Upgradation of Infrastructural Facilities in the Existing Polytechnics

Upgradation of Infrastructural Facilities in the Existing Polytechnics

PROPOSAL FOR

UPGRADATION OF INFRASTRUCTURAL FACILITIES IN THE EXISTING POLYTECHNICS

GOVERNMENT POLYTECHNIC, IMMADIHALLI, BANGALORE-560066

KARNATAKA STATE

Under the Scheme of Sub-Mission on Polytechnics under the Coordinated Action for Skill Development

Submitted to

GOVERNMENT OF INDIA

MINISTRY OF HUMAN RESOURCE DEVELOPMENT

[DEPARTMENT OF HIGHER EDUCATION]

SHASTRI BHAVAN

NEW DELHI

FORMAT FOR UPGRADATION OF INFRASTRUCTURAL FACILITIES IN THE EXISTING POLYTECHNICS – SUB-MISSION ON POLYTECHNICS UNDER THE COORDINATED ACTION FOR SKILL DEVELOPMENT.

PART 1 : BASIC INFORMATION ABOUT THE POLYTECHNIC

1 / a] / Name of Polytechnic / Government Polytechnic,
Immadihalli,
Bangalore-560066.
b] / Location [Road, Street Name, Locality, City, Pin Code] / Immadihalli,
Bangalore-560066.
c] / Year of Establishment / 2009-10
d] / Women/Co-educational / Co-Educational
e] / Government/Government Aided / GOVERNMENT
f] / Nature of Institution / Affiliated to Board Of Technical Education, Karnataka
2 / a] / Name of Principal/incharge / Sri D.V.Srinivasamurthy
b] / Office Address with Pin Code / Office of the Principal,
Government Polytechnic,
Immadihalli,
Bangalore-560066.
c] / Office Phone No. with STD Code / 080-28454040
d] / Residential Phone No. with STD Code / 080-23626895
e] / Telex/Fax No. on which message can be given / -
f] / E-mail address /
3 / a] / Name of Vice Principal/Deputy in-charge / Sri.SureshBabu.R
4 / a] / Name of Nearest Railway Station / White Field Railway Station
5 / a] / Name of Nearest Air Port / Bangalore International Airport

PART-II::- CURRENT STATUS AND ACADEMIC DIMENSIONS OF THE

POLYTECHNIC

1. Courses and sanctioned Intake in various programmes

Information to be filled in Table 1

2.Faculty Positions and Development Status

Information to be filled in Table 2 & 3

3.Books and Learning Resources Utilization Centre [LRUC]

Information to be filled in Table 4

Rational strengthening LRUCs

Information to be filled in Table 5

4.Existing Laboratories and Workshops

Information to be filled in Table 6

5.Rational for Proposed Modernization of Laboratories and

Workshops

Information to be filled in Table 7 & 8

6.New Courses/Programmes to be introduced in this Scheme [If

any]. Details thereof and estimates

-No-

7.Estimated Cost for Upgradation of Infrastructural facilities

Information to be filled in Table 9

TABLE-1

COURSES AND SANCTIONED INTAKE IN VARIOUS PROGRAMMES

Sl.
No. / Name of the Course / Year of Starting / Diploma/Post Diploma / Duration / Semester/
Annual / Sanctioned student intake / Actual enrolment all years [1st +2nd +3rd year] upto 2010-11 / Total
Male / Female
01 / Civil Engg. / 2009-10 / Diploma / 03 Years / Semester / 60 / 50+11 / 03+0 / 64
02 / Mechanical Engg. / 2009-10 / Diploma / 03 Years / Semester / 60 / 59+22 / 1+0 / 82
03 / Electronics & Communication Engg. / 2009-10 / Diploma / 03 Years / Semester / 60 / 45+13 / 15+4 / 77
04 / Computer Sc. Engg. / 2009-10 / Diploma / 03 Years / Semester / 60 / 38+5 / 15+5 / 63

* The Total enrolment of all course for entire duration to be given

TABLE-2

CURRENT FACULTY STATUS

Category / Total Posts Sanctioned / Post Filled
Regular / Adhoc / Central / Dual
Charge / Total / Grand Total / % filled
M / F / M / F / M / F / M / F / M / F
Principal / 01 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0
Lecturers / 24 / 5 / 3 / 5 / 6 / 0 / 0 / 0 / 0 / 0 / 0 / 19 / 79%
Instructors including System Analyst / 04 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0
Asst. Instructor / 05 / 1 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 1 / 0 / 1 / 20%
Mechanics / 06 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0
Helpers / 08 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0

TABLE-3

CURRENT SUPPORTING STAFF STATUS

Category / Total Posts Sanctioned / Post Filled
Regular / Adhoc / Central / Dual
Charge / Total / Grand Total / % filled
M / F / M / F / M / F / M / F / M / F
Registrar / 01 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0
Office Suptds. / 02 / 0 / 0 / 1 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 1 / 50%
F.D.A / 04 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0
S.D.A / 04 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0
Typist / 01 / 0 / 0 / 0 / 1 / 0 / 0 / 0 / 0 / 0 / 0 / 1 / 100%
Office Attenders / 01 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0
Group ‘D” / 08 / 0 / 1 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 0 / 1 / 13%

TABLE-4

BOOKS AND LEARNING RESOURCES AVAILABLE CURRENT STATUS [NUMBER]

Sl.No. / Type of LRs / Total
Numbers / Amount
[In Rupees]
1 / Text Books / 400 / 80,000/-

TABLE-5

BOOKS AND LEARNING RESOURCES PROPOSED TO BE PROCURED

Sl.
No. / Type of LRs / Total Quantity Required / Total Cost
[Rs. In Million] / Procurement schedule with Approximate cost [Rupees in Lakh] during 11th Plan
Up to
31/03/2010 / Year
2010-11 / Year
2011-12
1 / Text Books / 4000 / 1.2 / - / 6 Lakhs / 6 lakhs
2 / Educational CD’s / 200 / 0.1 / - / 0.5 Lakhs / 0.5 Lakhs
3 / Educational Models / 200 / 1.0 / - / 5 Lakhs / 5 Lakhs
4 / Educational Charts / 200 / 0.2 / - / 1 Lakh / 1 Lakh
5 / Technical Magazine / 100 / 0.1 / - / 0.5 Lakh / 0.5 Lakh
6 / E – library(Desktop PC’s /Printers /Modem/Internet facility / - / 1.5 / - / 7.5 Lakh / 7.5 lakh
7 / Teaching Aid( LCD Projectors /OHP) / 12 / 1.5 / - / 7.5 Lakh / 7.5 Lakh

TABLE-6

LABORATORIES AND EQUIPMENT AVAILABLE

Sl. No. / Laboratory/Workshop / List of equipment each costing more than Rs.10,000/- / Availability of documents manuals / Condition
Yes / No / In use / Obsolete
1 / Survey Practice / i)Electronic Theodolite 2 No’s / Yes / Yes
2 / MT lab / Nil / Yes / Yes
3 / Hydraulics Environmental and Plumbing Lab / Nil / Yes / Yes
4 / Civil Drawing using Cad / 6 Computers / Yes / Yes

i)DEPARTMENT OF CIVIL ENGINEERING

ii)DEPARTMENT OF MECHANICAL ENGINEERING

S.No / Laboratory/ Workshop / List of equipment each costing more than Rs 10,000/- / Availability of documents/ manuals / Condition
Yes / NO / In use / Obsolete
1 / Carpentry / Nil / Yes / -- / -- / --
2 / Fitting / Nil / Yes / -- / -- / --
3 / Basic computer skills / computers / yes

iii)DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING

S.No. / Laboratory/Workshop / List of equipment each costing more than Rs. 10,000/- / Quantity available / Availability of documents/Manuals / Condition
Yes / No / In Use / Obsolete
1 / Digital Lab / Handheld Digital IC Tester
Model: HDIT20 / 01 / YES / YES
LCR Meter / 01 / YES / YES
8-channel Time division multiplexing and de-multiplexing trainer with power supply / 01 / YES / YES
Amplitude Shift keying modulation and demodulation trainer kit with power supply / 01 / YES / YES
Phase shift keying modulation and demodulation trainer kit with power supply / 01 / YES / YES
Frequency shift keying modulation and demodulation trainer kit with power supply / 01 / YES / YES
Frequency modulation and demodulation kit / 01 / YES / YES
30MHz dual trace Oscilloscope / 02 / YES / YES
1MHz signal generator with frequency counter model: 20140 / 02 / YES / YES
Digital IC Trainer / 04 / YES / YES
2 / Analog Lab / 1 MHz Function generator model FG1 MD / 02 / YES / YES
Dual DC Regulated power supply / 10 / YES / YES

iv)DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING

Sl. No. / Laboratory/Workshop / List of equipment each costing more than Rs.10,000/- / Availability of documents manuals / Condition
Yes / No / In use / Obsolete
1 / BCS Lab / 8 Computers
a)5KVA UPS
b)Dot Matrix Printer
c)Scanner / Yes / Yes
2 / Networking and Hardware Lab / 8 Computers
a)Laser Printer / Yes / Yes
3 / Linux Lab / 8 Computers
b)Dot matrix printer
c)Scanner / Yes / Yes

TABLE-7

NAMES OF LABORATORIES AND WORKSHOPS

i)DEPARTMENT OF CIVIL ENGINEERING

Name of Existing / Additional requirement for current and new courses
Laboratories / Workshops / Laboratories / Workshops
Basic Computer Skills / Plumbing Practice
Surveying Practice / Construction work shop
Auto Cad
Material and Soil Testing
Hydraulics
Environmental Engg

ii)DEPARTMENT OF MECHANICAL ENGINEERING

Name of Existing / Additional requirement for current and new courses
Laboratories / Workshops / Laboratories / Workshops
Basic Computer Skills / Basic Work Shop Practice(carpentry,) / CNC
Basic Electrical and Electronics / Basic Work Shop Practice
( fitter,) / Mechatronics
Computer Aided Engg Graphics / Basic Work Shop Practice
( Forging )
Material Testing and Metrology / Basic Work Shop Practice
(Foundry)
Fluid Mechanics and Machines / Basic Work Shop Practice
(Sheet Metal)
Pneumatic / Basic Work Shop Practice
(Welding)
Parametric modeling / Machine Shop

(iii)DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING

Name of Existing / Additional requirement for current and new courses
Laboratories / Workshops / Laboratories / Workshops
Basic computer skill / PC hardware and networks lab
Basic electrical and electronics lab / Digital Communication lab
Digital electronics lab / Power Electronics and PLC lab
Semiconductor devices lab
Analog Electronics lab
Analog communication lab
PCB design & Simulation lab
Microcontoler &application lab

v)DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING

Name of Existing / Additional requirement for current and new courses
Laboratories / Workshops / Laboratories / Workshops
Basic computer skill / JAVA Lab
Basic electrical and electronics lab / ASP.Net Lab
Programming in C
Digital Electronics
Advanced C
hardware and networks
Web Design Lab
D.B.M.S Lab
C++ Lab
Linux Lab
GUI Lab

vi)DEPARTMENT OF SCINCE AND HUMANITIES

Name of Existing / Additional requirement for current and new courses
Laboratories / Workshops / Laboratories / Workshops
Applied Science / Language Lab

TABLE-8

Tentative Equipment [+Furniture] Requirement

i)DEPARTMENT OF CIVIL ENGINEERING

Sl. No / Name of the Course / Year of Starting the course / Name of Laboratory / Equipment / Total Quantity / Total Cost (Rs. In million) / Procurement Schedule with Approx. Cost (Rs. In million)
Upto 31.03.2010 / Year 2010-11 / Year 2011-12
No. / Amt. / No. / Amt. / No. / Amt.
1 / Civil Engineering / 2009 / Survey Practice / i) Vernier Transit Theodolite / 2 / 0.018 / 2 / 0.018
2)Digital Planimeter / 2 / 0.1 / 2 / 0.1
3) Total Station / 2 / 1.6 / 1 / 0.8 / 1 / 0.8
4) Electronic Theodolite / 2 / 0.12 / 2 / 0.12
5)GPS / 1 / 0.08 / 1 / 0.08
2 / MT lab / 1) Compression Testing Machine / 1 / 0.1 / 1 / 0.1
2) Universal Testing Machine / 1 / 0.25 / 1 / 0.25
3)Mechanical Sieve Shaker / 1 / 0.01 / 1 / 0.01
4) Electrically Operated Sieve Shaker / 1 / 0.022 / 1 / 0.022
5) Electronic Weighing Balance / 1 / 0.01 / 1 / 0.01
7) Tables / 1 / 0.05 / 1 / 0.05
3 / Civil Engineering / 2009 / Hydraulics Environmental and Plumbing Lab / 1) Centrifugal Pump Test Rig / 6 / 0.06 / 6 / 0.06
2) Friction Through Pipes Apparatus / 1 / 0.09 / 1 / 0.09
3) V notch Apparatus / 1 / 0.09 / 1 / 0.09
4)pH Cum Conductivity meter / 1 / 0.09 / 1 / 0.09
5) Turbidity Meter / 1 / 0.025 / 1 / 0.025
1) Computers / 1 / 0.030 / 1 / 0.030
4 / Civil Drawing using Cad / 2)UPS / 24 / 0.96 / 12 / 0.48 / 12 / 0.48
4)Plotter / 1 / 0.1 / 1 / 0.1
5) Cieling Mounted LCD Projector / 1 / 0.07 / 1 / 0.07
6) Computer Tables
7) Computer Chairs / 1 / 0.1 / 1 / 0.1
24
24 / 0.24
0.12 / 24
24 / 0.24
0.12
Total(in Million) / 4.335 / 2.833 / 1.502

ii)DEPARTMENT OF MECHANICAL ENGINEERING

S.No / Name of the Course / Year of starting the Course / Name of the Laboratory / Name of Equipment / Total Quantity required / Total Cost (Rs ) / Procurement schedule with Approx. Cost ( Rupees)
Up to 1.03.2010 / Year 2010-11 / Year 2011-12
No / Amount / No / Amount / No / Amount
1 / Basic of computer Skills / Computer / 20 / 800000 / 10 / 400000 / 10 / 400000
2 / Computer Table / 20 / / 10 / 100000 / 10 / 100000
3 / Computer Chair / 20 / / 10 / 50000 / 10 / 50000
4 / 5KVA UPS / 1 / / 1 / 100000
5 / Computer Aided Engineering Graphics / Engineering Graphics Software / 1 / / 1 / 20000
6 / Mechanical Testing & Quality control Laboratory / flash and fire point Apparatus / 2 / / 1 / 15000 / 1 / 15000
7 / Universal Testing Machine / 1 / / 1 / 250000
8 / Izod and Charpy’s tester / 1 / / 1 / 50000
9 / BrinnelRockwell
Hardness Tester / 1 / / 1 / 45000
10 / Vicker hardness
Tester / 1 / / 1 / 45000
11 / Redwood viscometer / 1 / / 1 / 30000
12 / Thurston oil tester / 1 / / 1 / 25000
13 / Dye penetrant tester / 1 / / 1 / 50000
14 / Ultrasonic equipment. / 1 / / 1 / 45000
15 / Tables for kit / 8 / / 8 / 80000
16 / Basic workshop practice-II

(Foundry, Welding, sheet metal)

/ Heavy duty
Welding Transformer with Tools / 2 / / 1 / 25000 / 1 / 25000
17 / Gas welding tools & equipment / 2 / / 1 / 20000 / 1 / 20000
18 / MIG and TIG welding equipment / 2 / / 1 / 20000 / 1 / 20000
19 / Foundry Tools / 1set / / 1 / 20000
20 / Machine shop-I / Medium duty Lathe with assoserries / 20 / / 10 / 1500000 / 10 / 1500000
21 / Pillar Drilling
machine with assoserries / 2 / / 1 / 100000 / 1 / 100000
22 / Power hacksaw with assoserries / 1 / / 1 / 60000
23 / Bench grinder with assoserries / 2 / / 1 / 20000 / 1 / 20000
24 / Shaping machine
with assoserries / 2 / / 1 / 100000 / 1 / 100000
25 / slotting machine
with assoserries / 1 / / 1 / 50000
26 / Fluid Power LAB / Venturimeter Kit / 1 / / 1 / 25000
27 / Notches Kit / 1 / / 1 / 25000
28 / Pipe Friction Kit / 1 / / 1 / 30000
29 / Pelton Wheel Kit / 1 / / 1 / 80000
30 / Kaplan turbine Kit / 1 / / 1 / 90000
31 / Francis turbine Kit / 1 / / 1 / 90000
32 / Reciprocating pump Kit / 1 / / 1 / 30000
33 / Centrifugal Pump Kit / 1 / / 1 / 30000
34 / Jet Pump / 1 / / 1 / 20000
35 / Pneumatics Circuits / 1 / / 1 / 35000
36 / Machine Shop-II / Horizontal Milling Machine with assoserries / 2 / / 1 / 500000 / 1 / 500000
37 / CylindricalGrindingMachine with assoserries / 2 / / 1 / 400000 / 1 / 400000
38 / Surface Grinding Machine with assoserries / 2 / / 1 / 400000 / 1 / 400000
39 / Tool and Cutter
Grinding Machine
with assoserries / 2 / / 1 / 100000 / 1 / 100000
40 / Lubricating Oil / 200 ltr / / 100
ltr / 15000 / 100
ltr / 15000
41 / Cutters of all size / 1 set / / one set / 80000
42 / Vertical Milling Machine with assoserries / 2 / / 1 / 400000 / 1 / 400000
43 / Parametric Modeling Laboratory / Solid Edge Software / 1 / / 1 / 20000
44 / Printer / 2 / / 1 / 30000 / 1 / 30000
Total / 98,15,000 / 5620000 / 4195000

iii)DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING

Sl. No. / Name of the course / Year of starting the course / Name of Laboratory / Name of the equipment / Total Qty. required / Total Cost (Rs. In million) / Procurement Schedule with Approx. cost (Rs. In million)
Upto 31.03.2010 / Year 2010-11 / Year 2011-12
Nos. / Cost in Rs / Nos. / Cost in Rs
1 / Electronics &Communication / 2009-10 / Digital Comm. Lab / Sampling theorem and Aliasing effect kit / 10 / 0.13 / 05 / 0.065 / 05 / 0.065
Pulse Code modulation and demodulation kit / 10 / 0.14 / 05 / 0.07 / 05 / 0.07
Delta modulation and demodulation kit / 10 / 0.13 / 05 / 0.065 / 05 / 0.065
Adaptive delta modulation and demodulation kit / 10 / 0.15 / 05 / 0.075 / 05 / 0.075
DPSK modulation and demodulation kit / 10 / 0.15 / 05 / 0.075 / 05 / 0.075
Optical fiber 1omm.. Trainer kit / 03 / 0.24 / 02 / 0.16 / 01 / 0.08
Dual Channel CRO 25MHz / 10 / 0.25 / 05 / 0.125 / 05 / 0.125
Function generator 1MHz / 10 / 0.12 / 05 / 0.06 / 05 / 0.06
Digital IC trainer kit / 10 / 0.1 / 05 / 0.05 / 05 / 0.05
Table / 10 / 0.1 / 05 / 0.05 / 05 / 0.05
Chairs / 10 / 0.05 / 05 / 0.025 / 05 / 0.025
2 / Microcontroller Lab / Computer systems : Core 2 duo/dual core, 2 GB RAM, 320GB HDD / 10 / 0.4 / 05 / 0.2 / 05 / 0.2
Laser Printer / 02 / 0.06 / 01 / 0.03 / 01 / 0.03
Computer tables / 10 / 0.1 / 05 / 0.05 / 05 / 0.05
Chairs / 10 / 0.05 / 05 / 0.025 / 05 / 0.025
Sealing mounted LCD Projector / 01 / 0.1 / 01 / 0.1 / -- / ---
3 / PCB Simulation Lab / Computer systems : Core 2 duo/dual core, 1 GB RAM, 150 HDD / 20 / 0.8 / 10 / 0.4 / 10 / 0.4
Computer tables / 20 / 0.2 / 10 / 0.1 / 10 / 0.1
Chairs / 20 / 0.1 / 10 / 0.05 / 10 / 0.05
4 / BCS Lab / Computer systems : Core 2 duo/dual core, 1 GB RAM,
150 HDD / 20 / 0.8 / 10 / 0.4 / 10 / 0.4
Computer Table / 20 / 0.2 / 10 / 0.1 / 10 / 0.1
Chairs / 20 / 0.1 / 10 / 0.05 / 10 / 0.05
5 / Analog Electronics Lab / Dual Channel CRO 25 MHz / 20 / 0.5 / 10 / 0.25 / 10 / 0.25
Variable DC regulated power supply (dual) / 20 / 0.3 / 10 / 0.15 / 10 / 0.15
Function generator (0-10MHz) / 20 / 0.2 / 10 / 0.1 / 10 / 0.1
Signal generator (0-1 MHz) / 20 / 0.2 / 10 / 0.1 / 10 / 0.1
Linear /Analog Trainer kits with builtin Power supply and bread board / 20 / 0.2 / 10 / 0.1 / 10 / 0.1
Tables / 20 / 0.2 / 10 / 0.1 / 10 / 0.1
Chairs / 20 / 0.1 / 10 / 0.05 / 10 / 0.05
6 / BEEE Lab / LCR meter / 02 / 0.024 / 01 / 0.012 / 01 / 0.012
7 / Advanced Microprocessor Lab / Microprocessor kits with interfacing units / 10 / 0.1 / 5 / 0.05 / 5 / 0.05
Masm software / 10 / 0.2 / 5 / 0.1 / 5 / 0.1
Computer systems : Core 2 duo/dual core, 1 GB RAM, 150 HDD / 20 / 0.8 / 10 / 0.4 / 10 / 0.4
Computer Table / 20 / 0.2 / 10 / 0.1 / 10 / 0.1
Chairs / 20 / 0.1 / 10 / 0.05 / 10 / 0.05
8 / Power Electronics and PLC Lab / Dimmer stat / 10 / 0.15 / 5 / 0.075 / 5 / 0.075
PLC Trainer kits with interfacing modules / 16 / 0.2 / 8 / 0.1 / 8 / 0.1
Computer Table / 20 / 0.2 / 10 / 0.1 / 10 / 0.1
Chairs / 20 / 0.1 / 10 / 0.05 / 10 / 0.05
9 / Pc Hardware
& Networks
lab / Network accessories & Hardware Tools and Software / 10 / 0.3 / 5 / 0.15 / 5 / 0.15
Total / 8.544 / 4.362 / 4.182

iv)DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING

S.No / Name of the Course / Year of starting the Course / Name of the Laboratory / Name of Equipment / Total Quantity required / Total Cost (Rs in millions ) / Procurement schedule with Approx. Cost ( Rupees in Lakh )
Up to 31.03.2010 / Year 2010-11 / Year 2011-12
No / Amount / No / Amount in Rs. / No / Amount in Rs.
COMPUTER SCIENCE ( General ) / 2009-10
1 / Basic computer Skills lab / Computer / 10 / 400000=0.4 / 05 / 200000 / 05 / 200000
2 / Computer Table / 10 / =0.1 / 05 / 50000 / 05 / 50000
3 / Computer Chair / 10 / =0.05 / 05 / 25000 / 05 / 25000
4 / 5KVA UPS / 1 / =0.1 / 1 / 100000 / -- / ---
5 / Laser Printer / 1 / 13000=0.013 / 1 / 13000 / - / -
6 / Lcd Projector / 1 / 100000=0.1 / 1 / 100000 / - / -
7 / AC / 2 / 100000=0.1 / 1 / 50000 / 1 / 50000
8 / Almarah / 2 / 30000=0.03 / 1 / 15000 / 1 / 15000
9 / Linux lab / Computers / 10 / =0.4 / 05 / 200000 / 05 / 200000
10 / Computer table / 10 / =0.1 / 05 / 50000 / 05 / 50000
11 / Computer chair / 10 / =0.05 / 05 / 25000 / 05 / 25000
12 / 5KVA UPS / 1 / =0.1 / 1 / 100000 / --- / ----
13 / AC / 2 / =0.05 / 1 / 25000 / 1 / 25000
14 / Software(CS Related Syllabus Softwares) / 1 / 200000=0.2 / 1 / 200000 / - / -
15 / Dot matrix Printer / 1 / 11000=0.011 / 1 / 11000 / - / -
16 /

Hardware & Networking Lab

/ Computers / 10 / 400000=0.4 / 05 / 200000 / 05 / 200000
17 / Computer Table / 10 / 100000=0.1 / 05 / 50000 / 05 / 50000
18 / 5KVA UPS / 1 / 100000=0.1 / 01 / 100000 / - / -
19 / Dot matrix printer / 1 / 11000=0.011 / - / ---
20 / Digital Multimeters / 20 / 40000=0.04 / 10 / 20000 / 10 / 20000
21 / RJ 45 Connectors / 100 / 1000=0.001 / 50 / 500 / 50 / 500
22 / Tool Kit / 20 / 10000=0.01 / 10 / 5000 / 10 / 5000
23 / Crimping Tool RJ 45 / 10 / 10000=0.01 / 5 / 5000 / 5 / 5000
24 / Wired Switch / 1 / 35000=0.035
25 / Punching Cat 6 Cable / 500mts / 10000=0.01
26 / LAN Tester / 5 / 5000=0.005 / 3 / 3000 / 2 / 2000
27 / Punching Tool / 5 / 5000=0.005 / 3 / 3000 / 2 / 2000
28 / ADSL Modem / 2 / 4000=0.004 / 1 / 2000 / 1 / 2000
29 / I/O Connectors I/O box +plate / 20 / 6000=0.006 / 10 / 3000 / 10 / 3000
30 / NIC card Wired / 25 / 6250=0.00625 / 15 / 3750 / 10 / 2500
31 / NIC Card Wireless IEEE 802.11 Std. / 25 / 50000=0.05 / 15 / 30000 / 10 / 20000
32 / Spike buster / 30 / 9000=0.009 / 15 / 4500 / 15 / 4500
Total / 2.60625 / 1593750 / 956500

TABLE-9

ESTIMATED COST FOR INFRASTRUCTURAL DEVELOPMENT

Sl.
No. / Expenditure Category / Allocations sought [Rupees in Lakh]
Upto 31/03/2010 / Year 2010-11 / Year 2011-12
A] / Investment Cost
Books [+Journals] / - / 6.5 lakhs / 6.5 lakhs
LRs. / - / 21.5 lakhs / 21.5 lakhs
Sub-Total [A] / - / 28 lakhs / 28 lakhs
B] / RECURRING COST
Consumables / - / 14 lakhs / 10 lakhs
Operation and Maintenance / - / 7 lakhs / 5 lakhs
Sub-Total [B] / - / 21 lakhs / 15 lakhs
Grand Total [A] + [B] / - / 49 lakhs / 43 lakhs

FINANCIAL RESOURCES

2006-07 / 2007-08 / 2008-09
01 / Whether the Institution is receiving grants, if so details during last 3 years / a] State
b] Others
[Pl. specify] / Recurring / Non-Recurring / Recurring / Non-Recurring / Recurring / Non-Recurring

Whether the Institution received any grants from Central Government/and any other agencies such as Tech. Ed. I, II, & III during the last 15 years, if so given details

Scheme / Year / Amount Received / Amount Spent
Nil / 2009-10 / NIL / NIL
Total / NIL / NIL / NIL

Note: Govt.Polytechnic, Immadihalli started during Academic Year 2009-10

Brief write up:

Karnataka’s Share in GDP is around 6%.Karnataka’s industrial policy 2009-14 intends to build a prosperous Karnataka through development of human and natural resources in a systematic scientific and sustainable manner. It aims to provide additional employment for about 10 lakh persons by 2014 by attracting Rs 3,00,000Crof investment and enhance the contribution of manufacturing sector to the states GDP from current levelof 17% to 20% by 2014 focusing on skill and entrepreneurship development.The recently concluded GIM has attracted investments to nearly Rs.5,00,000 Cr. with an employment potential of one million jobs.Govt Polytechnic, Immadihalli will interact with Government of Karnataka and industries who signed MOU’s to get collaboration and support in IFI and on site skill development of Students. Availability of skilled human resources including trained technical manpower in Engg and Technology is major reason for growing investments in the State.

Government Polytechnic, Immadihalli was established in the year 2009-10.The institution is offering four diploma programmes of three years duration with annual intake of 60 for each programme for each year. The programmes are.

1.Diploma in Civil Engg.

2.Diploma in Mechanical Engg.

3.Diploma in Electronics & Communication Engg.

4.Diploma in Computer Science Engg.

There are 285 students (academic year 2010-11) studying in the institute (boys 264 & girls 18) the Institute having it is on threshold of establishing laboratories, workshop and construction of academic and administrative blocks at an estimated cost of Rs. 800 lakhs, institute has a play ground, own bore well.

Majority of students hail from Bangalore rural and urban districts and very few from other parts of Karnataka. The students studying in the polytechnic are from low income group family or middle income group families with Kannada medium study back ground at their matriculation level.The student of the Institute with their semi urban back up are potential and they are very good at work in the field and also on shop floor.

Immadihalli is located in the outskirts of Bangalore. The average annual rainfall is 720mm. Immadihalli is close to ITPL which is IT hub of silicon city Bangalore. In the neighbourhood we have Graphite, TCS, HCL ,Hindustan Lever, GE, Tisco, HP, Seimens, Accenture, Dell, Secon Surveys, Vimoksha.

The Institution is having the committed and dedicated staff.The institute is fully funded by Government of Karnataka as per allocation of the annual Budget.

Since the Institute is recently started from the academic year 2009-10 the existing laboratories, workshop, library, computer lab etc. have to be strengthened, keeping in view of the modernization. By modernization and strengthening of polytechnic with latest techniques, skills, software up gradation, skill oriented training can be imparted to student community. Majority of students, in this rural based polytechnic are poor in English and they scared of their communication in English language.

Though the students are potential and good at work, but the major draw back is lack of communication skill. It is very important for the institute to develop and improve better communication skill among the students, so that the can compete with the students of major cities. Keeping this in view, along with modernization and strengthening of existing laboratories and workshop, it is highly needed to establish A language and communication skill lab, Which helps the students to improve their English language, their communication skill, in turn, indirectly personality development aspects.

OBJECTIVES

  1. To Strengthen the existing Diploma Courses
  2. To Upgrade the Laboratories with state of art equipment
  3. To Establish the State of the art Learning Resource Utilization Centre
  4. To Provide a very safe , neat and tidy academic ambience to the students
  5. To impart competitive technical skills to the students with modernized Laboratory Setup

The main areas of our thrust are

1. Modernization of laboratories: The existing laboratories are to be modernized with new Equipment.

2. Modernization of workshops: Improving the present condition and

Environment of teaching learningprocess for performing better skills.

3. Furniture : Providing a pleasing and comfort

Environment for listening, writing,

Teaching-learning process in the

Workshop and laboratories

4. Teaching Aids (A-V aids) : Making the students the understand the

Subject and new technological aspect

Through audio-video aids.

5. Models (Machine models : Giving pictorial representation of

Turban pumps models components of a machine or of a

Pneumatics kit models structure of a concerned engineering.

Bridges Models, culvert disciplinesothose students can visualize

Models, irrigation models and imaging the plan, elevation and

Transmission towers, cross section views of that model . Satellite signal receiving Models etc.,

6. Non conventional : Being technical students the students Energy aspects should develop concerned towards Environment and natural resources. Student must have awareness of solar energy, alternative eco-Friendly energies