ALABAMA ENGINEERING FORMS

NO. / NAME OF FORM / DATE / CROSS
REFERENCE
A / Emergency Spillway Performance Report / 6/99 / NEM 504, AL504-8(5)
1 / Alabama Engineering Job Approval Authority / 4/02 / NEM 501, AL501-12(5)
AEFDM, 11-12b - Dams and Structures
2 / Earth Fill Pond Plan / 2/04 / Pond – CPS
AEFDM, 11-16a
3 / Plan of Pond (Farm) / 5/81 / Pond – CPS
4 / CANCELLED 4-1-97. AEF(D)M NOTICE AL-13 [Pond Design Data (Class I & II Only)]
4A / Pond Design Data (All Classes of Ponds) / 2/04 / Pond – CPS
AEFDM, 11-14
AL-ENG-34
5 / Pond Construction Check Data / 9/99 / Pond – CPS
AEFDM, 11-19
6 / Dug Pond Design Data / 9/99 / Pond – CPS
AEFDM, 11-64
AL-ENG-32A
AL-ENG-33
7 / Plan of Excavated Pond / 8/99 / Pond – CPS
AEFDM, 11-67
8 / Drainage Ditch Design / 9/99 / AEFDM, 14-58
9 / Diversion Design / 2/04 / Diversion – CPS
AEFDM, 9-35
AL-ENG-41
10 / Irrigation Design and Specification Data Sheet / 11/99 / Irrigation Water Management – CPS
NEM 523, AL523-2(3)
11 / Gully Control Structure / 5/81 / NONE
11A / Grade Stabilization Structure / 1/96 / Grade Stabilization Structure – CPS
AEFDM, 10-24
12 / Spring or Seep Development / 7/01 / Spring Development - CPS
Guide Sheet AL 574
AEFDM Chapt. 12
NEM Part 560, Chapt. 12
13 / Spot Check Report / 11/95 / NONE
14 / Route Slip - Engineers / 9/03 / NONE
14-1 / CANCELLED 1-23-04. Farm Drainage Design and Plan.
15 / CANCELLED 4-23-03. Work Sheet for Detention Discharge for Pond
16 / Waterway Design / 2/04 / Grassed Waterway – CPS
AEFDM, 7-25
AL-ENG-39
17 / Location Sketch / 9/99 / AEFDM, 11-14, 11-64,
and 14-73
18 / CANCELLED 1-23-04. Tile Drain Plan
18A / Subsurface Tile Drain Design / 9/99 / Subsurface Drain – CPS
AEFDM, 14-73
19 / Location Plan for Drain System / 11/00 / Subsurface Drain – CPS
AEFDM, 14-79
20 / None
21 / Design of Underground Outlet / 9/99 / Underground Outlet – CPS
AEFDM, 8-27, 8-45, and 8-46
AL-ENG-40
22 / Title Page / 9/99 / AEFDM, 10-23
23 / Dam Classification or Reclassification for Alabama / 7/02 / NEM 503, AL503-12(9)
24 / Watershed Structure Inspection Report
5-Year Engineering ( ) Annual O&M ( ) / 1/04 / NEM 503, AL503-12(11)
25A / CANCELLEDJanuary 2003 - Waste Management System Agreement And Certification. See General Manual (AL409-20) Exhibit AL4. 180-GM, Suppl. AL3.
25B / Design Data Sheet Waste Treatment Lagoon/Waste Storage Pond (PDF) / 6/81 / NONE
25C / Plan of Disposal Lagoon (PDF) / 6/81 / NONE
25D / CANCELLED 1-23-04. Worksheet to Estimate Land Area at Waste Disposal Site (PDF).
25E / Worksheet to Determine Land Area Requirements for Poultry Wastes & Litter Storage Requirements / 7/01 / Nutrient Management – CPS
Poultry Workbook
Section II & IV
25F / Worksheet to Determine Size of Dead Bird Composter/Incinerator / 7/01 / Composting Facility – CPS
Incinerator - CPS
Poultry Workbook
Section II & IV
25G / Poultry Manure Dry Stack Structure
Design Worksheet (Three open sides) / 7/01 / Waste Storage Facility – CPS
Poultry Workbook, Section II
25H / Poultry Manure Dry Stack Structure
Design Worksheet (Three Walls) / 7/01 / Waste Storage Facility – CPS
Poultry Workbook, Section II & IV
25I / Worksheet to Determine Volume of Litter Fed to Cattle / 7/01 / Poultry Workbook, Section II & IV
25J / Compost Records / 6/01 / Composting Facility – CPS
Poultry Workbook, Section II
25K / Construction Checklist for Litter Storage/Composter Buildings / 3/96 / Composting Facility – CPS
Waste Storage Facility – CPS
Poultry Workbook, Section II
25L / Design Dimension Worksheet for Dry Manure and and Dead Bird Composting Barn / 2/93 / Composting Facility – CPS
Waste Storage Facility – CPS
Poultry Workbook, Section II & IV
26 / Waste Management System / 8/96 / NONE
27 / Application for Technical Assistance for the Design and of a Dam and Reservoir or Embankment Type Structure / 6/99 / Pond – CPS
NEM 501, AL501-12(13)
27A / Application for Technical Assistance for the Design of a Pond Associated with an Aquaculture Farming Operation / 6/99 / Pond – CPS
NEM 501, AL501-12(15)
28 / CANCELLED - 4-23-03. Peak Runoff Computation Worksheet
29 / Construction Contractor List / 6/99 / NEM 505, AL505-6(5)
30 / CANCELLED - 1-23-04. Structural Data Dams and Grade Control
31 / CANCELLED - 1-23-04. Structural Data Channels
32 / Farm Pond (Excavated) Data Sheet / 6/88 / AEFDM, 11-69
32A / Excavation Pond Plan / 6/88 / AL-ENG-6
33 / Farm Pond Data Sheet / 8/85 / AEFDM, 11-17
AL-ENG-6
34 / Farm Pond (Embankment) Data Sheet / 2/04 / Pond – Code 378
AL-ENG-4A
35 / Farm Pond (Embankment) Data Sheet / 7/88 / NONE
36 / Construction Practice Installation Reporting Statement / 7/88 / NONE
37 / Contractor's Reporting Statement Ponds and Other Practices / 7/88 / NONE
38 / CANCELLED 1-23-04. Contractor's Reporting Statement Surface and Subsurface Drainage
39 / Waterway Data Sheet / 6/88 / AL-ENG-16
40 / Design and Layout of Storage Terraces / 6/88 / AL-ENG-21
41 / Diversion Data Sheet / 6/88 / AL-ENG-9
42 / Alabama NRCS Dams Inventory / 1/00 / NEM 520, AL520-10(3)
43 / Stream Crossing (Ford) - Geotextile and Stone / 12/02 / Stream Crossing - CPS
44 / Stream Crossing (Ford) - "Geocell" / 7/95 / Stream Crossing - CPS
45 / Well Decommissioning Drilled, Driven, or Bored Wells / 5/97 / NONE
45a / Well Decommissioning, Dug Wells / 5/97 / Well Decommissioning - CPS
46 / Water and Sediment Control Basin / 1/96 / Water and SedimentControlBasin – CPS
AEFDM, 10-28
47 / Electrified Flood Gate at Stream Crossing / 7/99 / Stream Crossing - CPS
48 / Pond Watering Ramp / 12/99 / Heavy Use Area Protection – CPS
NONE
49 / Stream Watering Ramp / 12/99 / Heavy Use Area Protection - CPS
50 / Spill Prevention, Control, and Countermeasures Plan For Animal Feeding Operations (Secondary containment required around tanks.) / 11/02 / NONE
51 / Spill Prevention, Control, and Countermeasures Plan For Animal Feeding Operations (No secondary containment required around tanks.) / 11/02 / NONE
52 / Waste Storage Pond (WSP) and Waste Treatment
Lagoon (WTL) Evaluation / 5/01 / Waste Storage Facility – CPS
Waste Treatment Lagoon - CPS
53 / Dry Hydrant Profile / 1/02 / Dry Hydrant - CPS
54 / Livestock Shade Structure / 10/01 / Livestock Shade Structure – CPS
55 / Compaction Test - Drive Cylinder Method / 4/02 / NONE