NSSP approved by Traffic Sign Sponsor, Don Howe, on ______.
Section 12-3.11. Use on a project with an estimated cost of at least $750,000 and at least 50 working days. Do not use for a seal coat, surfacing, or seismic project. Do not include plant establishment or permanent erosion control establishment days in the number of working days.
Updated draft provided by Don Howe 11-15-17 to include Senate Bill 1 (SB1) Project Funding Identification (C47C(CA)) signs.
DO NOT USE 01-20-17 SSP 12-3.11, it is an obsolete version reverting back to the 2010s.
NSSP identifies header numbering consistent with SSP to be updated, until Traffic Ops issues an RSS correction/SSP correction and/or other 12-3.11B(5) & 12-3.11C(3) updates.
Clarification added to instructions for pars. 1, 4, 6, 7, 8, 9 and 11.
Replace Reserved in section 12-3.11B(5) with:
1. Use if details for construction Project Funding Identification signs are not shown. Change the sign designation to C47A(CA) if the project includes local agency funding and features a local agency name or pictograph in the fluorescent orange header panel. For the SB1 Project Funding Identification C47C(CA) sign, amendment is pending for section 6F.109(CA), in revision 3 of the 2014 CA MUTCD. For specific Standard language, see http://www.dot.ca.gov/trafficops/tcd/pfi.html, and insert appropriate sign designation C47A(CA), C47B(CA), or C47C(CA).
A construction Project Funding Identification (C47_(CA)) sign must comply with the details specifications for Project Funding Identification signs in section 6F.109(CA) of the California MUTCD and shown on at the Department's Traffic Operations website.
2
The sign must be a wood-post sign complying with section 82-3.
3
The sign panels must be framed, single-sheet aluminum panels complying with section 82-2.
4. Type XI retroreflective sheeting will be used for rigid substrate construction area signs.
The background on the sign must be Type IIXI retroreflective sheeting. The Type IIXI retroreflective sheeting must be on the Authorized Material List for signing and delineation materials.
5
The legend must be retroreflective except for nonreflective black letters and numerals. The blue and fluorescent orange must match the FHWA’s color specifications available at the FHWA’s MUTCD website. PR color no. 3 on FHWA's Color Tolerance Chart. The orange must match PR color no. 6 on FHWA's Color Tolerance Chart
6. Replace TYPE OF PROJECT with one of the project types shown in the following table or delete for SB1 (C47C(CA)) signs:
Type of project: / Work description examples:Highway construction / Construct expressway, freeway, shoulders, structure, HOV lane, ramp, interchange, left turn lane, truck escape ramp, or weigh station; widen freeway, roadway or shoulders; realign roadways.
Highway repair / Clean and paint overhead sign structure; crack, seal, and grind pavement; pavement markings; pavement rehabilitation; ramp repaving; replace culverts, drainage systems, railroad crossings, or sign structures; retrofit curb ramps.
Highway improvement / Channelization; changeable message signs; highway advisory radio system; median barrier; motorist aid communication system; ramp metering; retaining and sound walls; signal modification; signals and lighting; traffic signals; traffic count stations; traffic operations system; slope protection; thrie beam barrier; realign curve; modify interchange or gore; reconstruct interchange.
Bridge construction / Replace, remove or widen bridge; construct overcrossing, pedestrian overcrossing, overhead, undercrossing, sidehill viaduct, or interchange connectors.
Bridge repair / Clean and paint bridge; clean and replace joint seals; upgrade joints seals; modify bridge railing; raise bridge; replace bridge bearings; rehabilitate bridge decks; tunnel rehabilitation.
Roadside work / Erosion control; highway planting and irrigation; replacement planting; revegetation; irrigation upgrade; planting; restoration and irrigation; maintenance station; landscape maintenance station; maintenance yard and building; pumping plant; safety roadside rest area; vista point; park and ride lot; transit station; truck inspection facility; truck scale; right of way fence upgrade; biological or habitat enhancement; treat contaminated water supply.
The legend for the type of project must read as follows:
TYPE OF PROJECT
7. Specify the type of funding. If county funds are involved (i.e., a cooperative agreement is provided), specify the type of county funding. Otherwise, delete the third line. If the project does not have any federal funding, delete the first line. On SB1 Projects, no listing of Federal, State or ___ County will be shown on the C47C(CA) sign (delete par. 7 if SB1 Project Funding Identification (C47C(CA)) sign is used).
The legend for the types of funding on a construction project funding sign must read as follows and in the following order:
FEDERAL HIGHWAY TRUST FUNDS
STATE HIGHWAY FUNDS
___ COUNTY TRANSPORTATION FUNDS
8–9. Use to include the year of project completion on the sign. Delete if SB1 (C47C(CA)) signs are used.
8. Use if the Engineer is to specify the year of completion.
The Engineer provides the year of completion for the legend on the sign. Install a sign overlay for the year of completion within 15 days of notification.
9. Insert the year of completion if the Engineer is not to provide the year of completion.
The legend for the year of completion on a construction project funding sign must read as follows:
YEAR OF COMPLETION ___
10
Do not add information to the construction project funding sign unless authorized.
Replace Reserved in section 12-3.11C(3) with:
11. Insert the quantity and type of construction project funding signs on the project. Insert Type 1 for conventional highways and Type 2 for freeways and expressways. For size, insert 96 by 60 inch for conventional highways and 144 by 90 inch for freeways and expressways. Per Specification Style Guide, edit as quantity and size – “2 (quantity) 96 by 60 inch (size) construction project funding…" etc. Edit as necessary to include required both sizes.
Install __(quantity)Type ___(size) construction project funding identification signs at the location determined by the Engineer before starting major work activities visible to highway users.
12
Dispose of construction project funding signs upon completion of the project if authorized.