ISO/TC 67/SC 4 N426R2
19th Meeting Report of the ISO/TC 67/SC 4 Secretariat
2009-05-19 to 2009-05-20Delft, Netherlands
1Secretariat:ANSI (Administered by API)
2Chairman:Austin Freeman
Halliburton
2601 Beltline Road
Carrollton, Texas 75006
USA
Tel: + 1 972418-3982
Fax: + 1 972418-3728
Email:
3Secretary:Ed Baniak
American Petroleum Institute
1220 L Street NW
Washington, DC 20005
USA
Tel: + 1 202 682-8135
Fax: + 1 202 962-4797
Email:
4Membership:(Updated with Kazakhstan)
P Members(15) / O Members (5)Argentina ( IRAM ) / Romania ( ASRO )
Brazil ( ABNT ) / Russian Federation ( GOST R )
Canada ( SCC ) / Serbia ( ISS )
China ( SAC ) / South Africa ( SABS )
France ( AFNOR ) / Spain ( AENOR )
Germany ( DIN )
Indonesia ( BSN )
Italy ( UNI )
Kazakhstan ( KAZMEMST )(new)
Korea, Republic of ( KATS )
Netherlands ( NEN )
Norway ( SN )
Poland ( PKN )
Sweden (SIS)
United Kingdom ( BSI )
USA ( ANSI ) (Secretariat)
5Scope
Standardization of drilling and production equipment used in the petroleum, petrochemical and natural gas industries.
6Organizational Structure
The organizational structure of ISO/TC 67/SC 4 is as follows:
WorkgroupSecretariatConvenor
WG 1Drilling equipment ANSI Mr. D. Lewis
WG 2Drilling well control equipment AFNORMr. M. Grépinet
WG 3Wellhead and Christmas tree equipmentNEN Mr. R. Langereis
WG 4Production equipmentNEN Mr. E. Dijkhuis
WG 6Subsea equipmentSNMr. J.H. Neuenkirchen
7Work Programme
See Annex A for a complete listing of the work in progress and published standards within SC 4. The following are International Standards from the ISO/TC 67/SC 4 work programme published within the last year by ISO.
ISO 14310:2008 / Petroleum and natural gas industries -- Downhole equipment -- Packers and bridge plugsISO 10407-2:2008 / Petroleum and natural gas industries -- Rotary drilling equipment -- Part 2: Inspection and classification of used drill stem elements
ISO 13628-11:2007/
Cor 1:2008 / Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 11: Flexible pipe systems for subsea and marine applications – Corrigenda 1
From the work program updated in October 2008, there were 11 standards that are to be published in SC4 in 2009.
9Meetings
The following meetings have been held since the June 2008 meeting of ISO/TC 67/SC4:
WG 1 / No full WG meetings held, however various meetings have been held on specific itemsWG 2 / No full WG meetings held, however various meetings have been held on specific items
WG 3 / 2008 – October / London, UK
WG 4 / 2008 – August
2009 – January / Houston, TX, USA
San Antonio (Joint Leadership meeting with API SC19)
WG 6 / 2008-06-25 / Calgary, Alberta, Canada
The following meetings are planned:
WG 1 / No meetings plannedWG 2 / No meetings planned
WG 3 / 2009-06-23 / Westminster (Denver), Colorado, USA
WG 4 / 2009 – August (tentative) / Houston, Texas, USA
WG 6 / 2009-06-24 / Westminster (Denver), Colorado, USA
8Overall progress/Concerns
- Withdrawal of participation due to business conditions.
- Resource constraints of both committee volunteer time and travel opportunities continue to slow progress.
9TC67 Plenary Meeting Review- Relevant Resolution
Resolution 8 (Beijing, 2008) ISO/TC 67 approves the revised SC6 target dates as presented in document N 1026 Add 1, and decides to reallocate the Compact Flange Project, 27509, to SC6/WG 5.
Resolution 9 (Beijing, 2008) ISO/TC 67 requests its Management Committee to review the SC6 Process Guide and determine if it can be used as a template for work within other TC67 subcommittees and with other standards developing organizations.
Resolution 13 (Beijing, 2008) ISO/TC 67 requests its P-members either confirm their existing or nominate new technical experts to TC 67/WG2 to work on the next edition of TS 29001, with an initial meeting planned for 22 January, San Antonio, USA. WG2 Secretary is requested to make a call for experts.
The nextplenary meeting of TC67 will be 2009-10-01 to 2009-10-02 in Victoria, British Columbia.
The 2010 meeting is planned forDoha, Qatar.
10SC4 Outstanding Resolutions
Resolution 3 (Calgary, 2008) ISO/TC 67/SC 4 encourages the WG convenors to make use of funding available from OGP and API for editorial services.
Resolution 6 (Calgary, 2008) ISO/TC 67/SC 4 recommends that aNWIP is required to address the heavy-wall drill pipe work and to encourage API and other national bodies to incorporate any work that needs to be added this next edition of ISO 10424-1, as an enhancement to the existing requirements.
Resolution 7 (Calgary, 2008) ISO/TC 67/SC 4 recommends that a NWIP is raised for the next revision of ISO 13626 to proceed under the minor revision process. Systematic review closed 3/16/09.
Resolution 8 (Calgary, 2008) ISO/TC 67/SC 4 recommends that a NWIP is required in order to align the existing ISO 14693 document with the modified addenda of API Spec 7K, 4th Edition (currently equivalent document) since these modified addenda were published in 2007. Systematic review closed 3/16/09.
Resolution 9 (Calgary, 2008) ISO/TC 67/SC 4 requests its secretariat to ensure that the work programme information is routinely updated on the ISO/TC 67/SC 4 website.
Resolution 12 (Calgary, 2008) ISO/TC 67/SC 4 recommends that API poll the API Licensees on API Spec 6A to determine their position on the use of castings vs forgings for PSL 3 or higher and to report the results to the WG3 convenor by the end of September 2008.
Resolution 15 (Calgary, 2008) ISO/TC 67/SC 4 requests all WG convenors update their WG rosters to account for PL representation on the WG and listing sub-workgroup task force membership.
Resolution 16 (Calgary, 2008) ISO/TC 67/SC 4 recommends that a NWIP for ISO 13628-7 be developed by WG6.NWI open for ballot. Closes 4/30/2009
All the remaining resolutions have been closed.
1
ISO TC67/SC4 Report
Annex A: Work Program – Currently Active and PublishedISO/TC 67/SC 4 N426
Document / Year / Title (Includes “Petroleum and natural gas industries…) / Related Docs|Cen Info / Dates/Comments / Project LeaderWorkgroup 1 – Drilling Equipment David Lewis, convenor ()
10407 / 1993 / Drilling and production equipment - Drill stem design and operating limits / API RP 7G | CEN/TC 12 WI 410407-1 / 1993 / Rotary drilling equipment - Part 1: Drill stem design and operating limits / API RP 7G | CEN/TC 12 WI 92 / CD comment period opens 2005-01-10, terminated 2005-04-11. DIS in preparation. Will use OGP for editing. / Chris North
10407-2 / 2008 / Rotary drilling equipment - Part 2: Inspection and classification of drill stem elements / API RP 7G-2 | CEN/TC 12 WI 93
10424-1 / 2004 / Rotary drilling equipment - Part 1: Rotary drill stem elements / API Spec 7-1 | CEN/TC 12 WI 121
10424-2 / 2007 / Rotary drilling equipment - Part 2: Threading and gauging of rotary shouldered threaded connections / API Spec 7-2 | CEN/TC 12 WI 122
13534 / 2000 / Drilling and production equipment -Inspection, maintenance, repair and remanufacture of hoisting equipment / API RP 8B | CEN/TC 12 WI 35 / DIS ballot circulated 2008-02-28, closed 2008-07-23 / Alf Aker
13535 / 2000 / Drilling and production equipment - Hoisting equipment / API Spec 8C | CEN/TC 12 WI 36 / DIS Ballot circulated 2008-02-24, closed 2008-07-23 / Alf Aker
13626 / 2003 / Drilling and production equipment - Specification for drilling and well-servicing structures / API Spec 4F | CEN/TC 12 WI 51
14693 / 2003 / Drilling and well-servicing equipment / API Spec 7K | CEN/TC 12 WI 100
Workgroup 2 – Drilling Well Control Equipment Michel Grépinet, Convenor ()
13533 / 2001 / Drilling and production equipment - Drill through equipment / API Spec 16A | CEN/TC 12 WI 3913533
TECH CORR 1 / 2005 / Drilling and production equipment - Drill-through equipment - Technical Corrigendum 1
13624-1 / Drilling well control systems - Design and operation of marine drilling riser systems / API RP 16Q | CEN/TC 12 WI 49 / DIS ballot terminated 2007-10-24. FDIS accepted for processing on 2008-09-05 / Paul Stanton
TR 13624-2 / Drilling well control systems - Part 2: Applications of marine drilling riser system analysis / API RP 16Q / CDTR ballot terminated. Document approved for DTR on 2008-08-18 / Paul Stanton
13625 / 2002 / Drilling and production equipment - Marine drilling riser couplings / API Spec 16R | CEN/TC 12 WI 50 / See 13628-12 Below / Paul Stanton
22830 / Drilling and production equipment – Control systems for drilling well control equipment and diverter systems / API Spec 16D / NWI (N414) closed 2009-03-18 to reinstate project as CD. Publication target date 2011 / Joe Roche
NEW / NEW / Drilling and production equipment – Shallow gas diverter equipment / API RP 64 / NWI (N417) closed on 2009-04-30 / Michel Grepinet
Workgroup 3 – Wellhead and Christmas Tree Equipment Ries Langereis, Convenor ()
10423 / 2003 / Drilling and production equipment -Wellhead and Christmas tree equipment / API Spec 6A | CEN/TC 12 WI 158 / DIS ballot circulated 2008-04-11, closed 2008-09-11. FDIS in preparation / Ries LangereisWorkgroup 4 – Production Equipment Bert Dijkhuis, Convenor ()
10417 / 2004 / Subsurface safety valve systems - Design, installation, operation and redress / API RP 14B | CEN/TC 12 WI 610428 / 1993 / Sucker rods (pony rods, polished rods, couplings and sub-couplings) - Specification / API Spec 11B | CEN/TC 12 WI 15 / DIS ballot circulated 2007-10-17, terminated 2008-03-18. FDIS in preparation. Project leader has advised he is stopping work on the item. Proposed DIS in 2007 and FDIS in 2008. Document withdrawn as ISO project / Benny Williams
10431 / 1993 / Pumping units - Specification / API Spec 11E | CEN/TC 12 WI 16 / DIS ballot initiated 2006-10-26, terminated 2007-03-26. FDIS completed but lacks correct metric units. API Spec 11E issued based on FDIS without metric units. Proposed FDIS 2007. Document withdrawn as ISO project / David Doyle
10432 / 2004 / Downhole equipment - Subsurface safety valve equipment / API Spec 14A | CEN/TC 12 WI 139
14310 / 2008 / Downhole equipment - Packers and bridge plugs / API 11D1 | CEN/TC 12 WI 95
15136-1 / 2001 / Progressing cavity pump systems for artificial lift -- Part 1: Pumps / API 11D2 (prop’d) | CEN/TC 12 WI 80 / DIS ballot circulated, terminates 2008-11-28. / Shauna Noonan
Shauna.G.Noonan
@conocophillips.com
15136-2 / 2006 / Progressing cavity pumps systems for artificial lift - Part 2: Surface drive systems / API 11D3 | CEN/TC 12 WI 109
16070 / 2005 / Downhole equipment - Lock mandrels and landing nipples / API 14L | CEN/TC 12 WI 162
17078-1 / 2004 / Drilling and production equipment - Part 1: Side-pocket mandrels / API Spec 11VI | CEN/TC 12 WI 117
17078-2 / 2007 / Drilling and production equipment – Part 2: Flow control devices for side-pocket mandrels / API Spec 11VI | CEN/TC 12 WI 118
17078-3 / NEW / Drilling and production equipment – Part 3: Latches and related tools for side-pocket mandrels / CEN/TC 12 119 / Document approved for publication 2009-03-25 / Wayne Mabry
17078-4 / NEW / Drilling and production equipment -Part 4: Practices for side-pocket mandrels and related equipment / DIS ballot circulated 2008-03-20, terminated 2008-08-22. FDIS in preparation. / Wayne Mabry
17824 / NEW / Downhole equipment - Sand control screens / DIS ballot circulated 2008-06-01, terminated 2008-10-30. Accepted for FDIS processing on 2009-02-23. Two week review on 2009-04-07 / George Gillespie
28781 / NEW / Downhole equipment - Subsurface tubing mounted formation barrier valves and related equipment / CD ballot circulated 2008-02-26, closed 2008-05-26. Accepted for DIS processing on 2009-03-13. DIS Ballot issued on 2009-03-26 / David McCalvin
Workgroup 6 – Subsea Equipment Jen-Henrik Neuenkirchen, convenor ()
13628-1 / 2005 / Design and operation of subsea production systems - Part 1: General requirements and recommendations / API Spec 17A | CEN/TC 12 WI 141 / NWI (N421) for document revisions submitted 2009-03-27 and closes 2009-06-27 / André Maerli13628-1
AMENDMENT 1 / Design and operation of subsea production systems - Part 1: General requirements and recommendations- Amendment 1 / API Spec 17A | CEN/TC 12 WI 141 / For Revision to Clause 6 - Draft Amendment 1 sent to ballot 2007-10-28, terminated 2008-04-01. Drafting of ISO 21457 has rendered much of this amendment possibly obsolete. Once 21457 passed the DIS phase, this document will be re-visited. New DIS Ballot closed 2009-04-01 / André Maerli
13628-1
AMENDMENT 2 / Design and operation of subsea production systems - Part 1: General requirements and recommendations- Amendment 2 / API Spec 17A | CEN/TC 12 WI 141 / Revision to Annex L - Draft Amendment 2 sent to ballot 2007-10-28. terminated 2008-04-01. Drafting of ISO 21457 may impact this document. Assessment currently underway. New DIS Ballot closed 2009-04-01 / André Maerli
13628-2 / 2006 / Design and operation of subsea production systems - Part 2: Flexible pipe systems for subsea and marine applications / API Spec 17J | CEN/TC 12 WI 159
13628-2
TECH CORR 1 / 2009 / Design and operation of subsea production systems - Part 2: Flexible pipe systems for subsea and marine applications
13628-3 / 2000 / Design and operation of subsea production systems - Part 3: Through flow line (TFL) systems / API RP 17C | CEN/TC 12 WI 40
13628-4 / 1999 / Design and operation of subsea production systems - Part 4: subsea wellhead and tree equipment / API Spec 17D | CEN/TC 12 WI 160 / 2nd DIS Ballot Closed 2009-02-06. In comment resolution phase now. / G. Ross Frazer
13628-5 / 2002 / Design and operation of subsea production systems - Part 5: Subsea Umbilicals / API 17E / Approved for FDIS on 2008-11-28. FDIS in preparation. / Ron Dee
13628-6 / 2006 / Design and operation of subsea production systems - Part 6: Subsea production control systems / API Spec 17F | CEN/TC 12 WI 145 / NWI (N422) submitted for revision of document on 2009-03-27 and closes on 2009-06-27 / Roald Loug Hansen
13628-7 / 2005 / Design and operation of subsea production systems - Part 7: Workover/Completion riser systems / API RP 17G / NWI (N416) Submitted for next revision closed 2009-04-29. Will consider intervention control issues in next revision.
NWI for Tech Corrigendum to be issued / Anthony Muff
13628-8 / 2002 / Design and operation of subsea production systems - Part 8: Remotely Operated Vehicles (ROV) interfaces on subsea production systems / API RP 17H / NOTE:
DOCUMENT TO BE WITHDRAWN WHEN 13628-13 IS PUBLISHED
13628-8
TECH CORR 1 / 2005 / Design and operation of subsea production systems - Part 8: Remotely Operated Vehicles (ROV) interfaces on subsea production systems / API RP 17H / NOTE:
DOCUMENT TO BE WITHDRAWN WHEN 13628-13 IS PUBLISHED
13628-9 / 2000 / Design and operation of subsea production systems - Part 9: Remotely operated tool (ROT) intervention system / API RP 17M, NORSOK U-CR-007 / NOTE:
DOCUMENT TO BE WITHDRAWN WHEN 13628-13 IS PUBLISHED
13628-10 / 2005 / Design and operation of subsea production systems - Part 10: Specification for bonded flexible pipe / API 17K | CEN/TC 12 WI 165
13628-11 / 2007 / Design and operation of subsea production systems - Part 11: Flexible pipe systems for subsea and marine riser applications / API RP 17B | CEN/TC 12 WI 166 (VA)
13628-11
TECH CORR 1 / 2008 / Design and operation of subsea production systems - Part 11: Flexible pipe systems for subsea and marine riser applications
13628-12 / NEW / Design and operation of subsea production systems - Part 12: Dynamic production risers / API RP 2RD, 1st, June 1998 / Related to 13625 (WG2) above. New Project Approved 2007-09-12 / Paul Stanton
13628-13 / NEW / Design and operation of subsea production systems - Part 13: Remotely operated tools and interfaces on subsea production systems / API RP 17H (Prop’s) Note: 17H number to be retained for this doc / Will replace 13628-8 and 13628-9 when published New Project Approved 2007-05-10 / Eric Luzi
13628-15 / NEW / Design and operation or subsea production systems - Part 15: Subsea structures and manifolds / API RP 17P (Prop’d) / API Contract (2006-102560) source of work. Document completed. DIS Document Vote (N415) closed on 2009-04-14 / Olla Melland
Ross Frazer
13628-16 / NEW / Design and operation of subsea production systems – Part 16: Specification for flexible pipe ancillary equipment / API Spec 17L1 (Prop’d) / CD Vote (N419) closed 2009-01-09 / Krassimir Doynov
13628-17 / NEW / Design and operation of subsea production systems - Part 17: Recommended practice for flexible pipe ancillary equipment / API RP 17L2 (Prop’d) / CD Vote (N420) closed 2009-01-09 / Krassimir Doynov
1
ISO TC67/SC4 Report