CURRICULUM VITAE

NAME: Joseph Fisher

ADDRESS: 6a Piazzale Foscari, Apptment 3, 6 Aylesbury Ave. (UK)

Marghera, Prenton.

Venice, (VE). Wirral.

ITALY, CH43-0UD

DRIVING LICENCE: Full / Clean

MOBILE: (UK) 0044 - (0)7979791145 / (IT) 0039- 3459353829.

E-MAIL: /

WEB PAGE LINK; http://www.qaweldspec.co.uk ç (Click link for web page)

DISCIPLINE: QA/QC Mechanical Engineering (Including Welding Inspection,

Vendor Inspection,Welding/Strip Weld O/Lay; Conversant with WPQ various exotic S/S Duplex/Super Duplex corrosion resistance,(Heat input awareness) Piping,Valves,Fittings,

QA/QC Co-ordination), Witness of various FAT Testing operations including,Hydrotesting During Sub-Sea X Tree; P.E.D. qualifying pressure equipment.

O/LAY H/Wall.Reactors.Slug,Catchers.

F.A.T. Witnessing for Final Release. Absorbers,Heat,Exchangers.

Coolers.Waste,Heat,Recovery.Packages.Connectors/Hubbs; PLET,s+PLEM,s Pipeline,Termination,s.P.W.H.T.-Stress.Relief,Normalising, Quenching,Procedures .

ECDL Windows,PC.Literate,word attatchments,Excel,etc,

Sharepoint Global Internal Company communication conversant.

QUALIFICATIONS:

CSWIP, Senior Welding Inspector, level 3.2. (2010-2020)

P.C.N. Senior Welding Inspector 3.2. (2014-2024)

Radiographic Interpretation, ( PCN 3.2).(2014-2024)

Bs-En-Iso/Iec-17024

En-Iso-9712;2012

97/23/EC-PED

Registered Welding Inspector (T.W.I.)

European Welding Inspector

Approved mechanical surveyor (Zurich insurance)

City & Guilds Parts 1 & 2 Mechanical Engineering

Offshore survival fire-safety cert (expired)

B.N.F.L. Safety/Firefighting - B/A courses 1,2, r2,c2

SUMMARY OF EXPERIENCE;

A career of 30 years with a comprehensive and qualified working knowledge of across the spectrum of Inspection services, Witness and acceptance of WPS/WPQT All Mechanical Testing of various materials ranging between SSD-A790-F53- C/S-A694-F65; I.E. (HIC). Charpy, Tensile, Hardness, Awareness of Chemical Properties and Hardness Values, Heat Inputs, Corrosion susceptibility QA/QC Coordination and Document Control. Review/Control of ITP/IAP, M.D.R. activities, within the UK and Overseas. Experience gained on diverse projects on/offshore and provided a through knowledge of a wide range of materials /standards B.S / ASME-ANSI, (CRA Strip+Bead O/lay 625/825) and associated equipment. OCTG Casing, Steel Grading, Threaded drill pipe, Coil tubing, On/Offshore CWC Coated Linepipe, Various aspects of Drilling Equipment requirements, Witness of various FAT Testing operations including,Hydrotesting During Sub-Sea X Tree; Connectors/Hubbs; PHLET,s + PLEM,s Pipeline Terminations ,Fully conversant with British, European and American specifications and standards. Familiar with PED (Pressure Equipment Directive), also conversant with ATEX environmental classification and designation. Competent and able to comprehend and implement relevant agreed contract specifications and procedures.

MAY 2016. – NOV 2017.

TENZIG. O/LAY VESSEL SLUG CATCHERS,

Construction of four (4) X 18 ring large dia x H/W; W/t;250mm x Ф4800mm; Slug Catchers.

Full control of Q.C.P.; Overseeing and acceptance of TOFD Valdation prior to commencement and Full coverage of all TOFD circumferential weld testing operations raising/closeout of N.C.R.s review, witness, monitoring/random inspection and hold points, Witness of BASE PLATE to REACTOR template fitting simulation. Overseeing and review and signing off Q.C.P. material certification witnessing of mechanical testing chemical content of materials, adherence to set construction sequence steps, review of radiographs of all segmental head, circumferential, and longitudinal and Strip O/lay CRA (625/825) welding manual and sub/arc, positioning and fit up of all external fitments + nozzles, monitoring proximity and orientation as per drawing requirements; Surveillance during construction;

EMPLOYMENT: JANUARY 2015- DECEMBER 2015

GAS GATHERING PROJECT. (SHELL-AFRICA)

Resident Inspector Galperti Valves (GE) ITALY. Based in GE main facility( Colico) and also visits to outside MECH TEST house S-M-T. (Milan). Seconded to project from early first stage attending PPM including any relevant issues raised, Documentation submission and status, I.E.WPS material usage involved, Incoming Materials. Chemical Analysis.Mech Testing values and conditions required Tensile.Impact,Hardness, compatible with materials being used .Analysis of materials. overseeing all incoming materials LF-2 C/S + F-51 DLX-S/S. Control and overseeing of received materials proceeding to FORGING Cropping operations (Body-Closure Ball Seat), Control of ITP adherence of all designated steps within including full traceability Stamping. Serialisation. throughout from forging, H/T,;

Machining, Final Assembly FAT/HYPERBARIC function testing and Acceptance to release.

JUNE 2014 – NOVEMBER 2014

MCDERMOTTS MARINE SINGAPORE. INPEX ICHTHYS GAS DEVELOPMENT.

Working throughout EUROPE inspection and adherence to Approved project ITP visits to various suppliers and sub-suppliers, Valve Manufacturers, Pipe/Fittings suppliers (Butting Germany), SSD-A790-F53- C/S-A694-F65; Cameron Valves, H/T operators. Overseeing furnace operations load verification. Furnace Transfer time, Queching. Tempering operations.Mechcanical testing at various laboratories within ITALY. Ambient/Hot Tensile,Charpy.Hardness. Micro surface inspection.

FEBRUARY 2013 – JUNE 2014

VARIOUS END USERS AD-HOC VENDOR INSPECTION UK/EUROPE

Workshop inspection of construction of L/P-H/P Gas compressor + Rotation equipment. Hub + shaft matching, and couplings, Full inspection duties during construction of high/low-pressure gas turbine, Inlet/Exhaust Plenum, WHRU, HVAC, Main Compressor Structure Base Plate, Compression casings / Nozzles, vessels, Raw Material Cross Over Valve Block, Turbine Compressor, Lube Oil Heaters, Synthetic Lube Oil Coolers, Electric Motor test bed verification (pre-delivery), also witnessing of post test Inspection of: dry gas bearing seal Integrity. Casing gas seal test. Supplying various operating production module dry gas panels and integrated pipework. Coordination / communication and in -depth reporting between manufacturer and Customer contractual requirements; Ensuring all relevant documentation (full suite) is presented and Reviewed/Approved before signing off and issuing of IRN;Visit to Pipemill suppliers (Croatia) of exoctic steel materials (S/Duplex Zeron) review of weld procedures, Close attention of all aspects of WPS values (heat inputs) at time of welding. also test house achievments,(Charpy/Toughness) for C/S -30° ;

SNEPCo (SHELL) BONGA NORTHWEST PHASE 11

;

CAMERON VALVES (LEEDS) FLOW/SUBSEA CVC FABRICATION; RESIDENT CLIENT QA/QC INSPECTOR;

SEPTEMBER 11 – JANUARY 2013.

Subsea Hardware Inspector duties included surveillance Monitoring and attendance of Inspection and Test for CVC CONNECTORS/HUBS from raw to FAT condition all levels of assembly- Witness of Hold points as defined in the approved Contractor (Cameron) Inspection Test Plans on behalf of Company (SNEPCo); Review and acceptance of Contractor ITP QC records on behalf of Company;

Control and inform the Contractor of a non-conformance situation and request remedial action. Report non conformance as necessary, including agreeing detailed recommendations for remedial action with the Contractor; Provide QC progress reports to the Company project team; Resident Inspector at Cameron Leeds Facility, for manufacture, inspection and testing of Subsea Connector component parts; Coordinator Instructions / Comments / Work Scope; QA/QC European Vendor inspection (FAT) Attendance at material suppliers of Valve, Pipe, Fittings; Reviewing of material (Raw / Finished); Coating/insulation. Certification/Documentation according to relevant requirements and standards, verification of materials, Size/Grade and Traceability Markings, and Quantities,

Full control of Q.C.P.; Overseeing and acceptance of full Valve assembly levels from RAW foundry through machine levels COATING, HARDNESS,Bead WELD O/LAY-625/825 and PWHT procedures.

FAT TESTING operations raising/closeout of N.C.R.s Review, Witness, Monitoring/random inspection and Hold (H) Witness (W), points. Overseeing and Review (R) and signing off Q.C.P. material certification witnessing of mechanical testing chemical content of materials, adherence to set construction sequence steps; F.O.A.K / KPI, s observations and progress off IAP look ahead, Overall Surveillance during construction

Nuovo Pignone (GENP) FIRENZE.

DRAGADOS SUB SEA GAS STORAGE PROJECT RESIDENT CLIENT QA/QC INSPECTOR;

NOV 10 – JUNE 2011.

Familiar with aspects of the European PED (pressure equipment directive). The role was client position. And involved responding to requests for assistance as they work towards demonstrating PED compliance, act as a focal point for technical queries on other applicable EU directives E.G. Machinery, ATEX (zone classification), Construction Products WHRU, GAS PANELS, HEAT EXCHANGERS, ACCUMULATORS, COOLERS, etc.; Review and comment/annotate all presented working procedures by supplier using virtual reality CITRIX isolated system for acceptance.Qualification of C/S S/S/ Zeron, Super Duplex; Welding procedures, awareness of material characteristics, and control of al perameters required within WPQ (Heat input corrosion awareness)

QA/QC European Vendor inspection (FAT) Attendance at material suppliers of Valve, Pipe, Fittings Overlay/Cladded;(ITALY); reviewing of material (Raw / Finished); Certification/Documentation according to relevant requirements and standards, verification of materials, Size/Grade and Traceability Markings, and Quantities,

Full control of Q.C.P.; Overseeing and acceptance of WELD / PWHT procedures testing operations raising/closeout of N.C.R.s Review, Witness, Monitoring/random inspection and hold points, Overseeing and review and signing off Q.C.P. material certification witnessing of mechanical testing chemical content of materials, adherence to set construction sequence steps and progress of IAP look ahead, Overall Surveillance during construction

EXXON MOBIL EXPLORATION PROJECT; AB15 GAS GATHERING (ANGOLA)

PTL / MEL; Ltd; ABERDEEN, QA/QC CLIENT INSPECTOR

OCT 08 – Aug 10;

Overseeing/monitoring acceptance and review of radiographs signing off W.P.S, documentation and. material certification For sub-sea PLETS/ILT/PLEMS line Termination/Manifolds and inline fabrications, Witnessing of all WPS and subsequent mechanical testing and result evaluation of materials, Witnessing of pressurized simulation of pig retrieval and pig alert function. Compilation of progress status spreadsheet throughout all WPS qualification testing results, and all other relevant activities,

SHELL HARWHEEL PROJECT; (OMAN) VENDOR QA/QC INSPECTOR

JULY 07 – OCT 08

QA/QC European Vendor inspection Attendance at material suppliers of Valve, Pipe, Fittings; (ITALY); Galperti, Technoforge, Valve Italia, Santafede, Mega, .IBF, Dalmine, reviewing of material (Raw / Finished); Certification/Documentation according to relevant requirements and standards, verification of materials, Size/Grade and Traceability Markings, and Quantities, reporting to head office with detailed report of material cert content and documentation, Packing condition of precise amount of materials to be released.

Construction (Walter Tosto (Chieti) of five (5) large Dia x Med wall; W/t; 15 to 25 mm x Ф 400mm; Reactors;

Full control of Q.C.P.; Overseeing and acceptance of TOFD Validation prior to commencement and Full coverage of all TOFD circumferential weld testing operations raising/closeout of N.C.R.s review, witness, monitoring/random inspection and hold points, Overseeing and review and signing off Q.C.P. material certification witnessing of mechanical testing chemical content of materials, adherence to set construction sequence steps, review of radiographs of all segmental head, circumferential, and longitudinal welding manual and sub/arc, positioning and fit up of all external fitments + nozzles, monitoring proximity and orientation as per drawing requirements; Surveillance during construction;

EMPLOYMENT; RESIDENT CLIENT QA/QC INSPECTOR;

B.I.E. TECHNICAS REUNIDIAS RABIGH/PEMEX H/WALL REACTOR CONSTRUCTION;

A.T.B. FACILLITY BRESCIA (ITALY)

JULY 06 – JUNE 07;

Construction of four (4) large dia x heavy wall; w/t; 250mm x Ф4800mm; hydro/demet reactors;

Construction of various size load storage tanks,

Full control of Q.C.P.; Overseeing and acceptance of TOFD Validation prior to commencement and Full coverage of all TOFD circumferential weld testing operations raising/closeout of N.C.R.s review, witness, monitoring/random inspection and hold points, Witness of BASE PLATE to REACTOR template fitting simulation. Overseeing and review and signing off Q.C.P. material certification witnessing of mechanical testing chemical content of materials, adherence to set construction sequence steps, review of radiographs of all segmental head, circumferential, and longitudinal and Strip O/lay CRA (625/825) welding manual and sub/arc, positioning and fit up of all external fitments + nozzles, monitoring proximity and orientation as per drawing requirements; Surveillance during construction;

EMPLOYMENT;

NUOVO-PIGNONE (ITALY): QATAR GAS II + III. + RAS-LAFFAN PROJECT.

QA/QC INSPECTOR

FEB. 06 – MAY 06.

Workshop inspection of construction of C3 (propane)-N2 (nitrogen)+MR (mix) gas compressor casings + Rotation equipment. Hub + shaft matching, and couplings,

Full inspection duties during construction of heavy wall casting, high-pressure gas turbine compression casings / vessels, Turbine compressor and electric motor test bed verification, also witnessing of post test Inspection of: dry gas bearing seal Integrity. Casing gas seal test, vendor inspection visits to outside Contractor. Supplying various operating production module panels. Coordination / communication and in -depth reporting between manufacturer and Customer contractual requirements i.e. raising and close-out of N.C.R.’S;

EMPLOYMENT:

B.I.E; WOODSIDE P.O.G. PROJECT BUTTING PIPEMILL (GERMANY)

AUG. 05-FEB 06

Material inspection of outer carbon steel and cladded stainless steel line pipe,

Traceability of all materials pertaining to C.R.A. Line Pipe.Inspection of W/T;

1st + 2nd End-Main Body ID / OD; O.O.R; O.O.S.; Coating and coat repairs

Witnessing of welding process for welding of longitudinal welded seams prior

To internal and external pipe being sleeved and hydro statically expanded

To Buttings B.U.B.I. C.R.A.line pipe process,

Final bench inspection of all pipe i.e. Hydrostatic Testing, Ovallity checking, Identification Stamping, Prior to final release of C.R.A. line pipe for despatch.

STOLT OFFSHORE (NORWAY); LANGLED PROJECT

MAR.05 – JULY 05

Pipe Tracking and Loadout of all Plain, Anode & EX-H/W Buckle Arrestors C.W.C. carbon steel pipes from pipe coating contractor Bredero Shaw (Norway), for construction of sub sea pipeline, supplying L.B. 200, lay barge. Visual inspection of pipes, numbering, and condition of concrete coating and exposed steel, receipt of all O,S,D, Documentation to put through the system, compilation of email information, as per load out,

MOODY INTERNATIONAL (UK) QA/QC VENDOR INSPECTOR

FEB.04 – FEB.05

QA/QC Vendor inspection of construction of Wellhead & horizontal xmas tree actuator gate and needle valves, nitrogen gas + hydro test witnessing of up/downstream, actuator function test at valve manufacturers; Oliver valves(Manchester) / Bentley(stroud), Attendance at material suppliers of pipe and fittings, review of material certification/documents according to relevant standards, verification of materials, Size/grade and traceability markings, and quantities, reporting to head office with detailed daily report of material content and documentation precise amount of materials to be released.

AL JAWABI OIL COMPANY (LIBYA) PLANT QA/QC INSPECTOR

MAR. 03- NOV. 03

Petro/chem. Discharge terminal mechanical / tank inspection, witnessing of p.s.v. And actuator function tests on test beds for all gas plant vessel and production piping systems throughout. Gas plant. Renewal of tank floors, shell plates, roof and all associated pipe work, also refurbishment of 20” condensate pipeline desert based, front end inspection, coating, hydro testing, ditching, backfill. Review of final hand over packages prepared by contractor.

BORD GAIS ERIN/ MCO,S CLIENT QA/QC INSPECTOR
JAN. 02 – DEC. 02

Gas pipeline to the west 30” gas pipeline Dublin to Galway overseeing of joint venture contractors. Sacim/Roadbridge. General surveillance of all pipeline construction duties, familiar with semi automatic welding processes,saturnax (crc) passo and vermatt, carrying out parameter checks during mainline production, final cathodic protection and Pearson testing and coating integrity acceptance, review of contractor’s final documentation packages prior to acceptance by s.p.i.

I.A.C.S. LTD WELDING / COATING INSPECTOR OCT. 01 - JAN. 02