WIMES 8.02 (B)Page 1

APPENDIX d1 – equipment DATA SHEETS

PROJECT TITLE (P) / DOCUMENT REFERENCE (P)
PROJECT REFERENCE NUMBER (P) / REVISION (P)
PROJECT LOCATION (P) / DATE (P)
EQUIPMENT SUPPLIER (P/S) / REFERENCE DRGS (P)
(included/not included)

ISSUE 3OCTOBER 2011

WIMES 8.02 (B)Page 1

* - indicates Purchaser’s default requirement

2.0 GENERAL

2.1 General

1 / Dosing Application () (P)
Water disinfection
Waste water odour control

3.0 OPERATING ENVIRONMENT AND SITE DETAILS

1 / Operating Environment (P)
Site Location ()
Inland
Coastal
Equipment Location ()
Indoors (unheated)
Indoors (heated)
Outdoors
Ambient AirTemperatureRange ()
Minimum
Maximum
Hazardous Area Requirements
Hazardous area (Y/N)
Zone
Gas Group
Temperature Class
EMC Environment ()
Class A - Domestic, commercial and light industrial
Class B - Industrial
2 / Special Environmental Hazards (P)

4.0 PROCESS FLUID DETAILS,SODIUM HYPOCHLORITE PROPERTIES AND DOSING CONDITIONS

4.1 Process Fluid Type and Properties

1 / Type (P)
1 / Properties (P) / Min / Av. / Max
TSS (mg/l)
TDS (mg/l)
pH
Alkalinity
(mg CaCO3/l)
Colour (°H)
Turbidity (FTU)
Conductivity (S/cm)

4.2 Sodium Hypochlorite Supplier and Properties

1 / Sodium Hypochlorite Supplier (P)
2 / Sodium Hypochlorite Properties (P)
Concentration (%)
Freezing temperature (oC)
Specific gravity (g/cc)
Viscosity (cP)

4.3 Dosing Conditions (Process Fluid Flow Rate and Pressure)

1 / Process Fluid Flow Rates (P) / QMin
(l/s) / QMean
(l/s) / Qmax
(l/s)
Dosing Point 1
Dosing Point 2
Dosing Point 3
Dosing Point 4
1 / Max. Rate of Change of Flow (l/s2) (P)
Dosing Point 1
Dosing Point 2
Dosing Point 3
Dosing Point 4
2 / Process Fluid Pressures (P) / PMin
(bar) / PMean
(bar) / Pmax
(bar)
Dosing Point 1
Dosing Point 2
Dosing Point 3
Dosing Point 4

5.0 PERFORMANCE SPECIFICATION

5.1 Asset Life

1 / Asset Life (years) (P)

5.2 Process Fluid Dosing Rate

1 / Required ProcessFluidDosingRange (mg.Chlorine/l) (P)
2 / Process Delay and Rise Time (P)
3 / Contact Time Requirements (P)

6.0 DESIGN SPECIFICATION

6.1.1 General

1 / Flushing Requirements/Provisions (P/S)

6.1.2 Pipework Systems (i.e. Pipes Valves, Accessories and Instrumentation)

6.1.2.1 General (General and Installation)

3 / Venting Facilities Reqd. /Provided (Y/N) (P/S)
3 / Venting Requirements/Provisions (P/S)

6.1.3 Bunding and Secondary Containment

6.1.3.1 Bunding

1 / Bund Material and Type of Bund Construction (P/S)
2 / Bund Capacity (l) (P/S)

6.1.3.2 Secondary Containment

1 / Details of Secondary Containment Systems Required/Provided (P/S)

6.1.4 Weights and Lifting Arrangements

1 / Weights (S)
Component (specify) / Weight (kg)
1 / Heaviest maintenance lift (S)
1 / Heaviest erection lift (S)

6.1.7 Drive Systems

Refer to Appendix D2.

6.1.10.1 Emergency Washing Facilities

1 / Details of Emergency Washing Facilities Required/Provided (P/S)

6.1.11 O & M Manuals

1 / Type of O & M Manuals Required/ Provided (P/S)

ISSUE 3OCTOBER 2011

WIMES 8.02 (B)Page 1

6.2 Delivery Section

1 / Method of Delivering Sodium Hypochlorite to Site (e.g. Bulk Tanker, Carboys etc.) (P/S)

6.2.1 Bulk Tanker/IBC Deliveries

6.2.1.1 Filling Point

1 / Filling Point Details (P/S)
2 / Filling Point Connection Details (i.e. Size/Type of Fitting, Flange Details, etc.) (P/S)
3 / Details of Interlocking Facilities Required/Provided (P/S)

6.2.1.2 Filling Line

1 / Filling Line Size and Materials (P/S)
2 / Filling Line Inlet Valve Details (P/S)

6.2.1.3 Filling Panel

1 / Filling Panel Details (P/S)

6.2.1.4 Containment System

1 / Containment System Details (P/S)

6.2.2 Carboy Deliveries

6.2.2.1 Unloading and Transfer Facilities

1 / Type of Facilities Required/Provided (P/S)

6.2.2.2 Carboy Pump and Filling Line

1 / Carboy Pump and Filling Line Details (P/S)

6.2.2.3 Containment System

1 / Containment System Details (P/S)

6.3 Bulk Storage Section (BSS)

6.3.1 General

2 / Number of BSTs (2*) (P/S)
3 / Location of Bulk Storage Section (Indoors*) (P/S)
3 / Building/Enclosure Details (If Required/Provided) (P/S)

6.3.2 BST Design and Construction

1 / BST Details (i.e. Shape, Dimensions, Maximum Capacity, Materials, Design Standards, etc.) (P/S)

6.3.3 BST Connections and Associated Pipework

1/2 / BST Connections and Associated Pipework (i.e. Flange Details, PipeworkNB, Pressure Rating, Materials, Valve Type/Materials etc.) (P/S)
Filling Line Connection
Outlet Connection
Overflow Connection
Vent Connection
Drain Connection

6.3.4 BST Instrumentation

1 / BST Contents/Level Monitoring Requirements (i.e. Types of Probes/Sensors, Location of Probes/Sensors, etc.) (P/S)

6.3.5 BSSTemperature Control

1 / BSS Insulation and/or Refrigeration/Air Conditioning System Details (P/S)

6.3.6 BSS Access Requirements

1 / BST Manway and/or Inspection Hatch/Cover Requirements/Provisions (i.e. Size, Location etc.) (P/S)
2 / BSS Access Requirements/Provisions (i.e. Details of Ladders, Stairways, Platforms, Guard-Rails, etc.) (P/S)

6.4 Batching Section (If Required/Provided)

6.4.1 General

1 / Batching Section Required/Provided (Y/N) (P/S)
3 / Building/Enclosure Details (P/S)

6.4.2 Transfer of Sodium Hypochlorite from the BSS to the Batching Section

1 / Method of Liquid Transfer (P/S)
2 / Transfer System Details (Pumped Systems) (P/S)

6.4.3 Batching System

1 / Type of Batching System Required/Provided (P/S)
2/3 / Range of Concentrations Required and Batching System Accuracy/Repeatability (%) (P/S)
4 / Batching System Details (i.e. Tank Materials/Specifications, Pipework/Connections, Stirrer, Instrumentation etc.) (P/S)

6.4.4 Make-Up Water System

1 / Make-Up Water System Details (P/S)

6.4.5 Water Softening System (If Required/Provided)

1 / Type and Properties of the Make-Up Water (P)
2 / Make-Up Water Softening System Required/Provided (Y/N) (P/S)
2 / Make-Up Water Softening System Details (P/S)

6.4.6 Access Requirements

1 / Batching Section Access Requirements/Provisions (i.e. Details of Ladders, Stairways, Platforms, Guard-Rails, etc.) (P/S)

6.5 Dosing Section

6.5.1 General

2 / Building/Enclosure Details (P/S)

6.5.2 Dosing Pumps

1 / Dosing Pump Details (i.e. Number of Pumps, Pump Type/Materials, Pump Manufacturer and Model, Pump Configuration/Arrangement, etc.) (P/S)
2 / Relevant Pump Performance Information (e.g. Maximum Discharge Pressure and Flow Rate, Self-Priming Height, Accuracy, Turn Down Ratio, etc.) (S)

6.5.3 Dosing Pump Inlet and Outlet Pipework and Accessories

1 / Inlet Piping Details(i.e. NB, Pressure Rating, Materials, Type of Construction, etc.) (P/S)
2 / Inlet Pipework Valves, Accessories and Instrumentation(P/S)
3 / Outlet Piping Details(i.e. NB, Pressure Rating, Materials, Type of Construction etc.) (P/S)
4 / Outlet Pipework Valves, Accessories and Instrumentation(P/S)
5 / Pipework Insulation and/or Refrigeration/Air Conditioning System Details (P/S)

6.6 Carrier Water System (If Required/Provided)

1 / Carrier Water System Required/Provided (Y/N) (P/S)
1 / Sodium Hypochlorite Concentration after Dilution (%) (P/S)
2 / Carrier Water Requirements/Provisions (i.e. Type/Source, Pressure, Flow Rate, etc.) (P/S)
3 / Type of Carrier Water System Required/Provided (P/S)
3 / Carrier Water System Details (P/S)
4 / Carrier Water Softening System Required/Provided (Y/N) (P/S)
4 / Carrier Water Softening System Details (P/S)
5 / Static Mixer Required/Provided (Y/N) (P/S)
5 / Static Mixer Details (P/S)

6.7 Sodium Hypochlorite Dosing Arrangements

1 / Process Pipework, Channel, Tank, etc. Details (P/S)
2 / WIF, Sparge System, etc. Details (P/S)

6.8 Mixing Facilities (Sodium Hypochlorite with Process Fluid)

1 / Mixing Facilities (e.g. Static Mixer Details etc.) (P/S)

6.9 Process Fluid Sampling System (If Required/Provided)

1 / Sampling System Required/Provided (Y/N) (P/S)
2 / Sampling System Details (P/S)

6.10 Control System

6.10.2 Dosing Control Panel (DCP) (If Required/Provided)

1 / DCP Required/Provided (Y/N) (P/S)
1 / DCP Details (P/S)

6.10.3 Process Control and Monitoring Instrument Requirements/Provisions

1 / Process Control and Monitoring Instrument Requirements/Provisions (P/S)

6.10.4 Control Philosophy

1 / Reference for Purchaser’s Particular Specification (P)

ISSUE 3OCTOBER 2011

WIMES 8.02 (B)Page 1

APPENDIX d2 – DRIVE SYSTEM DATA SHEET

(TO BE COMPLETED FOR EACH DRIVE SYSTEM > 1.1 kW)

ISSUE 3OCTOBER 2011

WIMES 8.02 (B)Page 1

Drive No.:

1 / Driven Equipment (P/S)
2 / Method of Power Transmission from Drive System to Driven Equipment () (P/S)
Close coupled
Chain
Belt
Other (specify)
3 / Method of Mechanical Overload Protection for Drive System () (P/S)
Current monitoring
Torque limiting coupling
Other (specify)
4 / Gearbox Specification (S)
Type and Number of Stages
Manufacturer
Service factor
Final drive ratio

Drive No.:

1 / Driven Equipment (P/S)
2 / Method of Power Transmission from Drive System to Driven Equipment () (P/S)
Close coupled
Chain
Belt
Other (specify)
3 / Method of Mechanical Overload Protection for Drive System () (P/S)
Current monitoring
Torque limiting coupling
Other (specify)
4 / Gearbox Specification (S)
Type and Number of Stages
Manufacturer
Service factor
Final drive ratio

Drive No.:

1 / Driven Equipment (P/S)
2 / Method of Power Transmission from Drive System to Driven Equipment () (P/S)
Close coupled
Chain
Belt
Other (specify)
3 / Method of Mechanical Overload Protection for Drive System () (P/S)
Current monitoring
Torque limiting coupling
Other (specify)
4 / Gearbox Specification (S)
Type and Number of Stages
Manufacturer
Service factor
Final drive ratio

Drive No.:

1 / Driven Equipment (P/S)
2 / Method of Power Transmission from Drive System to Driven Equipment () (P/S)
Close coupled
Chain
Belt
Other (specify)
3 / Method of Mechanical Overload Protection for Drive System () (P/S)
Current monitoring
Torque limiting coupling
Other (specify)
4 / Gearbox Specification (S)
Type and Number of Stages
Manufacturer
Service factor
Final drive ratio

ISSUE 3OCTOBER 2011

WIMES 8.02 (B)Page 1

APPENDIX e – SUPPLIERS SUPPLEMENTARY DATA SHEET INFORMATION

Clause / Supplementary Information

ISSUE 3OCTOBER 2011