[title]

[secondary title]

Property Address: / (e.g. 101-103 Abacus Road, LOGANVILLE)
Survey Plan No: / (e.g. SP234133)
File No: / (e.g. Council's Reference File No: RC14/0001)
Relevant Development Permit Details: / (e.g. RL/140/2008 - 1 Lot into 20 Lots and Material Change of Use (Change in Density))
(e.g. RL/140/2008/A - Request to Change an Existing Approval)
(e.g. OW/112/2009 - Civil Works Associated with Reconfiguring a Lot (1 into 20 Lots))
(e.g. OW/133/2009 - Landscaping - 20 Lots inc. Park/Drainage Reserve)
(e.g. OW/201/2009 - Electrical Reticulation)
Contact Person: / (e.g. Barry McMaster)
Contact Number/s: / (e.g. 0402-482-963 and (07) 3415-2582)

DIRECTIONS

  • Step 1: Please copy and paste all relevant conditions of approval into the 'Conditions' cells provided. The information for your development approval can be provided by contacting the Plan Right staff, either phone Council on 47279001 or email our plan sealing staff at . The information provided in this template is a guide only.
  • Step 2: Please add more rows or delete rows as necessary depending on whether you want to consolidate all conditions into one document, or if you would prefer to split the documents via each relevant approval. The choice is yours.
  • Step 3: Please provide details in the corresponding 'How it Complies' cell on how your development has demonstrated compliance with the condition. This cell may include information relating to Council invoice/receipt numbers and must also include references to attached documents such as certification certificates, agreements, reports etc.
  • Step 4: Please load your completed 'Development Permit Conditions Compliance Checklist/s' onto a CD and lodge with Council as part your plan sealing application. Please ensure that if you are saving several compliance checklists, that you differentiate these by using the application number within the document title.

Conditions / How it Complies
Reconfiguring a Lot conditions RC14/0001
Condition 1 – Proposal Plans
The development of the site must be undertaken generally in accordance with the following plans, except as altered by this approval:
  • Insert approved plans table from approval
/ Suggested Response:
The development complies with the approved plans listed in this condition, with no requirement to bond any works.
Condition 4 – Building Envelope Plan
Building envelope plan is to be prepared for each lot / Suggested Response:
A preliminary plan has been submitted with the application for Operational Works and has been approved as part of the issue of a Development Permit for those works.
OR
Approval of the Building Envelope Plans have been approved in correspondence dated 05/01/14. See attached approval.
Condition 6 – Public Open Space Transfer/contribution
The land shown on the approved plans as public open space is to be transferred to the Crown as a parkland reserve free of cost. / Suggested Response:
The land has been appropriately notated on the Survey Plan.
Or
Open space contributions have been paid in accordance with the Adopted Infrastructure Charges Notice.
Condition 8 -
Street tree planting to beautify the neighbourhood are to be provided in accordance with Council Policy. / Suggested Response:
Street trees have been provided in accordance with the approved landscaping plan and have been accepted as part of the On Maintenance inspections. See attached photographs of the street trees.
Condition 13 Roadworks
The developer must design and construct roads, along all road frontages to each lot and any modification to existing roads as shown on Drawing Number xxxxx dated xx/xx/xx In particular: / Suggested Response:
See the As Constructed drawings attached that were approved on [insert date].
A copy of the On Maintenance Certificate [insert ref. number]) is attached.
Condition 14
The development must be serviced by the public water supply. In particular,
a)A reticulated water supply must be provided to the frontage of each lot within the proposed development and connected to council’s infrastructure prior to the signing of the survey plan. The water supply must be constructed in accordance with the standard design plans of council and must meet both the maximum design flow and emergency fireflow conditions.
b)The point of connection for the supply of water from council's water supply system isinsert.
c)A network analysis of the proposed subdivision must be submitted to and approved by council to ensure that the reticulation network satisfies both the maximum hour design flow conditions and emergency fire flow conditions. It must be submitted with the application for Operational Works. / Suggested Response:
See the As Constructed drawings that were approved on [insert date].
A copy of the On Maintenance Certificate (Reference number [insert ref. number] is attached.
Condition 15
The development must be serviced by the public sewerage network, in particular:
a)Each allotment must be provided with a single property service and must be connected directly and separately to council's sewer prior to signing the survey plan.
b)All new property connections to be made directly to manholes where possible.
c)The point of connection for the sewerage system to council's sewerage infrastructure including all necessary pump stations and rising mains must be the nearest existing sewer manhole or as agreed by council. / Suggested Response:
See the As Constructed drawings that were approved on [insert date].
A copy of the On Maintenance Certificate (Reference number [insert ref. number] is attached.
Advice
An Adopted Infrastructure Charges Notice outlining the estimated infrastructure contributions payable relevant to the Development Permit is attached for your information. / Suggested Response:
All Infrastructure charges have been paid, see attached receipt.
OR
Infrastructure credits have been confirmed and adjusted charges paid. See attached correspondence confirming credits and receipt/s.
Operation Works conditions OP14/0001
Condition 1 – Proposal Plans
The development of the site must be undertaken generally in accordance with the following plans, except as altered by this approval:
  • Insert approved plans table from approval
/ Suggested Response:
Approved at Operational Works stage. See [OW/00/0000] approved on [insert date].
See the As Constructed drawings that were approved on [insert date]
Condition 4 – Insurance Indemnity
From the commencement of works until Final Completion/the commencement oftheMaintenance Period, the applicant must insure the works against public liability ($10 million dollar minimum cover) and other claims arising from the works, and indemnify Council against that liability. Council must be included as an interested party to the insurance policy. The applicant must provide Council with evidence of the insurance and indemnification before commencing the works. / Suggested Response:
Confirmation of insurance is provided, see attached.
Condition 6 – Compliance Inspection fee
a)A works inspection fee (at the rate applicable at the time of payment) must be paid prior to the works being accepted On Maintenance/Final Completion.
b)A reinspection fee (at the rate applicable at the time of payment) will be applicable where an additional inspection is required due to works being incomplete or unsatisfactory at the initial inspection. The reinspection fee must be paid prior to the additional inspection being conducted. / Suggested Response:
Inspection fees have been paid, see attached receipt.
Condition 10 - On Maintenance
The developer must provide the Planning Assessment Unit at least five (5) business days notice, requesting the works be checked for compliance with the approvals and be accepted ‘On Maintenance’.
The works must become ‘On Maintenance’ for a minimum period of twelve (12) months (Maintenance Period) subject to, but not limited to, satisfaction of the following: / Suggested Response:
See the As Constructed drawings attached that were approved on [insert date].
A copy of the On Maintenance Certificate [insert ref. number]) is attached.
Condition 16 - Geotechnical
a)Prior to signing of the survey plan, the developer must provide geotechnical certification that the works "as constructed" have a landslip risk classification of “low” in accordance with “Landslide Risk Management” Australian Geomechanics Journal Volume 43 No. 1 March 2007.
b)Prospective purchasers of the land must be notified of that the land has been certified by geotechnical professional as having a “low risk” in relation to landslide and that any building and associated further development works are to be designed and certified by a geotechnical professional to maintain landslide risk as “low”. The condition must also include notification of any particular works or measures which are identified in the geotechnical report. A copy of the sales contract condition is to be provided to Council for approval.
Council will insert a condition in the rates database to the effect that any building and associated further development works are to be designed and certified by a geotechnical professional to maintain the landslide risk as “low”. / Suggested Response:
Geotechnical Certification has been provided and is attached.

PAGE > 1 OF 6[ DIRECTORATE - SECTION ]ABN > 44 741 992 072