ENVIRONMENT PROTECTION ACTION PLAN

FOR

THE PROTECTION WORK OF RESERVOIR AREA

JIANGXI SHIHUTANG SHIPPING AND HYDROPOWER PIVOTAL PROJECT

AT THE KAN RIVER

CLIENT: NAVIGATIONAL AFFAIRS ADMINISTRATION, JIANGXI PROVINCIAL COMMUNICATIONS BUREAU

EVALUATOR:CCCC SECOND HARBOR CONSULTANTS CO., LTD.

JIANGXI PROVINCIAL WATER RESOURCE PLANNING AND DESIGN INSTITUTE

October 2007

Table of Contents

1.0 GENERAL

1.1 Brief Introduction to the Project

1.2 Preparation Basis

1.3 EIA standards

1.4 Environment Protection Objectives

2.0 ENVIRONMENT MANAGEMENT

2.1 Emvironment ManagementOrgans and Responsibilities

2.2 Environment Supervision

2.3 Environmental Protection Training

2.4 Legal Effect of Environment Protection Action Plan

3.0 ENVIRONMENT PROTECTION MEASURES

3.1 Environment Protection Measures at Design Stage

3.2 Environment Protection Measures during Construction

3.3 Environment Protection Measures during Operation

4.0 ENVIRONMENT MONITORING PLAN

4.1 Environment Monitoring Purposes

4.2 Environmental Monitoring Plan during Construction

4.3 Environmental Monitoring Plan during Operation

4.4 Submission of Environmental Monitoring Report

5.0 ENVIRONMENT PROTECTION INVESTMENT ESTIMATE

5.1 Preparation Principles and Basis

5.2 Investment Item Classification

5.3 Environment Protection Investment Estimate

1.0 GENERAL

1.1 Brief Introduction to the Project

1.1.1 Project Class and standard

The Project is is a multipurpose project, which takes shipping as the main purpose, gives consideration to power generation and flood control. The project belongs to second-class large (2) type project, with normal impounding level of 56.50m, total reservoir capacity of about 632 million m3, the reservoirarea at normal level of 29.2km2,backwater length of 38km,6 water turbine power generating sets, installed capacity of 117MW,annual average power generating capacity of 4.8×108kW·h,belonging to low head building.

The protection work of the reservoir area is composed of five protection areas of TaiheCounty seat, Wanhe, Yongchang, Yanxi and Zhangtang.

⑴ Engineering grade and flood control standard

The village protection work is Grade IV, the protection work of the TaiheCounty seat is Grade III, their flood control standard reoccurrence periods are 10~20 years and 20~50 years respectively. The flood reoccurrence periods of the protection work of the TaiheCounty seat and the village protection work are respectively 20 years and 10 years.

The Wanhe Drainage Pumping Station, the Yanxi Drainage Pumping Station, and the Jintan Drainage Pumping Station belong to middle scale pumping stations. The building grade of the said three pumping stations are the same with that of the fending groynes in which they are located, belonging to Grade 4, the design flood standard is once-every-10-year-flood. The building grade of Huangjiaba and Dongmen drainage pumping stations are the same with that of the fending groynes of the TaiheCounty seat, belonging to Grade 3, the design flood standard is once-every-20-year-flood.

The Zhangtang Regulating Sluice is of middle scale gate, Grade 3 building, with design flood standard of once-every-20-year-flood; The Wanhe Regulating Sluice is of small (1) type gate, Grade 4 building, with design flood standard of once-every-10-year-flood. The crest elevations of typical sections of fending groynes of each protection area are shown in Table 1.1-1.

Table 1.1-1 Crest elevations of typical sections of fending groynes of each protection area

Protection area / Pile No. / Design flood reoccurrence period / Design flood level (m) / Crest elevation calculation value (m)
Wanhe / Wanhe 3+144 / 10 years / 58.27 / 59.27
Yanxi / Yanxi 1+927 / 10 years / 58.72 / 59.72
Zhangtang / Zhangtang 0+135 / 10 years / 59.21 / 60.21
Jintan / Jintan 11+233 / 10 years / 62.04 / 63.04
Taihe / Taihe 2+064 / 20 years / 61.74 / 62.74

⑵ Drainage design standard

For the protection area with villages and towns, the drainage standard is to apply a once-in-a-five-year 3-day rainstorm and drain to the inundation resistant depth within 3 days; the drainage standard of the Taihe County seat is to apply a once-in-a-10-year 1-day storm and drain to the elevation of main buildings non-inundated within 1 day, indicated in the Preliminary Design Report of Flood Control Work of the Taihe County Seat by Ji’an City Water Conservancy and Hydropower Plan and Design Institute; The drainage standard of the guide support canal within the protection area is to apply the corresponding drainage reoccurrence period standard of the protection area, the foreign water guide support canal (river) within the protection area is based on the design flood standard of the fending groyne of the protection area.

1.1.2 Arrangement of protection works

The engineering contractor has designed and arranged five protection areas of Wanhe, Yanxi, Zhangtang, Yongchang and Taihe County Seat. The total length of fending groyne lines of the protection works is 38.38km, including 3.36km Taihe Fending Groyne,8.12km Wanhe Fending Groyne,0.80km Zhangtang Fending Groyne,15.79km Yongchang Fending Groyne and 10.32km Yanxi Fending Groyne,the total length of guide support canal is 61.33km,including 17.18km long county seat guide support canal to be dredged and resumed as per the original section,14.45km Yongchang Guide Support Canal to be refit as per the design standard,29.70km Yanxi and Wanhe guide support (drainage) canals to be built;11.85km diversion canal to be refit;6 new pumping stations with total installed capacity of 5456kW and 2 new regulating sluices.

The arrangement of all the protection works is shown in Table 1.1-2.

⑴ Fending groyne design

The designed fending groyne types are as follows:

Wanhe Section: ~1km long fending groyne close to the pivot area is a clay core pebble one, flood wall is locally applied for earth rockfill fending groyne section with restriction, the remained part is earthen groyne.

Zhangtang Section: the whole section is made of homogeneous soil groyne.

Jintan Section: ~5km long homogeneous soil groyne is arranged near the excavated place of the YuntingRiver rerouting and along the upstream of the Yunting River,flood wall is locally applied for earth rockfill fending groyne section with restriction, the remained part is clay core pebble groyne.

Yanxi Section: ~1.6km long homogeneous soil groyne close to YanxiTown with application of the existing groyne, flood wall and wave protection wall are locally applied for earth rockfill fending groyne section with restriction, the remained part is clay core pebble groyne.

Taihe Section: the whole section is made of clay core pebble groyne.

① Groyne type design

Clay core pebble groyne: the inside and outside slopes are in gradient 1:1.8, the river-facing groyne is face protected with C15 prefabricated slab with protection slope thickness of 0.15m,downstream slope is of grassed slope, groyne top has cemented stone road and 0.6m high wave protection wall. The groyne body is built with pebble and with clay core for antiseepage, crest width of 2m,gradient of 1:0.25. C15 concrete drain ditch is set at the back of the groyne with depth of 0.5m and bottom width of 0.5m.

Homogeneous soil groyne: the river-facing groyne is face protected with C15 prefabricated slab with protection slope thickness of 0.15m and o.15m thick bedding pebble,gradient of 1:2.5, downstream slope is of grassed slope, groyne top has cemented stone road and 0.6m high wave protection wall with gradient of 1:3. The groyne body is built with homogeneous clay for antiseepage. Drain ditch is also set at the back of the groyne.

Flood wall: C20 concrete gravity wall, top width of 1.5m and back slope gradient of 1:0.3.

② Groyne foundation antiseepage

When the ground elevation of the protected object at back of the groyne is higher than the backwater elevation of the reservoir area at 4700m3/s, impervious wall shall be built at the groyne foundation to assure the safety of the protection area.

Table 1.1-2 Protection works arrangement

No / Work name / Fending groyne / Guide support canal/Drainage canal / Drainage pumping station/Regulating sluice / Remarks
Name / Length
(km) / Design level (m) / Top elevation
(m) / Top width
(m) / Average raised height
(m) / Name / Canal line length
(km) / Canal bottom width
(m) / Canal depth
(m) / Canal bed longitudinal gradient
i / Design level
(m) / Top elevation
(m) / Name / Installed capacity
(kW)/ Flow (m3/s)
1 / Yanxi protection work / Yanxi Groyne / 10.32 / 58.4~
60.06 / 59.4~
61.06 / 4 / 4.04 / YanxiUpperGuideSupportCanal / 3.0 / 2.86~
4.54 / 2.04 / 0.0005 / 61.65~
60.00 / 62.36~
60.71 / Yanxi Drainage Pumping Station / 900/12.80 / New canal
YanxiDownGuideSupportCanal / 6.8 / 1.56~
4.55 / 2.05 / 0.0005 / 60.82~
58.10 / 61.53~
58.81 / New canal
YanxiDiversionCanal / 2.0 / 3.94 / 1.77 / 0.0005 / 52.77~
51.77 / 53.41~
52.41 / Refit canal
2 / Wanhe protection work / Wanhe Groyne / 8.12 / 57.75~
59.27 / 58.75~
60.27 / 4 / 3.55 / Wanhe
GuideDrainageCanal
(new) / 19.60 / 14.28 / 3.52 / 0.000165 / 50.27~
53.50 / 51.35~
54.58 / Wanhe Drainage Pumping Station / 2000/28.50 / Pump & sluice combined, Self drainage capacity 70m3/s at non-flood season
WanheDiversionBranchCanal
(Refit) / 2.20 / 3.50 / 1.85 / 0.0005 / 50.59~
51.69 / 51.25~
52.35 / Wanhe Regulating Sluice / 70 / Sluice passing flow
3 / Zhangtang protection work / Zhangtang Groyne / 0.8 / 59.30~
59.32 / 60.30~
60.32 / 4 / 3.59 / Zhangtang Regulating Sluice / 993 / Sluice passing flow

Table 1.1-2 Protection works arrangement (Cont’d)

No / Work name / Fending groyne / Guide support canal/Drainage canal / Drainage pumping station/Regulating sluice / Remarks
Name / Length
(km) / Design level (m) / Top elevation
(m) / Top width
(m) / Average raised height
(m) / Name / Canal line length
(km) / Canal bottom width
(m) / Canal depth
(m) / Canal bed longitudinal gradient
i / Design level
(m) / Top elevation
(m) / Name / Installed capacity
(kW)/ Flow (m3/s)
4 / Yongchang Protection Work / Yongchang Groyne / 15.79 / 59.98~
62.98 / 60.98~
63.98 / 4 / 4.29 / YuntingRiver Rerouting / 16.40 / 60 / 4.0 / 0.0004 / 68.09~
61.51 / 69.09~
62.51 / 2kmYuntingRiver rerouting section
UpperGuideSupportCanal / 5.45 / 2.98~
4.44 / 2.00 / 0.0005 / 65.73~
63.00 / 66.43~
63.70 / Jintan Drainage Pumping Station / 1000/
16.00 / Discharge at YuntingRiver, refit canal
Down GuideSupportCanal / 9.00 / 0.50~
4.80 / 2.16 / 0.0005 / 63.40~
58.90 / 64.14~
59.64 / Refit canal
JintanDiversionCanal / 3.65 / 3.51 / 2.05 / 0.0005 / 53.05~
54.88 / 53.76~
55.59 / Refit canal
5 / Taihe County Seat
Protection Work / Taihe County Seat Groyne / 3.36 / 61.40~
61.97 / 62.40~
62.97 / 4 / 4.02 / ShangtianGuideSupportCanal / 6.58 / 3.44~
5.11 / 2.30 / 0.0004 / 67.00~
64.37 / 67.78~
65.14 / Huangjiaba
Drainage Pumping Station / 1400/
27.25 / Dredged canal
DonggangGuideSupportCanal / 10.60 / 1.45~
6.50 / 2.93 / 0.0002 / 63.22~61.10 / 64.15~
62.03 / Dongmen
Drainage Pumping Station / 111/1.95 / Dredged canal
CountySeatDiversionCanal / 4.00 / 5.24 / 2.36 / 0.0005 / 57.5~55.50 / 58.29~
56.29 / Refit canal

1

⑵ Arrangement of drainage pumping stations (regulating sluices)

The drainage pumping stations (regulating sluices) of every protection area are set at the discharge of the original canal within the protection area. Considering when standard-exceeding flood happens, the protection area will be filled fully with water, which is required to drain out timely after flood, axial flow pumps will be applied, the pump house shall be of wet house type, composed of pump storey and motor storey, the ground elevation of pumping stations shall be filled up flush with groyne top.

⑶ Arrangement of guide support (diversion) canals

Guide support canal line, section guide drainage flow, landform, geology, houses and farmland distribution along the canal line will be decided as per related code, try to minimize house relocation, land occupation, and to make full use of the existing drainage canals. The longitudinal slope of canal normally i=0.00015~0.00050, earth canal at side slope of excavated canal m=1.5,stone canal m=0.75,fill canal m=1.50,flow in canal meets the condition of no scouring and no silting. Canal top superelevation is calculated as per h/4+0.2, canal outlet level is not lower than the level of the outside river. The top width of fill section of guide support canal is 2.0m.

1.1.3 Main inundated substances of the reservoir area

After the fending groynes and farmland elevating measures, the Project is still involved in inundation of five townships, one reclamation farm, forty-four administrative villages of TaiheCounty. Main inundated substances of the upper dam site plan (the recommended plan) at normal impounded level of the reservoir area 56.5m are as follows:

After the fending groynes and farmland elevating measures, the reservoir inundation and the bury of protection works will need to permanently occupy 2829.8Mu farmland (including 701.85Mu paddy field, 2127.9Mu dry land, among which there are 198.27Mu basic farmland), 104.4Mu garden plot, 3130.9Mu other types of land, 32588.6Mu water area; It is involved in relocation of 711 people, impacts of 8 enterprises and institutions, house relocation of 4.56×104m2 and fence relocation of 6392.59m2,11610m2 cement ground, 48 simple buildings, 8 wells, 161 pressing wells, 1 water tower, 221 tombs, 1576 odd fruit trees; 2.21km Grade 4 road, 10.71km tractor road, 18 ferries and docks, 8.62km aerial fiber cable,5.84km underground cable,2.48km CATV line,5.03km 10kV transmission line,7.55km 0.4kV transmission line,3 transformers, 1 tiny hydropower station (200kW), 15 small electrical pumping stations, 1 water plant, 27 sand picking facilities and some other facilities.

The inunation area is involved in inundation of 1453.5Mu farmland and 28.05Mu garden plot, population resettlement of 524 people, and house relocation of 26,602.74m2.

The protection work is involved in bury and occupation of 1376.25Mu farmland and 76.31Mu garden plot, population resettlement of 187 people, and house relocation of 18,947.46m2.

1.1.4 RAP

(1)Resettlement and relocation

The population with farmland inundated and houses not inundated by this project can be resettled through farmland adjustment from the same village or other adjacent villages. Under current situation, the project area needs to resettle rural population of 2175 people (including land occupied by reservoir inundation, protection works, and pivot work), the production resettlement population at the design level year 2010 is 2271 people.

The population to be removed and resettled includes the population below the reservoir inundation line, the population with farmland inundated and houses not inundated needing to resettled in other places and the population affected by the protection works needing to be resettled. The resettled population of the project is those who need to be resettled due to the reservoir inundation or bury of the protection works, the current population to be resettled is 711 people and the population to be resettled in 2010 is 744 people.

(2)Relocation and construction plan of affected resettlement point

The affected people will be resettled mainly in the same village, same team and same township, assuring all the affected households to have production conditions, house construction conditions, and infrastructure conditions of water and power supply and road which are not lower than before. There are 3 planned concentrated resettlement points, altogether 269 people resettled. Resettlement destinations of affected residents are shown in Table 1.1-3.

Table 1.1-3 Resettlement destinations of affected residents

Township / Administrative village / Number of Households / Population / Resettlement
Yanxi / Caoping / 110 / 368 / Partly concentrated resettlement, partly local resettlement and scattered resettlement
Gaping / 2 / 10 / Local resettlement and scattered resettlement
Yanxi Residents Committee / 1 / 4 / Local resettlement and scattered resettlement
Subtotal / 113 / 382
Wanhe / Pingshang / 71 / 264 / Partly concentrated resettlement, partly local resettlement and scattered resettlement
Gaozhang / 9 / 26 / Local resettlement and scattered resettlement
Huwei / 6 / 21 / Local resettlement and scattered resettlement
Subtotal / 86 / 311
Chengjiang / Yuye / 1 / 5 / Local resettlement and scattered resettlement
Mashi / Shukou / 6 / 46 / Concentrated resettlement
Grand total / 206 / 744

(3)Relocation and construction plan of affected enterprises and institutions

According to the substance index survey results, there are 8 units involved in total house relocation area of 4373.71m2. The affected enterprises and institutions are mainly involved in warehouse, processing plants and part of the firms, most of them are located at the scope affected by fending groynes or at the edge of the reservoir inundation line, part of the production and residence land and facilities of the enterprises and institutions are affected. Among the affected units, no one is required to wholly remove, all are just partly affected, and their main bodies are not affected. Relocation and construction plan of affected enterprises and institutions are given in Table 1.1-4.

Table 1.1-4 Relocation and construction plan of affected enterprises and institutions

No / Unit / Relocated house area (m2) / Impact degree / Resettlement
1 / Taihe Fenghuangtun Industry Co. Ltd. / 351.45 / Local / Demolition compensation
2 / Jiangbian Plastics Factory / 149.61 / Local / Demolition compensation
3 / Shiqian Sand Pickup Plant / 39.50 / Local / Demolition compensation
4 / Yanxi Channel Administration Station / 382.19 / Local / Nearby resumption
5 / Taihe Shipping Co. Ferry / 16.91 / Local / Demolition compensation
6 / Brick Works / 2259.96 / Local / Partly demolition compensation, partly nearby resumption
7 / Sand Works / 376.86 / Local / Demolition compensation
8 / WanheGrainSupplyCenter / 797.23 / Local / Partly demolition compensation, partly nearby resumption

(4)City residents’ removal plan

After the fending groynes are built, the project will not be involved in city residents’ removal.

(5)Resumption and construction plan of special works

Land acquisition of the project is involved in 2.21km Grade 4 road, 10.71km tractor road,18 ferries and docks, 82.47hm2 land elevating area,which will be resumed as per the original scales and functions in the planned compensation modes.

1.2 Preparation Basis

⑴ The World Bank’s operating guidelines and requirements on EIA.

⑵ Chinese laws, rules and regulations concerning EIA of construction projects

⑶ Chinese technical guide rules and industrial codes concerning EIA of construction projects

⑷ EIA Letter of Entrustment.

1.3 EIA standards

According to Jiangxi Provincial Environment Protection Bureau’s Document No. [2007]213: “Approval for the implementation standards for the environment impact assessment of the Jiangxi Shihutang Shipping and Hydropower Pivotal Project at the Kan River”, the following standards are executed in this EIA:

1.3.1 Water environment

⑴Category II of Surface Water Quality Standard (GB3838-2002) will be based for water environment baseline and impact assessment for the water area of Gouzinao Water Intake and its water source reserve and Nanmenzhou Water Intake and its water source reserve. Category III of Surface Water Quality Standard (GB3838-2002) will be based for water environment baseline and impact assessment for the other water areas. (See Table 1.3-1).

⑵Wastewater discharge will be evaluated by Class I in Integrated Wastewater discharge Standard (GB8978-1996) (see Table 1.3-2).

1.3.2 Ambient air

⑴ Class II of the Ambient Air Quality Standard (GB3095-1996) will be applied for ambient air baseline and impact assessment (See Table 1.3-3).

⑵ Emissions of air pollutants are evaluated using Class II standard in Integrated Emission Standard of Air Pollutants (GB6297-1996) (see Table 1.3-4).

Table 1.3-1 Surface Water Quality Standard (GB3838-2002) Unit:mg/L(except pH)

No / Item / Category Ⅱ / Category Ⅲ
1 / PH / 6~9
2 / NH3-N / ≤0.5 / ≤1.0
3 / DO / ≥6 / ≥5
4 / Potassium permanganate index / ≤4 / ≤6
5 / BOD5 / ≤3 / ≤4
6 / Oils / ≤0.05 / ≤0.05
7 / Total P / ≤0.1(lake, reservoir 0.025) / ≤0.2(lake, reservoir 0.05)
8 / Total N / ≤0.5 / ≤1.0
9 / Volatile phenol / ≤0.002 / ≤0.005
10 / Coliform (pcs/L) / ≤2000 / ≤10000
11 / Hg / ≤0.00005 / ≤0.0001
12 / Cr+6 / ≤0.05 / ≤0.05

Table 1.3-2 Integrated Wastewater Discharge Standard(GB8978-96) Unit: mg/L