The purpose of the Full Traceability Report – Protocols through Design Documents is to list the requirements, desk procedures, and design documents that trace from the Marketplace Protocols, indicating full coverage of SPP’s implementation of the Protocols for Integrated Marketplace. The report shows each traceable Protocol statement, followed by the related artifacts that carry out the intent of the Protocols. Each artifact listed is shown at its highest level, providing the requirement name, procedure name, or reference document name, along with its unique alpha-numeric identifier.

Following is a sample of the content found in this report, including a legend for interpretation. Protocols, requirements, procedures, and design documents are assigned unique identifiers, which aid in traceability.

Trace Report

4.1.1 Reserve Zone Establishment (PROTO799)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR901 - Create Mid-Term Load Forecasts

DESK4581 - Reserve Zone Establishment

4.1.2 Forecasting (PROTO4494)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4283 - Load and Losses DDN

4.1.2.1 Short Term and Mid-Term Load Forecasting (PROTO4495)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4283 - Load and Losses DDN

UCFR901 - Create Mid-Term Load Forecasts

UCFR3781 - Create Short-Term Load Forecast

4.1.2.1.1 Conforming Load (PROTO4496)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR3782 - Create Average Conforming Load

REF4283 - Load and Losses DDN

UCFR1375 - Market Participant submits Conforming Load Data to SPP

4.1.2.1.2 Non-conforming Load (PROTO4498)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR3782 - Create Average Conforming Load

REF4283 - Load and Losses DDN

UCFR2050 - Market Participant submits Non-Conforming Load Data to SPP

4.1.2.1.3 Losses (PROTO4499)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR901 - Create Mid-Term Load Forecasts

REF4283 - Load and Losses DDN

UCFR3781 - Create Short-Term Load Forecast

4.1.2.1.4 Demand Response Adjustments (PROTO4501)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4281 - MKTNET DDN

UCFR4126 - Adjust Dispatchable Demand Response/Block Demand Resources

UCFR3781 - Create Short-Term Load Forecast

4.1.2.1.5 Reserve Zone Load (PROTO4502)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4283 - Load and Losses DDN

UCFR3781 - Create Short-Term Load Forecast

4.1.2.1.6 Load Distribution (PROTO4503)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4283 - Load and Losses DDN

UCFR3781 - Create Short-Term Load Forecast

4.1.2.2 Wind-Power Generation Resource Output Forecasts (PROTO4505)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR3292 - Produce Wind (Intermittent) Resource Forecast

REF5047 - MDB Schema

4.1.3 Operating Reserve Requirements (PROTO1256)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR1884 - Determine Reserve Zone Minimum and Maximum Operating Reserve Requirements

UCFR1956 - MS bridges Real-Time Operating Reserve data from PSR

UCFR1270 - MS bridges DA Cleared Operating Reserves data from PSR

UCFR858 - RUC Operator creates the RUC Case

REF4286 - Reserve Requirement DDN

REF4285 - MUI DDN

4.1.3.1 Reserve Zone Requirements (PROTO1257)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR2088 - Operating Reserve System determines expected power flow

UCFR858 - RUC Operator creates the RUC Case

REF4286 - Reserve Requirement DDN

4.1.3.1.1 Minimum Reserve Zone Operating Reserve Requirements (PROTO1258)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR2089 - Operating Reserve System determines Reserve Zone Minimum

REF4286 - Reserve Requirement DDN

4.1.3.1.2 Maximum Reserve Zone Operating Reserve Limitations (PROTO1259)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR2090 - Operating Reserve System determines Reserve Zone Maximum

REF4286 - Reserve Requirement DDN

4.1.4 Violation Relaxation Limits (PROTO599)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4277 - RTBM DDN

UCFR1177 - Trigger VRLs

UCFR925 - RUC Operator/system (in the case of an auto start) executes RUC

REF4128 - Day Ahead DDN

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.1.4.1 Impact of VRLs on LMPs and MCPs (PROTO600)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4292 - MCE Formulation DDN

UCFR925 - RUC Operator/system (in the case of an auto start) executes RUC

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.1.4.2 Determination of VRLs (PROTO814)

Traces to Requirements, Desk Procedures, or Design Documents:

DESK4691 - Review VRLs

DESK4693 - Publish Approved VRLs

DESK4692 - FERC Approval of VRLs

4.1.4.3 VRL Reporting (PROTO815)

Traces to Requirements, Desk Procedures, or Design Documents:

DESK4694 - VRL Report

4.1.4.3.1 Quarterly Reporting (PROTO816)

Traces to Requirements, Desk Procedures, or Design Documents:

DESK4694 - VRL Report

4.1.4.3.2 Annual Reporting (PROTO817)

Traces to Requirements, Desk Procedures, or Design Documents:

DESK4694 - VRL Report

4.1.5 Scarcity Pricing (PROTO818)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4128 - Day Ahead DDN

UCFR1160 - Trigger System-Wide Scarcity Pricing

UCFR1166 - Trigger Reserve Zone Scarcity Pricing

REF4292 - MCE Formulation DDN

REF4277 - RTBM DDN

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.1.5.1 Demand Curve Interaction with VRLs (PROTO820)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR1160 - Trigger System-Wide Scarcity Pricing

UCFR1166 - Trigger Reserve Zone Scarcity Pricing

REF4292 - MCE Formulation DDN

REF4277 - RTBM DDN

REF4128 - Day Ahead DDN

4.1.6 Ramp Sharing (PROTO819)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4128 - Day Ahead DDN

UCFR1172 - Trigger Ramp Sharing

REF4292 - MCE Formulation DDN

REF4277 - RTBM DDN

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.1.7 Outage Scheduling and Reporting (PROTO2468)

Traces to Requirements, Desk Procedures, or Design Documents:

DESK4695 - Generation/Transmission Maintenance Coordination

REF4578 - Outage Scheduler - CROW

4.1.8 Joint Operating Agreements--Seams Coordination (PROTO4506)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4292 - MCE Formulation DDN

4.2.1 Must-Offer Requirement (PROTO1768)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR858 - RUC Operator creates the RUC Case

UCFR138 - RTBM System retrieves RTBM Resource Offers.

UCFR496 - Day-Ahead Market Operator reviews and modifies certain Day-Ahead Offers/Bids

4.2.1.1 Day-Ahead Market (PROTO2576)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4285 - MUI DDN

DESK4955 - Market Monitoring Unit Procedures

4.2.1.2 RUC and RTBM (PROTO2577)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4285 - MUI DDN

DESK4955 - Market Monitoring Unit Procedures

4.2.2 Offer Submittal (PROTO1128)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4285 - MUI DDN

UCFR138 - RTBM System retrieves RTBM Resource Offers.

UCFR496 - Day-Ahead Market Operator reviews and modifies certain Day-Ahead Offers/Bids

4.2.2.1 Resource Offer Parameters (PROTO1129)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4285 - MUI DDN

UCFR2711 - Mitigate Physical Parameters Levels

UCFR495 - Day-Ahead Operator creates the Day-Ahead Case

4.2.2.1.1 Resource Ramp Rate Interaction - Energy & Operating Reserve (PROTO6050)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR177 - RTBM Operator reviews SCED results, determining if there is an actual Operating Reserve/Generation shortage

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.2.2.2 Resource Status (PROTO1284)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR495 - Day-Ahead Operator creates the Day-Ahead Case

4.2.2.2.1 Commitment Status (PROTO1285)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4285 - MUI DDN

UCFR495 - Day-Ahead Operator creates the Day-Ahead Case

4.2.2.2.2 Dispatch Status (PROTO1286)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4285 - MUI DDN

UCFR495 - Day-Ahead Operator creates the Day-Ahead Case

4.2.2.3 Resource Limit Validation (PROTO3531)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4285 - MUI DDN

4.2.2.4 Resource Commitment Parameter Relationships (PROTO3532)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4129 - RUC DDN

REF4128 - Day Ahead DDN

4.2.2.4.1 Start-Up and Shut-Down Times (PROTO5165)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4129 - RUC DDN

REF4128 - Day Ahead DDN

4.2.2.5.1 Disptachable Demand Response Resource (PROTO1293)

Traces to Requirements, Desk Procedures, or Design Documents:

DATA2021 - Bill Determinant: RtBaseLineHrlyQty (upstream)

UCFR524 - Execute the Day-Ahead Market

REF4283 - Load and Losses DDN

UCFR6470 - Consume ICCP Model

4.2.2.5.2 Block Demand Response Resource (PROTO1294)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4283 - Load and Losses DDN

DATA2021 - Bill Determinant: RtBaseLineHrlyQty (upstream)

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

UCFR6470 - Consume ICCP Model

4.2.2.5.3 Combined Cycle Resource (PROTO1295)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4285 - MUI DDN

DATA1411 - Bill Determinants: DaTransitionHrlyAmt (upstream)

DATA3025 - Bill Determinant: RtTransition5minAmt

REF4292 - MCE Formulation DDN

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.2.2.5.4 Jointly Owned Unit (PROTO1299)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4277 - RTBM DDN

REF4129 - RUC DDN

REF4128 - Day Ahead DDN

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.2.2.5.5 Dispatchable Variable Energy Resources (PROTO3533)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR1145 - RTBM - Execute SCED Software

REF4285 - MUI DDN

REF4277 - RTBM DDN

4.2.2.5.6 Non-Dispatchable Variable Energy Resources (PROTO5166)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4287 - MOI Essentials DDN

REF4277 - RTBM DDN

REF4293 - RTGEN CBA DDN

REF4284 - Pre-RTBM DDN

REF4304 - Resource Management DDN

REF4292 - MCE Formulation DDN

4.2.2.5.7 External Dynamic Resource (PROTO6051)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4277 - RTBM DDN

REF4128 - Day Ahead DDN

REF4292 - MCE Formulation DDN

REF6411 - Market Mitigation DDN

UCFR6470 - Consume ICCP Model

4.2.2.6 Virtual Energy Offers (PROTO1287)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4285 - MUI DDN

REF4697 - Credit Analysis Requirements

UCFR495 - Day-Ahead Operator creates the Day-Ahead Case

4.2.2.7 Import Interchange Transaction Offers (PROTO1226)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4277 - RTBM DDN

REF4128 - Day Ahead DDN

DESK4573 - RT_OSS

REF4129 - RUC DDN

UCFR495 - Day-Ahead Operator creates the Day-Ahead Case

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.2.3 Bid Submittal (PROTO1221)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR858 - RUC Operator creates the RUC Case

UCFR142 - RTBM System retrieves all Interchange Transactions.

REF4285 - MUI DDN

UCFR495 - Day-Ahead Operator creates the Day-Ahead Case

4.2.3.1 Demand Bids (PROTO1288)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4285 - MUI DDN

REF4697 - Credit Analysis Requirements

UCFR495 - Day-Ahead Operator creates the Day-Ahead Case

4.2.3.2 Virtual Energy Bids (PROTO1289)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4285 - MUI DDN

REF4697 - Credit Analysis Requirements

UCFR495 - Day-Ahead Operator creates the Day-Ahead Case

4.2.3.3 Export Interchange Transaction Bids (PROTO1216)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4129 - RUC DDN

REF4128 - Day Ahead DDN

DESK4573 - RT_OSS

UCFR495 - Day-Ahead Operator creates the Day-Ahead Case

REF4292 - MCE Formulation DDN

REF4277 - RTBM DDN

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.2.4 Through Interchange Transactions (PROTO1222)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4129 - RUC DDN

REF4128 - Day Ahead DDN

DESK4573 - RT_OSS

UCFR495 - Day-Ahead Operator creates the Day-Ahead Case

REF4277 - RTBM DDN

REF4292 - MCE Formulation DDN

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.2.5 Ramp Reservation Requirements (PROTO3535)

Traces to Requirements, Desk Procedures, or Design Documents:

DESK4698 - Ramp Reservation

REF4952 - OATI Design Document

4.2.6 Multi-Day Reliability Assessment (PROTO1769)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4129 - RUC DDN

4.2.6.1 Multi-Day Reliability Assessement Inputs (PROTO1770)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR858 - RUC Operator creates the RUC Case

REF4129 - RUC DDN

4.2.6.2 Multi-Day Reliability Assessment Analysis (PROTO1771)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR925 - RUC Operator/system (in the case of an auto start) executes RUC

REF4129 - RUC DDN

4.2.6.3 Multi-Day Reliability Assessment Results (PROTO1263)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR928 - RUC Operator approves specific RUC Results

REF4129 - RUC DDN

UCFR495 - Day-Ahead Operator creates the Day-Ahead Case

4.3 Day Ahead Activities (PROTO722)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4128 - Day Ahead DDN

4.3.1 Day Ahead Market (PROTO723)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4285 - MUI DDN

REF4128 - Day Ahead DDN

4.3.1.1 DA Market Inputs (PROTO724)

Traces to Requirements, Desk Procedures, or Design Documents:

UCFR156 - Create Day-Ahead Market Case

REF4292 - MCE Formulation DDN

REF4128 - Day Ahead DDN

4.3.1.2 DA Market Execution (PROTO734)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4292 - MCE Formulation DDN

UCFR1271 - MS bridges DA Locational Marginal Price (LMP) data from PSR

UCFR1272 - MS bridges DA Market Clearing Price (MCP) data from PSR

REF4128 - Day Ahead DDN

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.3.1.2.1 Clearing During Capacity Shortage (PROTO748)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4292 - MCE Formulation DDN

REF4128 - Day Ahead DDN

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.3.1.2.2 Clearing During Excess Generation Conditions (PROTO753)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4292 - MCE Formulation DDN

REF4128 - Day Ahead DDN

UCFR563 - Day-Ahead Market Operator executes the Day-Ahead Market

4.3.1.3 DA Market Results (PROTO756)

Traces to Requirements, Desk Procedures, or Design Documents:

REF4128 - Day Ahead DDN

UCFR1273 - MS bridges DA Cleared Resource Offer data from PSR

UCFR1271 - MS bridges DA Locational Marginal Price (LMP) data from PSR

UCFR1272 - MS bridges DA Market Clearing Price (MCP) data from PSR

UCFR576 - Day-Ahead Market System communicates the public Day-Ahead Market data to allMarket Participants

REF4285 - MUI DDN

UCFR575 - Day-Ahead Market System communicates the confidential Market Participantspecific data to each Market Participant

4.3.2 Day-Ahead Reliability Unit Commitment (PROTO759)

Traces to Requirements, Desk Procedures, or Design Documents: