G9W9 SVQ3 Plumbing at SCQF level 6 - Structure

To attain the qualification candidates must complete 8 Units in total. This comprises:
¨  7 Mandatory Units
¨  1 Optional Units

Please note the table below shows the SSC identification codes listed alongside the corresponding SQA Unit codes. It is important that the SQA Unit codes are used in all your recording documentation and when your results are communicated to SQA.

Mandatory Units: Candidates must complete 7 Units
SQA code / SSC code / Title / SCQF level / SCQF credits
F9H3 04 / M1 / Apply Health and Safety Legislation and Working Practices (Mechanical Services) / 5 / 16
F9KH 04 / M2 / Apply Environmental Legislation, Working Practices and Principles (Mechanical Services) / 5 / 16
F7G2 04 / M3-6 / Maintain working relationships and oversee work activities / 6 / 16
F9H5 04 / M8, 27, 10, 25, 13, 14, 15, 12 / Install and Commission Hot and Cold Water Systems / 6 / 22
F9H6 04 / M8, 27, 13, 14, 15, 12, 10, 25 / Install and Commission Central Heating Systems / 6 / 22
F9H7 04 / M32 / Carry out Work on Electrical Systems for the Control (and Supply) of Mechanical Services (Limited Scope) / 6 / 12
F9H8 04 / M8, 27, 13, 14, 15, 12, 10, 25 / Install Above Ground Drainage Systems / 6 / 12
Optional Units: Candidates must complete 1 Unit from this group
SQA code / SSC code / Title / SCQF level / SCQF credits
F9H9 04 / M7, 8, 10, 25, 27, 13, 14, 15, 12 / Install and Commission Fuel Systems: Gas / 6 / 16
F9HA 04 / M7, 8, 10, 25, 27, 13, 14, 15, 12 / Install and Commission Fuel Systems: Oil / 6 / 16
F9HC 04 / M7, 8, 10, 25, 27, 13, 14, 15, 12 / Install and Commissioning Fuel Systems: Solid Fuel / 6 / 16
F9HD 04 / M7, 8, 10, 25, 27, 13, 14, 15, 12 / Emergent Technologies / 6 / 16
Additional Optional Extras
F9HE 04 / M11 / Install Weathering Systems / - / -