Pneumatics and Hydraulic control / Mechatronic system

Dr.Krit Jiamjiroch

Programmable Logic Controller.

A Programmable Logic Controller, PLC or is a kind of single board controller used for automation of electromechanical processes, such as control of machinery on car assembly lines, canning and food process. Unlike general-purpose computers, the PLC is designed for multiple inputs and output arrangements, add in temperature module etc. Programs to control machine operation are typically stored in a non-volatile memory. A PLC is an example of a hard real-time system since output results must be produced in response to input conditions within a limited time, otherwise unintended operation will result.

OMRON CP1L - High Performing Programmable Controller with Embedded Ethernet

1. Hardware

There are some factors that you may consider before that you are going to install PLC into your systems; for example: number of Input/output, memory and interfacial ports or communication. For example, Figure A shows a HDMI of a Recycling carbon fibre process. For this rig, we have to list the number of temperature measurements points and other inputs. After the list is provided, it was end-up with 10 points of temperature measurement position, 10 points of the analogue inputs, 10 points of digital input and 8 points of digital output.

Figure A Recycling process by a Fluidised bed

2. Software

There are nowadays a lot manufacturers provided the PLC on a Market, for example OMRON, Mitsubishi, Semen and Allen-Bradley. These maker are provided their own software; hence, software or interfacial language is one of the most factors before buy a controller. In the fact that these software are trended to accept the same general language but they may have many different details, give you an headache. Thus, a number of engineers often goes for their familiar PLC brands if they have choices.

3. OMRON PLC

OMRON is one of the Japanese electronic compartment company. There are many products under this brand like relay, switch and sensors and PLC. At the Thammasat University, we teach several Brand like a Semen, Brake and OMRON; however, OMRON is accepted as a good one for start as it can obtainable on Thai market and inexpensive model. The specification of this PLC is shown in Table A and B

Specification for OMRON PLC

4. Ladder Diagram

One of the famous interface language for PLC is a ladder diagram, similarity like a relay and switch in a circuit. This language is a symbolic language; thus, you just only drag and drop the components into a working area.For Ladder diagram, it seems like a ladder that composed at least one rung. Rung is just a memory line that would contain many contacts and output coil or other kind of instructions.

Contact Coil Instructions

The classical example for the ladder may be single line with one contact and one coil as show in figure below.

It seems that the concept of this ladder diagram may similar as an electrical diagram.

10000 = 00000 or not 000001

Interlocking

W000 = (00000 or w0000) and not 000002

First, we have to initiate a PLC. It can see that CP1L is a CPU and its connection is USB port as shown in Figure A.

Figure A

Figure B

AC motor

If you have been looking at the terminal box of the 3 phases motor, the terminal may labelswith U1,V1,W1 and U2,V2,W2. These Ux Yx Wx terminals may reference to the different phases of coil inside the motor. According to table 1, it shows the identical symbol for the difference phases based on its geographic area. So, in order to match the generator to the 3 phases motor may follow this table. In this case, for 3 phase motors thereare 6 terminal with 3 phases power supplies so that there are (3P6) possibilities to matching these motor with its power supplies.

Table 1

Although, it could be start motor as following the connections based on table, the motor will turn in certain direction. In this case, the motor may go in forward direction (ccw) but what is happen if you connect these motor the wrong sequences.

STAR-Delta Start

It seems that it could not directly start 3 phases AC motor with more than 5kW capacity because the motor would be high current consumption. The peak current may roughly 5-7 times of the normal operating current for the same motor. Hence, the start-delta technique may apply for this circumstances.