ALLEN COUNTY
CONTRACT PROJECTS TO BE UNDER CONSTRUCTION
OR SOLD DURING CALENDAR YEAR 2010
STATE PROJECTSRef. No. / PROJECT / Sale Date / Approximate
Duration / Estimated Cost
County - Route - Section / Description / Location / Length
1 / ALL/HAR SR 196/385 0.00/0.00 / Pavement preventative maint project (smooth seal) on ALL SR 196 and on HAR SR 385 / On SR 196 from the Auglaize CL to the SR 117 jct; on SR 385 from the Auglaize CL to the SR 117 jct. / 5.39
miles / 11/4/09 / Spring/Summer
2010 / $468,586
2 / ALL/HAN SR 103 0.00/0.00 / 2-lane resurfacing on SR 103 in Allen & Hancock Counties; excluding portion from Allen CL to IR 75, which was paved in 2005 / Begin at the IR 75 jct. and end at the SR 698 / 9.31
miles / 2/4/10 / Spring/Summer
2010 / $880,629
3 / ALL/HAN IR 75 18.28/0.00 / Minor rehabilitation including grinding, paving, and some joint repair / From the Little Riley Creek bridge north of Beaverdam to just south of SR 235 / 8.11
miles / 6/2/10 / Summer 2010 / $3,391,555
4 / ALL/HAN IR 75 Cable Rail / Install cable rail system in grass median area / ALL/AUG County Line to McClain Rd overpass; SR 81 interchange to HAN TR 33 overpass / 17.38
miles / 6/2/10 / Summer 2010 / $1,749,839
5 / PUT/ALL SR 66/190/694 3.45/0.00 / 2-lane resurfacing on SR 66, SR 190, and SR 694. Mill 1.5” and pave 1.5” with asphalt concrete / SR 66: US 224 to Paulding CL; SR 190: SR 66 in Delphos to SCL of Ft Jennings; SR 694: SR 114 to SR 115 / 13.77
Miles / 7/15/10 / Summer/Fall
2010 / $1,442,288
STATE TOTALS / $7,932,897
4
ALLEN COUNTY
CONTRACT PROJECTS TO BE UNDER CONSTRUCTION
OR SOLD DURING CALENDAR YEAR 2010
LOCAL GOVERNMENT PROJECTSRef. No. / PROJECT / Sale Date / Approximate
Duration / Estimated Cost
County - Route - Section / Description / Location / Length
CITY OF LIMA
6 / ALL VINE STREET RRGS / Construct railroad underpass structure under the CSX/NS Rail lines on Vine St located next to the proposed Global Energy Development / Central Avenue to Main Street / ----- / 4/19/10 / Fall 2011 / $15,213,478.4
7 / ALL UNIVERSITY BLVD / Add 5’ sidewalk on the south side of University Blvd from Cable Road to Columbia Drive; add 5’ sidewalk on both sides of Columbia Drive from Univ Blvd to Allentown Road / Cable Road to Allentown Road / ----- / 4/15/10 / Summer
2010 / $159,448.40
8 / ALL LIMA DOWNTOWN / Replacement of selected curb, sidewalk and brick pavers; replacement of trees, new signs and bollards / Main from Elm to North St, Elizabeth from Spring to North St, Market from West to Union, and High from West to Union / ----- / 5/3/10 / Summer
2010 / $1,895,583.99
LOCAL GOVERNMENT TOTAL / $17,268,511
TOTAL ESTIMATED COST FOR ALLEN COUNTY $25,201,408
6