Statement of Work for the Cart Storage Building

1.1DESCRIPTION OF SERVICES: Responsible for the replacement of canopy/cover at the golf course Maintenance storage area and wash rack cover bldg. 2467.

1.2BASIC SERVICES. The contractor provides all of the skilled labor and material needed to complete recovering of Storage/Wash Rack area.

1.3 SPECIFIC DUTIES. The contractor is responsible for all tasks to complete construction of.

1.3REQUIREMENTS. Provides material/skilled labor that has knowledge and experience to complete the task correctly and in a timely manner.

1.5QUALITY ASSURANCE. Golf course manager/asst. manager will evaluate performance of contractor during the construction.

1.6REPORTING. The contractor reports directly to the golf course manager/asst. manager.

1.7DATES AND WORK HOURS. Work shall be accomplished within fifteen (15) working days after receipt of the purchase order. Work days will be scheduled through the Golf Course Manager. Scheduled work days were weather makes it impossible to work will be rescheduled. Work hours will be from0700 to 1700. All work will be accomplished in 15 working days.

1.8PAYMENT: Payment will be made as following;

(a)NAFI Fund Manager. Osan Air Base or his/her designee is the receiving officer for the receipt of the service.

(b)The Receiving Officer is responsible for inspection and acceptance of services, and preparation of receiving reports through Internet Based Purchasing System (IBPS.) The Receiving Officer is required to make distribution of the receiving report, no later than the last working day of the month, to the following addresses;

1 Original and 1 copy to the Paying Office

(See Block #12)

1 Copy to the Contracting Office

(See Block #5 of Purchase Order)

1.9Following is a list of required materials needed for patio extension per submitted plan:

(a)Storage:

  1. Tarpaulin (쫄탑 원단) 0.5mm T, 1200mm width

HAN HWA Co. Model SOL-ASG 1609 or equivalent 400yds

  1. Rope Nylon 4mm outside 6mm insidediameter 400yds

(b)Wash Rack:

  1. Tarpaulin (쫄탑 원단) 0.5mm T, 1200mm width

HAN HWA Co. Model SOL-ASG 1609 or equivalent 60yds

  1. Rope Nylon 4mm outside 6mm inside diameter 60yds

Includes with the high-frequency work for the cover, punch holes, all labor, tools, parts, materials, equipment, transportation, and other incidentals necessary to accomplish the work.

2.1 TERMINATION FOR THE GOVERNMENTS CONVENIENCE: The Government reserves the right to terminate this contract, or any part hereof, for its solo convenience. In the event of such termination, the contractor shall cease all workhereunder and shall immediately cause any or all of its suppliers and contractors to cease work.Subject to the terms of this contract, the contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, having resulted from the termination. The contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the government any right to audit contractor’s records. The contractor shall not be paid for any work performed or costs incurred, that reasonably could have been avoided.