Date:

ADS, Inc.

Attention:

Lynnhaven Parkway, Suite 400

Virginia Beach, VA 23452

Subject: Quote for Project Number SSC – (SSC – AC# – AC Quote #)

Government Customer and Contact Information:

Description of Product per “Description Cheat Sheet”:

Quantity:

If one of the four “STANDARD DESCRIPTIONS” per the Description Cheat Sheet do not apply, what is the customer storing? (Highlight all applicable items on the FES Scope Checklist attached)

*Government customer shall provide (List items such as 1st floor cleared room, dumpsters, forklifts, etc.):

Estimated total lead times: to assist ADS with determining Delivery Due By date for their purchase order

• For delivery & installation of Spacesaver products: Up 12 weeks from receipt of PO unless otherwise stated.

• OCONUS international shipments and installation of Spacesaver products: Up 20 weeks from receipt of PO unless otherwise stated.

• Non-Spacesaver products: [AC must designate lead time]

Total investment for equipment, delivery, and turnkey installation:

Product Price:

Freight/Delivery Price:

Installation Price:

TOTAL PRICE:

PRICING IS VALID FOR 60 DAYS. Shipment liability is FOB Destination.

All pricing and drawings are the property of Spacesaver Corporation and should not be shared with anyone outside the Government without written consent from Spacesaver.

Orders should be made out to:

Spacesaver Storage Systems, Inc.

c/o Area Contractor:

1450 Janesville Avenue

Fort Atkinson, WI 53538

Orders should be emailed to both and the following AC email address:

Payment Terms: Net 30. If installation is required for this project, Area Contractor shall immediately inform Spacesaver at and ADS at when installation has been completed, and Spacesaver will forward the installation payment to the Area Contractor.

Thank you so much for your consideration and the opportunity to team with you on this project!

If you have questions, please feel free to contact me directly at:

Thank you for your business! Sales Rep Name & Signature:

Attachments (List documents such as Project 3D Drawing, Warranty Information, etc.):

FES SCOPE CHECKLIST

01) Respiratory Protection
- Gas Masks
- SCBA's
- Disposable respirators
02) First Response Personal Protection Equipment
03) Safety Gloves
04) Air Compressors
05) Generators
06) Uniforms
07) Fire Extinguishers
08) Goggles
09) Gloves
10) Helmets
11) Hoods
12) Air/Hydraulic Hose Fittings
13) Station & Training Wear & Equipment
14) Calibration Equipment for First Responder Gear
15) Deployment cases (Pelican)
16) Flight gear
17) O2 cylinders
18) Boots
19) Communications Equipment
20) Ladders
21) HAZMAT Protective Clothing

22) Aviation Life Support Equipment (ALSE)

- Helmet, Personal Flotation Vests, Personal Locator Beacon, Strobe Light, Sginal Mirror,

Knife, Anti-Exposire Suit, etc…