Armed Forces Retirement HomeDesign Build Services Request for Proposal
Gulfport, Mississippi21 May 2007
SECTION 00005 – TABLE OF CONTENTS
Chapter 1 –TERMS OF THE SOLICITATION, OFFER AND AWARD
SectionTitle
00100Solicitation, Offer and Award (GSA Standard Form 1442)
00120Supplementary Instructions to Offerors
Supplementary Instruction to Offerors
Solicitation Provisions
00200Instructions to Offerors
Introduction
Overview of the Procurement Process
Evaluation Factors
Relative Importance of the Evaluation Factors
Format of the Proposal
Submitting the Proposal
00300Information Available to Offerors
00600Bonds, Representations and Certifications
Bid Bond, Standard Form 24
Performance Bond, Standard Form 25
Payment Bond, Standard Form 25A
Representations and Certifications
00700Construction Contract Clauses
Construction Contract Clauses
00800Supplementary Conditions
00900Labor Standards Provisions
Labor Standards Provisions
Wage General Decision
Chapter 2–EXECUTIVE SUMMARY
- Introduction
- Mission Statement
- Scope of Work
- AFRH Concerns and Expectations
- AFRH Space Program Goals
- Implementation Strategy
- Critical Delivery Dates
- Project Budget
- Project Authorization
Chapter 3- GENERAL REQUIREMENTS
SectionTitle
01006Design Process
01011Sustainable Design
01140Work Restrictions
01210Allowances
01260Options
01310Project Management and Coordination
01320Preliminary Design-Build Progress Documentation
01321Design-Build Network Analysis Schedules
01322Photo Documentation
01330Submittal Procedures
01380Mock-Up Requirements
01420References
01450Design & Construction Quality Control
01500Temporary Facilities and Controls
01593Security Regulations
01595Safety and Health
01600Product Requirements
01700Execution Requirements
01731Cutting and Patching
01732Selective Demolition
01735Fire Prevention Precautions for Hot Work
01770Closeout Procedures
01781Project Record Documents
01782Operation and Maintenance Documentation
01800Commissioning
01820Demonstration and Training
Chapter 4 - GENERAL BUILDING REQUIREMENTS
- Housing Plan/Space Requirements
- Special Space Requirements
- Site Description
- Demolition
- Base Contract and Options
- Parking and Transportation
- Building Form
- Furniture, Fixtures & Equipment (FF&E)
- Design Excellence
- Good Neighbor
- Operations and Services
- ComprehensiveBuilding Commissioning
Chapter 5 - PROGRAM GOALS
- Level of Quality
- Workplace Performance
- Residential Living Units
- Space Flexibility
- Acoustic Quality
- Indoor Air Quality
- Sustainable Design
- Energy Efficiency
- Water Conservation
- Thermal Envelope Integrity
- S.A.F.E.
- Seismic and Hurricane Safety
- Emergency Systems and Reliability
- Physical Security
- Blast Protection
- Fire and Life Safety
- Health and Environmental Safety
- Efficient Operations and Maintenance
- Building Automation
- Materials Handling
- Durability and Maintainability
- Accessibility
- Historic Preservation
- Innovative Technologies
Chapter 6 - SPACE REQUIREMENTS
- Programming Overview
- AFRH GulfportOrganizational Structure
- Summary of Space Requirements
- Program Description
- ProgrammingConcepts
- Adjacency Diagrams
- Programmatic Building Section
- Key Programming Assumptions
- Program of Space Requirements and Room Data Sheets
Chapter 7 – SYSTEMS
A – CIVIL / LANDSCAPING
- Introduction
- Site Survey
- Subsurface Investigation
- Environmental Assessment
- Site Design
Chapter 7 – SYSTEMS (cont’d.)
B – ARCHITECTURE
- Architectural Design
- Exterior Walls
- Exterior Balconies
- Exterior Glazing and Doors
- Roofing
- Partitions, Doors and Specialties
- Interior Finishes
- Conveyance Systems
- Special Construction
C – STRUCTURAL
- Codes and Standards
- Structural Loads
- Live Loads
- Wind Loads
- Flood Loads
- Seismic Loads
- Foundations
- Garage Level Construction
- Superstructure
- Exterior Walls
- Special Construction Requirements
- Structural Observations
- Building Demolition and Abatement
D – ANTITERRORISM / FORCE PROTECTION (AT/FP)
- Basis of Design
- Minimum Physical Security Requirements
E – HEATING, VENTILATION & AIR CONDITIONING (HVAC)
- Overall Project Criteria
- Basic Design Parameters
- HVAC Equipment Sizing Criteria
- Duct Sizing Criteria
- Pipe Sizing Criteria
- Recommended Heating, Ventilation and Air Conditioning Systems
- Special Construction
- Building Demolition and Abatement
Chapter 7 – SYSTEMS (cont’d.)
F – ELECTRICAL
- General Requirements
- Electrical Service and Distribution
- Lighting and Branch Wiring
- Emergency Power
G – PLUMBING
- General Requirements
- Equipment Schedules
- Plumbing Fixture Selection
- Water Distribution Systems
- Sanitary and Storm Drainage Systems
- Interior Fuel Gas System
- Riser Diagrams
- Submissions
- Special Construction
H – FIRE PROTECTION
- General Requirements
- Qualifications of Fire Protection Engineer
- Fire Protection and Alarm Systems
- Special Construction
I – TELECOMMUNICATIONS
- General Requirements
- Telecommunications Services
- Resident Monitoring Systems
- Security Systems
J – COMMISSIONING SERVICES AND COMMISSIONING PLAN
- Overview
- Commissioning Authority
- Systems To Be Commissioned
- Commissioning Plan
Chapter 7 – SYSTEMS (cont’d.)
K – KITCHEN AND FOOD SERVICE
- Introduction
- Summary of Goals
- Furnishings and Equipment
- Warranty
- Waste Systems
- Sound Control
- Sustainable Design
- Energy Efficiency
- Exhaust Hoods
- Water Conservation
- Seismic and Hurricane Safety
- Physical Security
- Fire and Life Safety
- Efficient Operations and Maintenance
- Building Automation
- Materials Handling
- Durability and Maintainability
- Accessibility
- Innovative Technologies
- Applicable Codes, Standards and Guidelines
- Equipment List
L – ELEVATORS
- General Requirements
- Minimum Cab Size
- Location
- Quality Assurance
- Maintenance
- Summary
- Car Performance
- Approved Microprocessor Control System
- Emergency Medical Service
- Entrances
- Door Operator and Door Control Devices
- Passenger and Service Cabs
- Hall Controls
- Group Control and Display
- Execution and Manuals
Chapter 7 – SYSTEMS (cont’d.)
M – LEED
- Leadership in Energy and Environmental Design (LEED)
- Design Approach
- LEED Checklist Summary
N – BUILDING CODES and STANDARDS
- Introduction
- Jurisdiction
- Applicable Codes and Standards
- Organizations
- Abbreviations
- Preliminary Code Analysis
Chapter 8 – APPENDIX
APPENDIX A - ROOM DATA SHEETS
- Base Contract
- Option 1 Add
- Option 2 Add
APPENDIX B –FF&E RESPONSIBILITY MATRIX
APPENDIX C –ADDITIONAL INFORMATION
- Geotechnical Information – To Be Issued in Amendment
- Site Survey and Topographic Information – To Be Issued in Amendment
- Environmental Assessment Information – To Be Issued in Amendment
- Drawings of Existing High-RiseBuilding
- Other Information
APPENDIX D– SOURCES
APPENDIX E–DRAWINGS OF EXISTING FACILITIES
APPENDIX F–DRAFT COMMISSIONING PLAN
END OF SECTION 00005