 / 4
FC02 04 / EUSMUNC18 / Restore Water Network Components to Operational Condition by Repair / 5 / 5

GL8K 22SVQ in Network Construction Operations (Water) — Main Layer at SCQF level 51