AIR BARRIER & INSULATION CHECKLIST- FBC-EC R402.4.1.1 Installation.

Follow this Checklist for a Successful Energy Compliance Inspection & Blower Door Test

S – Scope of Inspection N/A– Not Applicable P- Pass F – Fail (re-check)

S /

N/A

/ COMPONENT / # / P / F /

CRITERIA

 /  / INSULATION / 1 /  /  / Insulation in substantial contact with air barrier.
2 /  /  / Insulation in continuous alignment with air barrier.
3 /  /  / Exterior thermal envelope contains continuous air barrier.
 /  / AIR-BARRIER / 4 /  /  / Breaks or joints in the air barrier are filled or repaired.
5 /  /  / Air-permeable insulation is NOT used as a sealing material.
6 /  /  / Air-permeable insulation is inside of an air barrier.
7 /  /  / A continuous air barrier installed in the building envelope.
 /  / CEILING / ATTIC / 8 /  /  / Air-barrier at ceiling/soffits is aligned with insulation.
9 /  /  / Gaps are sealed in the ceiling/soffits air barrier.
10 /  /  / Attic access / doors are sealed and insulated.
 /  / WALLS / 11 /  /  / Corners are insulated.
12 /  /  / Headers are insulated or solid.
13 /  /  / Sill/sole plate is sealed at foundation junction.
14 /  /  / Knee walls are sealed
15 /  /  / Junction of the top plate & top of exterior walls is sealed.
 /  / WINDOWS / DOORS / 16 /  /  / Space between door/window jambs & framing are sealed.
 /  / RIM JOIST / 17 /  /  / Rim joist are insulated.
18 /  /  / Air-barrier is installed and sealed at rim joist.
 /  / FLOORS
Above-garage &
Cantilevered Floors / 19 /  /  / Insulation is in contact with underside of subfloor decking.
20 /  /  / Insulation is permanently installed and supported.
21 /  /  / Air barrier is provided at any exposed edge of insulation.
 /  / UN-VENTED
CRAWLSPACE / 22 /  /  / Insulation is permanently attached to foundation walls.
23 /  /  / Exposed earth is covered with Class I vapor retarder.
24 /  /  / All joints in vapor retarder are overlapped and taped.
25 /  /  / Vapor retarder extends 6” up foundation wall.
 /  / PENETRATIONS
Shafts / Utilities / 26 /  /  / Duct Shafts to unconditioned space or exterior are sealed.
27 /  /  / Knee walls at unconditioned space are sealed.
28 /  /  / Flue shafts to unconditioned space or exterior are sealed.
29 /  /  / Utility penetrations to uncond. space or exterior sealed.
S – Scope of Inspection N/A – Not Applicable P- Pass F – Fail (re-check)
S /

N/A

/ COMPONENT / # / P / F /

CRITERIA

 /  / NARROW CAVITIES / 30 /  /  / Batts are cut to fit narrow cavities. (not compressed & no gaps)
31 /  /  / Narrow cavities are filled with spray / blown insulation.
 /  / GARAGE/SEPARATION / 32 /  /  / Air sealing is provided at garage & conditioned spaces.
 /  / RECESSED LIGHTING
Installed into
Unconditioned Space / 33 /  /  / Recessed lighting is air-tight.
34 /  /  / Recessed lighting is IC rated.
35 /  /  / Recessed lighting is sealed at drywall.
 /  / PLUMBING / WIRING / 36 /  /  / Insulation is between outside and pipes.
37 /  /  / Batt insulation is cut to fit around wiring / boxes.
38 /  /  / Batt insulation is cut to fit around plumbing.
39 /  /  / Sprayed / blown insulation extends behind piping / wiring.
 /  / TUB/SHOWER
Exterior Walls / 40 /  /  / Concealed spaces at tub/shower are insulated at exterior.
41 /  /  / Air-barrier installed & sealed at exterior wall.
 /  / ELEC/PHONE BOXES
Exterior Walls / 42 /  /  / Air-barrier extends behind boxes.
43 /  /  / Air sealed-type boxes are used.
 /  / COMMON WALLS / 44 /  /  / Air-barrier is installed in common walls / dwelling units.
 /  / HVAC
REGISTER BOOTS / 45 /  /  / Boots penetrating building envelope sealed to sub-floor.
46 /  /  / Boots penetrating building envelope are sealed to drywall.
 /  / FIREPLACE / 47 /  /  / Fireplace walls include air-barrier & gasketed doors.
 /  / SKYLIGHTS / 48 /  /  / Space between skylight jambs & framing are sealed.
# /

Comments

Checked By: Date: / Re-Check By: Date: