PROPOSAL SCHEDULE /
ITEM NO. / ITEM / APPROX.
QUANTITY / UNIT / UNIT PRICE / AMOUNT /
202.0420 /

Removal of Existing Traffic Signs

/ L.S. / L.S. / L.S. / $______
203.0100 /

Roadway Excavation

/ 95 / C.Y. / $ ______/ $______
206.2020 / Structure Excavation for Drainage System / L.S. / L.S. / L.S. / $______
209.0100 / Installation, Maintenance, Monitoring, and Removal of BMP / L.S. / L.S. / L.S. / $______
209.0200 / Additional Water Pollution, Dust, and Erosion Control / F.A. / F.A. / F.A. / $ 50,000.00
312.0100 / Plant Mix Glassphalt Concrete Base Course / L.S. / L.S. / L.S. / $______
401.0400 / Asphalt Concrete Pavement Mix No. IV / L.S. / L.S. / L.S. / $______
401.0500 / Leveling Course / 500 / Ton / $ ______/ $______
507.7610 / Type “A” Upgrade End Post / L.S. / L.S. / L.S. / $______
604.2342 / Type 61614 Steel Grates / 10 / Each. / $ ______/ $______
604.4010 / Adjusting Water Valve Box Frame and Covers / 7 / Each / $ ______/ $______
606.3110 / Guardrail Type 3 – Single with Steel Post / L.S. / L.S. / L.S. / $______
613.0300 / Adjusting Centerline and Reference Survey Monuments / 6 / Each / $ ______/ $______
631.5300 / Regulatory and Warning Sign (Greater than 10 Square Feet) with Posts / L.S. / L.S. / L.S. / $______
629.1010 / 4-Inch Pavement Striping (Tape, Type I or Thermoplastic Extrusion) / L.S. / L.S. / L.S. / $______
629.2010 / Type A Pavement Markers / L.S. / L.S. / L.S. / $______
643.0100 / Maintenance of Existing Landscape Areas / F.A. / F.A. / F.A. / $ 50,000.00
645.1000 / Traffic Control / L.S. / L.S. / L.S. / $______
645.2000 / Additional Police Officers And/or Additional Control Device / F.A. / F.A. / F.A. / $ 50,000.00
648.0100 / Field-Posted Drawings / L.S. / L.S. / L.S. / $______
698.0100 / Training / 2,000 / Hours / $0.80 / $ 1,600.00
699.1000 / Mobilization (Not to Exceed 610 Percent of the Sum of All Items Excluding the Bid Price of this Item, Field Office, Project Site Laboratory, Allowances, Furnishing Drilled Shaft Drilling Equipment, and Force Account Items) / L.S. / L.S. / L.S. / $______
a. Sum of All Items ………………………………………………………………………………………….
b. Either Furnish Foreign Steel Not to Exceed Minimal Amount (Fill in ‘0’) or
Furnish Foreign Steel in Excess of Minimal Amount (Fill in 25% x a) ………………………………
c. Amount for Comparison of Bids (a + b) …………………………………………………………………

All bidders must fill in b and complete c

NOTE: Bidders must complete all unit prices and amounts. Failure to do so may be grounds for rejection of bid. / $
$
$

(Project No.)

10/03/11

P-8