NOTICE OF PUBLIC MEETING
A Public Meeting of the Planning & Projects Committee will be held as follows:
Date:February 1, 2016
Time:Immediately Following Finance Committee Meeting
Place:220 Clendenning Rd
Houma, LA 70363
- Meeting Called to Order
- Roll Call
- Public Comments
- Management’s Report
a)In-house Projects and Equipment – Update
- Executive Director’s Report
a)Discussion and Possible Action – CPRA Cooperative Endeavor Agreement No. 2503-16-14 – Bayou Lacache Wetland Operations & Maintenance – Resolution No. 16-003
b)Discussion and Possible Action – CPRA Intergovernmental Agreement with TLCD – Montegut Wetlands Project FEMA PW 1908 – Resolution No. 16-004
c)Discussion and Possible Action – Engineering Amendment for Delta Coast Consultants
d)Discussion and Possible Action – Recommendation of Award of the Bayou Pointe-aux-Chenes Floodgate Structure Project
e)Discussion & Possible Action – Amend the Contract Quantities for the Annual Dirt Supply Contract for an Additional Cubic Yards
f)Discussion & Possible Action of Bidding Lower Reach F Rehabilitation & Planting
g)Other Discussions and Announcements
- Engineer’s Report
a)All South Consultants, Inc.
1)Reach K & L Permit – South Lafourche Levee District - Update
2)Lower Dularge Levee East
b)CB&I
1)Houma Navigation Canal Lock- Update
2)Lower Bayou Dularge (West) Levee Alignment Project – Update
3)Reach B Levee Alignment Project - Update
4)Pointe-aux-Chenes Structure - Update
5)Falgout Canal Structure - Update
6)Reach H Mitigation - Update
7)Reach H2/H3 Levee Alignment- Update
8)Upper Reach F Levee Alignment –Update
9)Bayou Petit Caillou Structure – Update
c)Providence/GSE
1)Reach J Segment 3 Project - Update
2)Falgout Canal Road Levee Project – Segment 1 Update
3)Falgout Canal Road Levee Project – Segment 2 Update
4)MTG Reach G – Segment 2– Update
a)Part "a"
b)Part "b"
c)Part "c"
5)Four Point Road Ramp - Update
6)Reach H Segment 1 Project – Update
d)T. Baker Smith, LLC
1)TLCD General Services Agreement - Update
2)Reach I Levee - 2nd Lift – Update
3)Bayou Terrebonne Floodgate Modifications – Update
4)Boudreaux Canal Sector Gate Project - Update
5)Reach E Environmental Water Control Structures Project - Update
e)Delta Coast Consultants, LLC
1)Program Manager
a)Update and Discussion of Resolution No. 16-001 2016 High River Event
b)Discussion and Possible Action – Authorize Director to Negotiate Options and/or Leases of Future Dirt Pits
c)Reach H-2 & H-3 Maintenance Levee Lift Project - Update
d)MTG Western Tie-in Feasibility Study
e)Reach G2 & H1 Mitigation – Marsh Creation Project
f)Reach J-2 Maintenance Project
g)Share Point Project
h)Discussion & Possible Action – Update on Sandblasting, Painting, and Dry Docking (where applicable) of Upper Little Caillou Barge, Upper Little Caillou Receiving Structure, Gibson/Bayou Black Floodgate, TLCD #2 (Old Parish Spud Barge), Lower Dularge Receiving Structure, Placid Canal Structure, and Bush Canal Structure.
- President’s Report
- Adjourn
Angela Rains, Secretary