1741 S. HOOVER CT
WICHITA, KS 67209
316-942-0411
316-942-0011 (FAX)
Supplier/VendorSurvey Questionnaire
General Information:
Company Name: ______
Address: ______
City: ______State: ______Zip Code: ______
Telephone: ______Fax #: ______
Administration:
Head of Quality Dept.: ______Title: ______
Email Address: ______
Reports To: ______Title: ______
Total Employees: ______Production: ______Quality:______
Company Website: ______
Distributor: Yes:______No: ______
Indicate Products to Distributed: ______
Manufacturer: Yes:______No: ______
Indicate Products to Manufacture:______
Service Provider: Yes:______No: ______
Indicate Service to be Provided: ______
Quality System Information
Please indicate the standard(s) that your quality system is based upon:
Third-Party Certified to the following Compliant to the following*
ISO9001:2000 / ISO9000AS9100 Rev: B / NADCAP
AS9100 Rev: C / FAA Repair Station
D1-9000 / Other
* If applicable please indicate when your company plans on upgrading to
ISO9001:2000 or AS9100 Rev C: ______
If you are certified to any of the standards listed above please include a copy
of your certification and skip to the Digital Data Section.
______
Quality System/Planning: Yes NoN/A
1.Do you have a documented Quality Manual? ______
2.Do you have a Quality Policy andProcedures? ______
3.Do you have evidence of current internal audits?______
4. Do you have a training program for employees?______
5.Do you provide process certification reports with each
shipment to your customer? ______
6.Are quality records maintained for a period of time as
required by contract, purchase order or specification?______
7.Do you have work orders or routers present with each
in-process fabrication project?______
8.Does every operation on the work order or router have
sufficient instructions to correctly manufacture the product?______
9. Are product quantities verified at each operation? ______
In-Process Inspection:Yes NoN/A
1.Are there sufficient inspection points during and after
manufacturing and processing to ensure a quality product?______
- Are non-conforming parts identified and segregated? ______
3. Is each operation signed off or stamped before
proceeding to the next operation? ______
4.Are all incoming parts and materials processed through
a receiving inspection function?______
5.Is there a calibrated tool and gauge recall system?______
6. Are tool and gauges calibrated on a regular basis and
traceable to the National Institute of Standards &
Technology (NIST)?______
Drawing and Document Control:Yes NoN/A
1.Are procedures in place to ensure supplier created and/or
customer furnished drawings are issued or supplied for
use by procurement, planning, production and quality?______
2.Are procedures in place for control of customer furnished
drawings and data? ______
3.Does a procedure exist to approve each document for
adequacy prior to issue, reviewed, updated and re-approved
as needed?______
Discrepant Material and Corrective ActionYes NoN/A
1.Does your Quality System have a process for
non-conforming product and provide evidence of
corrective action?______
2.Are products that do not conform to customer manufacturing
and process specifications immediately tagged and
segregated?______
3.Are nonconforming or discrepant products brought before
the customer’s Material Review Board for action?______
Yes No N/A
4.Are written procedures used for repair, rework, and
disposition of discrepant material, including customer returns?______
5.Are corrective action procedures in place to prevent
recurrence of discrepancies?______
Receiving Inspection/Stock:Yes NoN/A
1.Are incoming materials/supplies inspected to verify compliance
to purchase order and specification requirements?______
2.Are purchase orders readily available for receiving inspection
purposes?______
3.Are inspection results documented and on file?______
4.Does the company use an Approved Supplier List to procure
items and are incoming materials checked against the
approved supplier list prior to acceptance?______
5.Are all raw materials, chemicals and purchased hardware,
which are utilized for manufacturing, stored in a controlled area
and clearly identified and can be traced to the applicable
certification documents ?______
Packaging and Delivery:Yes NoN/A
1.Are parts/product packaged to protect from damage during
delivery?______
2.Are products traceable to all material, manufacturing and
processing certifications?______
3.Are all required documentation, i.e., test reports, certifications,
First Article Inspections, etc. supplied with each shipment? ______
If you are a manufacturer please fill out the Digital Data Section below, if not please proceed to the Supplier/Vendor Certification Section.
Digital Data (CAD, CAM, IGES, ets):Yes NoN/A
1.Do you currently possess and/or use digital data?______
Yes NoN/A
2.Is there a process to control configuration of data sets from
receipt throughout the manufacturing and acceptance
processes?______
3.Do you have a customer approval for the Digital Data
(DPD/MBD) Program being used at your facility? ______
Supplier/Vendor Certification:
Print Name: ______Title: ______
Signature: ______Date: ______
Reason for Request:
New Supplier: Annual Update:
Other: ______
Supplier/Vendor Classification:______
Quality Assurance Remarks/Recommendations:
Approval: Disapprove:
Comments: ______
Reviewed By CE Machine Quality Assurance Manager:
Name: ______Date: ______
SVQ-001 Rev A C.E. Machine Co., Inc. Supplier/Vendor Questionnaire Page 1