Revised 06/19/2014
FPL Transmission Service Request
Transmission Studies[1]
Study Name and Description / Study Type / Date of StudyDesignation of Network Resource – Dade County,FLTSR 927068 et. al. / System Impact Study
Facilities Study / 07/24/07
09/17/07
Point to Point TSR 952617 et.al. Georgia to Florida / System Impact Study
Initial Facilities Study
SSR Facilities Study
Revised Facilities/System Impact Study / 06/12/07
10/19/07
04/23/08
10/17/08
Point to Point TSR 71545767 et. al. Georgia to Florida / System Impact Study
Initial Facilities Study
SSR Facilities Study / 12/03/07
03/18/08
05/14/08
Designation of Network Resource– Hardee County, FLTSR 71906502 / System Impact Study / 05/19/08
Point to Point TSR 72119536 Georgia to Florida / System Impact Study
Facilities Study
System Impact Restudy
Facilities Restudy / 08/12/08
11/26/06
03/16/09
06/17/09
Network Service TSR 72145962 et. al. / System Impact Study
Facilities Study
Facilities Re-Study / 08/15/08
12/12/08
03/04/09
Point to Point TSR 72183773 Georgia to Florida / System Impact Study / 08/22/08
Point to Point TSR 72358353Georgia to Florida / System Impact Study
System Impact Restudy / 11/07/08
02/24/09
Point to Point TSR 72386791 Desoto Plant to Progress Energy Florida / System Impact Study / 11/11/08
Point to Point TSR 74035532 JEA to New SmyrnaBeach / System Impact Study / 06/03/10
Point to Point TSR 74464075 SOCO to Orlando Utilities Commission / System Impact Study
Facilities Study / 11/01/10
01/28/11
Point to Point TSR 74593923GES-Port Charlotte generator to Orlando Utilities Commission / Facilities Study / 11/30/10
Point to Point TSR 74722710 SOCO to FPL / System Impact Study / 01/10/11
Point to Point TSR 74911388FPL to Florida Keys / System Impact Study / 01/28/11
Point to Point TSR 75261120 GES-Port Charlotte generator to Orlando Utilities Commission / Facilities Study / 04/26/11
Point to Point TSR 75582004 SOCO to FPL / System Impact Study
Facilities Study / 07/1/11
10/11/11
Point to Point TSR 7561627675692184 SOCO to Orlando Utilities Commission / System Impact Study
Facilities Study
Facilities Re-Study / 08/16/11
10/31/11
01/17/12
Designation of NetworkResource–PortEverglades TSR 75730449 / System Impact Study
Facilities Study / 09/15/11
12/09/11
Designation of Network Resource– Palatka, FL TSR 75730570 / System Impact Study
Facilities Study / 09/22/11
12/12/11
Designation of Network Resource– Hendry County, FL TSR 75815887 / System Impact Study / 09/28/11
Point to Point TSR 76066421 Oleander Plant to Tampa Electric Company / System Impact Study / 11/21/11
Point to Point TSR 76336553 JEAS to OUC / System Impact Study / 02/15/12
Point to Point TSR 76336730 SOCO to OUC / System Impact Study / 02/15/12
Point to Point TSR 76337785 SOCO to NSB / System Impact Study
Facilities Study / 02/17/12
06/01/12
Point to Point TSR 76337787 SOCO to NSB / System Impact Study
Facilities Study / 02/17/12
06/01/12
Point to Point TSR 76337788 SOCO to FPC / System Impact Study / 02/17/12
Point to Point TSR 76337791 SOCO to TEC / System Impact Study / 02/17/12
Designation of Network Resource-Sanford Unit 4
TSR 76882332 / System Impact Study
Facilities Study / 08/24/12
11/26/12
Designation of Network Resource-Sanford Unit 5
TSR 76897774 / System Impact Study
Facilities Study / 08/24/12
11/26/12
Designation of Network Resource-Desoto County Generation Units 1&2 to Seminole Load in FPL BA – TSRs 78986397 and 79027904 / System Impact Study / 3/24/14
For those with OATI OASIS certificates, additional information is available from the FRCC
For copies of a study, please contact one of the following:
Edgard Arroyo(305)
Charles Knight(305)
Luke Whiting(305)
Studies will be provided at a nominal prepaid handling fee of $100.00
[1]Other studies pursuant to Generation Interconnection Requests are listed on the FPL Generation Queue Priority of Generation Interconnection Requests document, included on the OASIS in the FPL OATT Documents folder.