Anticipated City of Salem Construction Projects

(Spring 2015 through Winter 2016)

Project Name / Project Scope / Estimated Bid Timing or Contract Award
WATER
Forest Hills Waterline Replacement Package / Replacement of 1,900 linear feet of 2-inch and 6-inch waterline with new 8-inch ductile iron pipe. / Winter 2016
STORM
Campbell / Cranston Pipeline Replacement / Replacement of 1,300 linear feet of deteriorated 12-inch pipe with new 12-inch pipe. / Winter 2016
Broadway ST NE Pipeline Replacement / Replacement of 460 linear feet of deteriorated 8-inch pipe with new 10-inch pipe. / Winter 2016
WASTEWATER
Chester AV Pipeline Replacement / Replacement of 640 linear feet of 8-inch pipe with new 15-inch pipe. / Winter 2016
TRANSPORTATION
Commercial Street SE at Kuebler BLVD Intersection Widening / Widening for dual left-turn lanes on all four approaches at this intersection. Work also includes a new right turn lane from southbound Commercial St SE to westbound Kuebler Blvd SE and replacement of the existing traffic signal. / Winter 2016
25TH Street SE at Madrona AV SE Intersection Improvements / Improvements to realign the intersection so that the north leg of 25th Street SE will connect directly to Madrona Avenue SE to form an arterial route; realign 25th St SE to connect as a south leg of the intersection; and add travel lanes to Madrona Ave SE. 22nd St SE will be extended from its current ending point southeasterly to Madrona Ave SE. / Winter 2016
Kuebler BLVD SE Eastbound Widening / Widening to add an additional through lane eastbound, right turn lanes eastbound at the Battle Creek Rd SE and 27th St SE intersections, a right turn lane westbound at the 27th St SE intersection, and dual left turn lanes from westbound Kuebler Blvd SE to 27th St SE. Improvements would also include bike lanes, sidewalks, and drainage facilities. / Winter 2016
FACILITIES
Construction Waste Processing and Transfer Center (CWPTC) / The facility includes a decant building, drying building, septage receiving facility, construction material storage area, storm water rain gardens, instrumentation and controls, security system, site landscaping and paving. / Bid Opening: 5/19/15
Eola Ridge Park and Stormwater Bacteria Retrofit Project / Initial construction of a neighborhood park with additional improvement to an existing detention pond to provide for additional water quality treatment. / Bid Opening: 6/2/15