National GreenhouseandEnergyReporting(Measurement)Amendment(Energy)Determination2017
I, Josh Frydenberg, Minister for the Environment and Energy, make the followingdetermination.
Dated2017
JoshFrydenberg[DRAFTONLY—NOTFOR SIGNATURE]
MinisterfortheEnvironmentand Energy
Contents
1
Name1
2Commencement...... 1
3Authority...... 1
4Schedules...... 1
Schedule1—Amendments2
NationalGreenhouseandEnergyReporting (Measurement)Determination20082
NationalGreenhouse andEnergyReporting (Measurement) Amendment (Energy)i
Determination2017
1Name
Thisinstrument isthe NationalGreenhouseandEnergyReporting(Measurement)Amendment(Energy)Determination2017.
2Commencement
(1)Each provision ofthisinstrumentspecifiedin column 1 of thetablecommences,or istakento havecommenced,inaccordancewithcolumn 2 of thetable. Anyotherstatementincolumn 2has effectaccordingto itsterms.
CommencementinformationColumn1 / Column2 / Column3
Provisions / Commencement / Date/Details
1.The wholeofthisinstrument / 1July2017. / 1July2017
Note:This table relates onlytotheprovisionsofthisinstrumentasoriginally made. It willnotbe amendedto dealwithanylateramendments ofthisinstrument.
(2)Anyinformationincolumn 3 ofthetableis notpartofthisinstrument.Informationmay be inserted inthiscolumn, or information initmay be edited, inanypublishedversionofthisinstrument.
3Authority
Thisinstrument is madeundersubsection10(3) oftheNationalGreenhouseandEnergy ReportingAct2007.
4Schedules
Each instrumentthatisspecifiedin aSchedule tothisinstrumentisamended orrepealed assetoutintheapplicableitems inthe Scheduleconcerned, andanyotheritemin a Scheduletothisinstrumenthaseffectaccordingtoitsterms.
Schedule1—Amendments
NationalGreenhouse andEnergyReporting(Measurement)Determination2008
1Paragraph6.2(1)(a)
Omit“solid or gaseousfuel”,substitute“solidfuel,gaseousfuel,sulphur,uraniumorhydrogen”.
2Subsection6.3(1)
After“(fuel)”,insert“,otherthansulphur,uraniumor hydrogen,”.
3Atthe end of section6.3
Add:
Sulphur,uranium orhydrogen
(3) Theenergycontentof sulphur,uraniumor hydrogenproducedfromtheoperationofthefacilityduringthe yearis worked outusingthefollowingformula:
ZQEC
where:
EC is theenergycontentfactorofsulphur,uraniumorhydrogen(whicheverisapplicable)mentionedin Part 7 of Schedule 1, measured in gigajoulespertonne.
Qis thequantityofsulphur,uraniumor hydrogen(whicheverisapplicable)producedduringtheyearandmeasuredintonnes.
Zisthe energycontentofsulphur,uraniumor hydrogen(whicheverisapplicable)producedduringthe year and measuredingigajoules.
4Subsection6.5(1)
After“(fuel)”,insert“,otherthansulphur,uraniumor hydrogen,”.
5Subsection6.5(1)(subparagraphs(a)(i),(b)(i) and (d)(i) and (ii) ofthedefinition of EC1)
Omit“orPart7”.
6Atthe end of section6.5
Add:
Sulphur,uraniumorhydrogen
(4) Theenergycontentofsulphur,uraniumor hydrogenconsumed fromtheoperationofthefacilityduringthe yearis worked outusingthefollowingformula:
ZQEC
where:
EC is theenergycontentfactorofsulphur,uraniumorhydrogen(whicheverisapplicable)mentionedin Part7 ofSchedule 1, measured in gigajoulespertonne.
Qis thequantityofsulphur,uraniumor hydrogen(whicheverisapplicable)consumedduringthe yearandmeasuredintonnes.
Zisthe energycontentofsulphur,uraniumor hydrogen(whicheverisapplicable)consumedduringthe year and measuredingigajoules.
7Atthe end of subsection7.1(1)
Add“, orthelossofelectricityfroman electricitytransmissionnetworkordistributionnetwork”.
8Subsection7.1(3)
Repeal thesubsection(notincludingthenote).
9Section7.2(heading)
Repeal theheading,substitute:
7.2Method1—purchaseand loss ofelectricityfrom mainelectricity gridinaState or Territory
10Subsection7.2(1)(definition of Q)
Omit“, subjectto subsection(2),”.
11Subsection7.2(2)
Repealthesubsection,substitute:
(1A) Themethod insubsection(1)must,subjecttosubsection(2),alsobeusedforestimatingscope2 emissionsreleasedfromelectricityconsumed fromtheoperationofa facilityduringa yearifthe operationofthefacilityis constitutedbyan electricitytransmissionnetworkor distributionnetworkthatis, oris partof, themainelectricitygridin a StateorTerritory.
(2) Inapplyingthatmethodforthe purposesofsubsection(1A),Qisthequantityofelectricity lossesforthat networkduringthe year.
12Section7.3(heading)
Repeal theheading,substitute:
7.3Method1—purchaseand loss ofelectricityfromother sources
13Subsection7.3(1)(definition ofQ)
Omit“, subjectto subsection(2),”.
14Subsection7.3(2)
Repeal thesubsection,substitute:
(1A) Theformulainsubsection(1)must,subjecttosubsection(2),alsobeusedforestimatingscope2 emissionsreleasedfromelectricityconsumed fromtheoperationoffacilityduringa yeariftheoperation ofthefacilityis constituted byan electricitytransmissionnetworkordistributionnetworkthatis not,and isnotpartof,the mainelectricitygrid in aStateorTerritory.
(2) Inapplyingthatformulaforthe purposesofsubsection(1A),Qisthequantityofelectricitylossesfor thatnetworkduringthe year.
15Schedule1 (notetothe heading)
Omit“, 6.5(1)”,substitute“and(3),6.5(1) and(4)”.
16Part 6 ofSchedule1 (table)
Repeal thetable,substitute:
Indirect(scope2)emissionsfactorsfromconsumptionofpurchasedelectricityfromgridItem / Column1
State,Territoryorgriddescription / Column2Emissionfactor
kgCO2-e/kWh
77 / NewSouthWalesandAustralianCapitalTerritory
78 / Victoria
79 / Queensland
80 / SouthAustralia
81 / SouthWestInterconnectedSysteminWesternAustralia
82 / Tasmania
83 / NorthernTerritory
[Data in column 2 will reflect annual update of scope 2 emissions factors based onchanges within the NationalElectricity Market inthe last financialyear.
17Part 7 ofSchedule1 (heading)
Repeal theheading,substitute:
Part7—Energycommodities
18Part 7 ofSchedule1 (table, columnheading“Fuel”)
Repeal theheading,substitute:
Energycommodity
19Inthe appropriateposition in Chapter9
Insert:
9.10Amendmentsmade by the National Greenhouseand EnergyReporting(Measurement)Amendment(Energy)Determination2017
Theamendmentsmade bytheNationalGreenhouseandEnergyReporting(Measurement)Amendment(Energy)Determination2017applyin relationto:
(a)thefinancialyearstartingon 1 July2017;and
(b)laterfinancialyears.