MONITORING SHEET ATR Status as on 27.2.2009

DELHI DEVELOPMENT AUTHORITY
UTTIPEC, 2ND FLOOR, VIKAS MINAR, ITO,NEW DELHI
TELE. FAX. 23379043
Email:
AAUI ROAMING AMBASSADORS COMPLAINTS/OBSERVATION RECIVED AND
FORWARDED BY WORKING GROUP- IV(UTTIPEC) TO ROAD OWNING AGENCIES.
S.No. / Name / Date of complaint / Brief Description of complaint / Date of discussion WG-IV of UTTIPEC meeting. / Forwarded to / Date / ATR Status
Yes/No / Action Taken / Remarks
1 / Mr. D K Bindra / 10.11.08 / Press Enclave Road close to Sheikh Sarai Ph-II
….Red Light Pole missing
/ Received in WG-IV meeting held on 18.12.2008. / Delhi Traffic Police on
3.2.09 / ATR pending from DTP
2. / Mr. Ramesh Grover / 12.12.08 / Defence Colony and CGO Complex…. Poor condition of Subways / Received in WG-IV meeting held on 06.01.2009. / PWD on
6.1.09 / Yes / Subway cleaned and lights are in working condition / As per PWD, ATR submitted on 6.2.09 by Dir.(Maint.)PWD The matter pertains to DIMTS.
2. Regarding Okhla Ph. I, area is not specified.
3. / Mr. Mahendra Raj / 12.12.08 / Prithviraj Road ….. Bad Pedestrian Walk Ways / Received in WG-IV meeting held on 06.01.2009 / NDMC on
6.1.09 / Yes / (a)The repairs to the damaged footpath of Prithviraj Road have been carried out. However the whole footpath has been taken up for improvement in the Pavement Improvement Plan.
(b)Tenders have been issued and date of receipt of tender is 03 Mar.’09.
(c)The work is expected to complete within 06 months of award of work.
The photographs of Prithivaj Road .
4. / Mr. S Chandersekhar / 13.12.08 / Bhikaji Cama Place &
Nand Vithi Road … Loose/Broken wires
/ Received in WG-IV meeting held on 06.01.2009 / MCD &
PWD on
6.1.09 / ATR pending / For Nand Vithi Rd. PWD has conveyed that location is not clear.
S.No. / Name / Date of complaint / Brief Description of complaint / Date of discussion WG-IV of UTTIPEC meeting. / Forwarded to / Date / ATR Status
Yes/No / Action Taken / Remarks
5. / Mr. RajivSikri / 13.12.08 / a) Aurobindo Marg …. Badly planned divider is the
U' turn on Aurobindo Marg just after the AIIMS
flyover (between AIIMS and Yusuf Sarai)
b) Delhi Gurgaon Road -- No warning signs to
indicate that there is a concrete divider in road.
C) Mathura Road, Ring Road crossing at Ashram chowk & Shanti Path/Ring road crossing at Moti Bagh, the crossing of Tito marg, Aurbindo Marg, Africa Avenue with Outer ring Road
….At major crossings where there is a heavy traffic volume turning right, there must be separate traffic signals…..
/ Received in WG-IV meeting held on 06.01.2009 / NDMC
6.1.09
NHAI on
16.2.09
PWD on 06.01.2009 / Yes
ATR pending / (a)The divider (split rotary) on Aurobindo Marg just after AIIMS flyover (between AIIMS & Yusuf Sarai) was constructed by PWD during the construction of AIIMS flyover between 2003-2005. The split rotary has not been handed over by PWD to NDMC & is being maintained by them.
(b)The photographs of divider.
As can be seen from the photographs due to limited space available in Right of Way of Road it is no feasible to widen the divider (‘U’ turn).
S.No. / Name / Date of complaint / Brief Description of complaint / Date of discussion WG-IV of UTTIPEC meeting. / Forwarded to / Date / ATR Status
Yes/No / Action Taken / Remarks
6. / Mr. Hari Dang Padmashree / 5.12.08 / East Delhi/Raj Ghad/Delh/NCR/Toll Plazas/Boarder
Posts/Check Points/Expressways …. Bad Road
conditions in above quoted areas.
/ Received in WG-IV meeting held on 06.01.2009 / PWD on
6.1.09 / Yes / Specified points are not mentioned. Most of the roads are in good condition i.e Rajghat..
7. / Mr. Jagjyoti Jain / 29.11.08 / a) Naraina Under Pass- No light in Subway near
Border Roads Organisation
b) Rajouri Garden Ring Road facing Madhav Park
….Verge is wrong place.
c) Rajouri Garden Ring Road Near Pedestrian
Bridge … Verge closed by stop light still operate.
/ Received in WG-IV meeting held on 08.12.2009 / PWD on
10.12.08
PWD on
10.12.08
Delhi Traffic Police on
10.12.08 / Pending / Yes
Yes / As conveyed by PWD during the WG-IV meeting held on 13.2.09, action has been taken
8. / Mr. N.K. Sethi / 2.12.08
3.12.08 / a) Mathura Road & Jangpura Extn. (Hospital Road)
… Traffic Jam
b) Outer Ring Road & Nehru Place(Hemkunt
Tower) …..Traffic Jam
/ Received in WG-IV meeting held on 08.12.2008. / Delhi Traffic Police on
10.12.08
Delhi Traffic Police on
10.12.08 / Pending
Pending / Matter pertains to DTP
Matter does not pertains to Engg. Deptt., MCD
9. / Mr. A.V. Anand / 5.11.08 / Portion of Outer Ring Road from opposite site of
Savitri Cinema, G.K.-II & Outer Ring Road towards
Panchsheel … Open manhole covers & worn
out road surface.
/ Received in WG-IV meeting held on 06.01.2009 / PWD on
6.1.09 / Yes / Tender has been called.
S.No. / Name / Date of complaint / Brief Description of complaint / Date of discussion WG-IV of UTTIPEC meeting. / Forwarded to / Date / ATR Status
Yes/No / Action Taken / Remarks
10. / Mr. T.K. Malhotra / 3.12.08 / Pavement opp. PVR Saket (main road) & Qutab
Institutional Area…. Wholly encroached by Dhabas,
PCO, Kiosk, Fruit Walla, Barber, Shoe Maker,
Paan stalls and even Police Booth.
/ Received in WG-IV meeting held on 18.12.2008. / Engineer in Chief
PWD & Engg.
in Chief MCD on
22.12.08
/ Pending
/ Matter pertains to Licensing Deptt. of South Zone.
11. / Mr. T.K. Malhotra / 3.12.08 / Junction at PVR Saket Chowk -- Traffic Signal
Problems.
/ Received in WG-IV meeting held on 18.12.2008. / Delhi Traffic Police on
22.12.08 / Pending / Matter pertains to Delhi Traffic Police.
12. / Mr. T.K. Malhotra / 3.12.08 / Opp. PVR Saket -- over the nalla in the vicinity
of the OBC Bank
/ Received in WG-IV meeting held on 18.12.2008. / PWD/Horticulture(Tree Prunning) on
22.12.08 / PWD to co-ordinate with Horticulture.
13. / Mr. T.K. Malhotra / 13.12.08 / Lajpat Nagar Central Market (Main Road) …. Three
line parking
/ Received in WG-IV meeting held on 18.12.2008 and 13.02.2009 / Delhi Traffic Police on
22.12.08 and 13.02.2009. / Matter pertains to ADC(R.P. Cell ) & Delhi Traffic Police / Traffic Police to coordinate with ADC(R.P. Cell)
14. / Mrs. Veni Mathur / 19.12.08 / Intersection at Hauz Khas on Aurobindo Marg / Received in WG-IV meeting held on 06.01.2009 / PWD on
6.1.09 / Yes / Being attended. Work shall be completed on 28.2.09. PWD
15. / Mrs. Saroja Vaidyanathan / 5.12.08 / a) Baba Ganganath Marg Road (going towards
Munirka from Aruna Asaf Ali Road) … Manholes
Open
b) Same side of Kendriya Vidyaleye & Khajansingh
Swimming Academy building Opposite to NIH &
FW building … Broken Platforms
/ Received in WG-IV meeting held on 08.12.2008. / PWD on
10.12.08
PWD on
10.12.08 / Yes / Work shall be completed on 28.2.09 (As ATR PWD)
S.No. / Name / Date of complaint / Brief Description of complaint / Date of discussion WG-IV of UTTIPEC meeting. / Forwarded to / Date / ATR Status
Yes/No / Action Taken / Remarks
16. / Mr. T.K. Malhotra / 5.1.09 / Mehrauli-Badarpur Road in front of Anupam
Apartments (Saket) … 'U' turn construction left
incomplete.
/ Received in WG-IV meeting held on 06.01.2009 / PWD on
6.1.09 / Yes / Work will be completed by PWD28.2.09 with permission of Delhi Traffic Police.
17. / Mr. Sunil Gujral / 05-01-09 / (a)Mehrauli Badarpur Road, U Turn opposite to Saidulajab forest.
The road has been broken since the rains and is a nuisance as well as hazard for all traffic taking a ‘U’ Turn.
Action required: Repair of Road.
(b)Traffic Signal on MB Road opp to Asiana Market.
Since the light was installed over a year back, its been non-functional putting to risk traffic from all sides.
Action required: Fix the traffic signal.
(c)Traffic signal on MB Road & BRT cross-section.
No ‘U’ Turn option whereby all traffic towards Sainik Farms has with the traffic coming from other end.
Action required: Provide a ‘U’ Turn option at the Red Light. / Received in WG-IV meeting held on 13.02.2008.
Received in WG-IV meeting held on 13.02.2009.
Received in WG-IV meeting held on 13.02.2009. / PWD on 13.02.2009
Delhi Traffic Police on 13.02.2009
PWD on 13.02.2009
S.No. / Name / Date of complaint / Brief Description of complaint / Date of discussion WG-IV of UTTIPEC meeting. / Forwarded to / Date / ATR Status
Yes/No / Action Taken / Remarks
18 / Mrs. Arundhati Kotwal / 29-01-09 / Central Delhi, Karol Bagh Area.
Broken road in Central Delhi, Karol Bagh area. It was broken to replace the old sewage lines two months back. The sewage lines have been replaced but the new road has not been laid.
The exact location is the road leading from Khalsa College, Dev Nagar to Satnagar (Radha Swami Satsang). Entire half side of the road is broken.
Action required: Action required by concerned authorities. / Received in WG-IV meeting held on 13.02.2009. / MCD/ DJB on 13.02.2009
19. / Mrs. Veni Mathur / 6.2.2009 / Hauz Khas
I. Encroachment of public land by Shopkeepers in Hauz Khas
About 75% of the 8 ft. wide, covered passages (Government Land) meant for walking in front of the shops have been encroached upon, by extending the shops to the end of the colonnade. The people have to walk in the heat and rain while shopping at Hauz Khas E-Block Market and G-Block Market. The shopkeepers even display their goods on the road, forcing the public to walk in the middle of the road, hampering the movement of vehicles.
On the sides of the entrance to the central park of the main market – unauthorized, temporary constructions have been erected like juice stall, magazine walas, fruit and vegetable vendors, flower shops, etc. – leaving no area to walk or parking the cars.
Action required: The encroachment – marked with YELLOW – once removed will ensure smooth traffic as well as safety of people, especially elderly citizens in the market area.
II. Construction of Commercial establishment in the Green Belt Area
  1. Construction in the Green Belt Area as shown in the Master Plan between Kaushalya Park and Padmini Enclave,
R-Block Hauz Khas, Pan vendors, tea vendors, Dhabas, stock of building material, vegetable vendor, PCOs have
come up in convenience of local authorities.
  1. Connecting road between house numbers G-13 and G-12A Hauz Khas have been blocked and converted into a shop.
  1. Side road blocking – By the side of MD International Inn on Aurobindo Marg the side road has been blocked and being used as private parking, thus hampering the flow of traffic at the intersection.
Action required: Once the constructed wall is broken down, a smooth traffic flow plan can be put in operation reducing traffic jams near the G-Block market intersection. / Received in WG-IV meeting held on 13.02.2009. / MCD on 13.02.2009
S.No. / Name / Date of complaint / Brief Description of complaint / Date of discussion WG-IV of UTTIPEC meeting. / Forwarded to / Date / ATR Status
Yes/No / Action Taken / Remarks
20 / Mr. T K Malhotra / 07-02-2009 / Sarvodaya Enclave, South Delhi
The roads are badly fractured and are full of potholes. When driving smoothly these potholes cause a sudden jolt leading to mishaps, which the residents have been witnessing for more than a year.
Action required: Repairs of the potholes and re-carpeting of the road is urgently required. / Received in WG-IV meeting held on 13.02.2009. / MCD on 13.02.2009