BIDDING LIST SEASONAL WINTER PROVISIONS

The items listed below must always be included in the bidding list. For tendering in individual trade contracts, the points should be distributed on the or those contractors who need to include the items in their bid.

This bidding list relates to Value-Creating Construction Process´ guidance 'Payment of Winter Provisions, Sept. 2012'. It recommended that the guidelines in the manual are always followed

Bidder:
Name:
Address:
Phone no.:
Project
Description:
Contract:
Tender Documents:
Bid
All reservations and deviations must be specified under point ”Reservation”
The specification of bids and all unit prices must be completed for the bid toconform.
The following revision page (s) has been received - marked no.:
Main Bid:
The undersigned hereby offers to execute the above contract in accordance with the circular on Fixed Time and Price, excl. VAT, with the services necessary for the full implementation of the contract according to the issued tender documents and invitation to tender, dated: ______
Total Bid, kr.
Write, kr.
to be delivered in accordance with the aforementioned tender documents
Place / Date
Bidder´s signature

Work to be performed in connection with seasonal winter provisions:

Pos. 1Building site provisions / kr.
Pos. 2Provisions in connection with soil and sewage works / kr.
Pos. 3Provisions in connection withconcrete works / kr.
Pos. 4Provisions in connection withmasonry works / kr.
Pos. 5Provisions in connection with roofing works / kr.
Pos.6Provisions in connection with indoor works / kr.
Total, pos. 1-6, excl.VAT
to be transferred the bidding list´s page 2 / kr.
Bank Information:
Sub Contractors:
Reservations:
Deviations from the tender documents:
Pos. / Item / Quantity / Unit / Unit Price / Total, Kr
Pos. 1 Building site provisions
1.1 / Drainage of surface water / kr.
1.2 / Outdoor orientation and workplace lighting (including on scaffolding and roof) / kr.
1.3 / Protection of materials against precipitation / kr.
1.4 / Repairing weather damaged traffic areas and material storage sites / kr.
1.5 / Establishment of winter conditional temporary roads. / kr.
1.6 / Frost protection of water installations / kr.
1.7 / Wind shielding and covering of workplaces / kr.
Pos. 1 Total, to be transferred to the bidding list page 3 / kr.
Pos. / Item / Quantity / Unit / Unit Price / Total, Kr
Pos. 2 Provisions in connection with soil and sewage works
2.1 / Securing the backfill soil from precipitation (rain and snow, etc.) / kr.
Pos. 2 Total, to be transferred to the bidding list page 3 / kr.
Pos. / Item / Quantity / Unit / Unit Price / Total, Kr
Pos. 3Provisions in connection withconcrete works
3.1 / Provisions to ensure concrete surfaces (from precipitation / drying) / kr.
Pos. 3 Total, to be transferred to the bidding list page 3 / kr.
Pos. / Item / Quantity / Unit / Unit Price / Total, Kr
Pos. 4Provisions in connection withmasonry works
4.1 / Provisions against the brickwork, blockwork and the like getting wet. / kr.
4.2 / Coverage and / or protection of newly
constructed masonry from rain
Pos. 4 Total, to be transferred to the bidding list page 3 / kr.
Pos. / Item / Quantity / Unit / Unit Price / Total, Kr
Pos. 5Provisions in connection with roofing works
5.1 / There is no seasonal items to be include in bid / kr.
Pos. 5 Total, to be transferred to the bidding list page 3 / kr.
Pos. / Item / Quantity / Unit / Unit Price / Total, Kr
Pos.6 Provisions in connection with indoor works
6.1 / Temporary sealing of story partitions and/or roof construction against water penetration, cold and heat loss / kr.
6.2 / Drainage of rain and snowmelt / kr.
6.3 / Closing the facade openings / kr.
Pos. 5 Total, to be transferred to the bidding list page 3 / kr.