Revised Application Documentation: Version 5 /22 May, 2015

QUALIFICATION FILE – CONTACT DETAILS OF SUBMITTING BODY

Name and address of submitting body:

Construction Skill Development Council of India

Address:- 204, Aashirwad Complex, D-1, Green Park, New Delhi - 110016

Tel: +91-11-46584466

Name and contact details of individual dealing with the submission

Name: Ms. Jancy Mathew

Position in the organisation: Head Standards and Research

Address if different from above:

Same as above

Tel number(s): +91-11-46584466

E-mail address:

List of documents submitted in support of the Qualifications File

1.  Career Map Of Interior & Exterior Finishes Occupation - Annexure 1

2.  QP CON/Q1105- Annexure 2

3.  RPL Assessment Guideline/Policy-Annexure 3

4.  Detailed Assessment Plan - Annexure 4

5.  Workshop Interaction – Annexure 5


QUALIFICATION FILE SUMMARY

Qualification Title / Doors & Windows Fixer - QP CON/Q1105
Body/bodies which will assess candidates / ·  MCG
·  Star Projects
·  Stamp
·  India Skills
Body/bodies which will award the certificate for the qualification. / CSDCI
Body which will accredit providers to offer the qualification. / CSDCI
Occupation(s) to which the qualification gives access / Interior & Exterior Finishes
Proposed level of the qualification in the NSQF. / 3
Anticipated volume of training/learning required to complete the qualification. / 400 hrs
Entry requirements / recommendations. / Preferably 5th standard
Progression from the qualification. / Furniture Carpenter L-4
Planned arrangements for RPL. / Work is under progress
International Comparability / Comparable with UK Standard and Australia Standard
INDIAN NOS / Comparable UK/Australia NOS
CON/N1111: Carry out preparatory works and fix frames and sub-frames for fixing doors and window / Comparable UK NOS:
COSVR05: Install frames and linings
CON/N1112:Install wooden /PVC doors /windows as per instructions / Comparable UK NOS:
PROFI9: Install window and door units
Comparable Australia NOS:
MSFGG3016 - Fabricate and install residential windows and doors
CON/N1113: Install pre-fabricated sliding doors and windows / Comparable UK NOS:
PROFI9: Install window and door units
Comparable Australia NOS:
MSFGG3016 - Fabricate and install residential windows and doors
CON/N1114: Install aluminium doors and windows with glass glazing / Comparable UK NOS:
PROFIS8: Install glass and/or panels into windows and doors
Comparable Australia NOS:
MSFGG3016 - Fabricate and install residential windows and doors
CON/N1115: Install hardware and accessories on doors and windows / Comparable UK NOS:
PROFI9: Install window and door units
Comparable Australia NOS:
MSFGG3016 - Fabricate and install residential windows and doors
CON/N8001: Work effectively in a team to deliver desired results at the workplace / Comparable UK NOS
COSVR642 :Conform to productive work practices
CON/N8002: Plan and organize work to meet expected outcomes / Comparable UK NOS:
COSVR702:Plan work activities and resources to meet work requirements
CON/N9001: Work according to personal health, safety and environment protocol at construction site / Comparable UK NOS:
COSVR641: Conform to general workplace health, safety and welfare
Formal structure of the qualification
Title of unit or other component
(include any identification code used) / Mandatory/ Optional / Estimated size (learning hours) / Level
CON/N1111: Carry out preparatory works and fix frames and sub-frames for fixing doors and window / Mandatory / 48 / 3
CON/N1112:Install wooden /PVC doors /windows as per instructions / Mandatory / 56 / 3
CON/N1113: Install pre-fabricated sliding doors and windows / Mandatory / 56 / 3
CON/N1114: Install aluminium doors and windows with glass glazing / Mandatory / 56 / 3
CON/N1115: Install hardware and accessories on doors and windows / Mandatory / 48 / 3
CON/N8001: Work effectively in a team to deliver desired results at the workplace / Mandatory / 24 / 3
CON/N8002: Plan and organize work to meet expected outcomes / Mandatory / 16 / 3
CON/N9001: Work according to personal health, safety and environment protocol at construction site / Mandatory / 48 / 3

Please attach any document giving further detail about the structure of the qualification – eg a Curriculum or Qualification Pack.

Give details of the document here:

1.  QP CON/Q1105- Annexure 2

SECTION 1

ASSESSMENT

Name of assessment body:
If there will be more than one assessment body for this qualification, give details.
·  MCG
·  Star Projects
·  Stamp
·  India Skills
Will the assessment body be responsible for RPL assessment?
Give details of how RPL assessment for the qualification will be carried out and quality assured.
The RPL assessment will be carried out through screening at the initial level and identifying the skills gap and then need based training will be provided to the candidates. Assessment will be carried out by the CSDCI approved assessment body.
Detailed note is attached as Annexure-3
Describe the overall assessment strategy and specific arrangements which have been put in place to ensure that assessment is always valid, consistent and fair and show that these are in line with the requirements of the NSQF:
Assessment is carried out through CSDCI affiliated Assessment Body only. The Assessors are trained & certified by CSDCI through Training of Assessors program. The TOA assessment programme involves two processes. The first process is gathering the evidence of the domain competency of individuals based on domain skills assessments. The second part of the assessment process is the judgement of his platform skills.
The assessment plan contains the following information:
·  What will be assessed, i.e. the competency based on each NOS
·  methods of assessments and its duration –skill & knowledge assessments
context of the assessment (workplace/simulation)
·  The criteria for decision making will guide judgements.
·  To ensure assessment is always consistent and fair, a standard assessment criteria developed by CSDCI will be shared with affiliated AB’s. The assessment tools developed by AB’s within this assessment criteria framework duly vetted by CSDCI will be used for skill and knowledge assessments of trainees
Detailed Note is Attached as Annexure-4

Please attach any documents giving further information about assessment and/or RPL.

Give details of the document(s) here:

1. RPL Assessment Guideline/Policy-Annexure 3

2. Detailed Assessment Plan- Annexure 4

ASSESSMENT EVIDENCE

Complete the following grid for each grouping of NOS, assessment unit or other component as per the assessment criteria. Insert the required number of rows.

CRITERIAFORASSESSMENTOFTRAINEES
Doors & Windows Fixer
CON/Q1105
Construction Skill Development Council Of India

GuidelinesforAssessment
1.  Criteria for assessment for each Qualification Pack will be created by the Sector Skill Council. Each Performance Criteria (PC) will be assigned marks proportional to its importance in NOS. SSC will also lay down proportion of marks for Theory and Skills Practical for each PC.
2.  The assessment for the knowledge part will be based on knowledge bank of questions created by Assessment Bodies subject to approval by SSC
3.  Individual assessment agencies will create unique question papers for knowledge/theory part for assessment of candidates as per assessment criteria given below
4.  Individual assessment agencies will create unique evaluations for skill practical for every student at each examination/training center based on assessment criteria.
5.  The passing percentage for each QP will be 50%. To pass the Qualification Pack, every trainee should score a minimum of 50% individually in each NOS
6.  The Assessor shall check the final outcome of the practices while evaluating the steps performed to achieve the final outcome.
7.  The trainee shall be provided with a chance to repeat the test to correct his procedures in case of improper performance, with a deduction of marks for each iteration.
8.  After the certain number of iteration as decided by SSC the trainee is marked as fail, scoring zero marks for the procedure for the practical activity.
9.  In case of successfully passing only certain number of NOS's, the trainee is eligible to take subsequent assessment on the balance NOS's to pass the Qualification Pack within the specified timeframe set by SSC.
10.  Minimum duration of Assessment of each QP shall be of 4hrs/trainee.
Marks Allocation
Assessable Outcome / Assessment criteria / Total Marks / Out Of / Theory / Practical Skills
CON/N1111: Carry out preparatory works and fix frames and sub-frames for fixing doors and window / PC1. select and organize required tools and equipments for fixing doors and windows / 100 / 5 / 1.5 / 3.5
PC2. measure the dimensions of the door/window frame to ensure correct size of frame / 5 / 1.5 / 3.5
PC3. measure out space for the window in the walls or roof as per drawings/specifications / 5 / 1.5 / 3.5
PC4. verify dimensions of the opening are as per the size of the frame / 5 / 1.5 / 3.5
PC5. carry out chipping ,chiseling of masonry structure to provide gaps for fitting frame / 10 / 3 / 7
PC6. select the correct door/window panel as per approved drawings / 5 / 1.5 / 3.5
PC7. visually check any surface damage before installation / 5 / 1.5 / 3.5
PC8. fit flashing to window surround as per applicability / 5 / 1.5 / 3.5
PC9. mark the underside of the wall or roof directly above the outline on the floor using a line / 5 / 1.5 / 3.5
PC10. align the door/window frame against the setting out lines, datum lines and level pegs / 5 / 1.5 / 3.5
PC11. secure the frame using timber wedges and adjust the position of wedges to obtain required vertical and horizontal alignment / 5 / 1.5 / 3.5
PC12. ensure proper alignment and verify the under-cut dimensions before fastening the hinges / 5 / 1.5 / 3.5
PC13. coat the surface of frame and sub frame with anti-splitting agent prior to installation. / 5 / 1.5 / 3.5
PC14. fasten the frame in position using appropriate wall plugs or galvanizedstraps / 5 / 1.5 / 3.5
PC15. verify the dimensions of sub frame opening as per applicability / 5 / 1.5 / 3.5
PC16. apply appropriate bonding agent over the sub frame and main frame / 5 / 1.5 / 3.5
PC17. install the main frame over the sub frame and check the alignment of main frame and sub frame as per applicability / 10 / 3 / 7
PC18. secure the main frame over sub frame using nails/screws as per specification / 5 / 1.5 / 3.5
Total / 100 / 30 / 70
CON/N1112:
Install wooden /PVC doors /windows as per instructions / PC1. Install the door/window frame and sub-frame as per specification / 100 / 5 / 1.5 / 3.5
PC2. Install the door/window panel as per specification / 5 / 1.5 / 3.5
PC3. Ensure proper alignment and verify the under-cut dimensions before fastening the hinges / 10 / 3 / 7
PC4. Ensure a consistent gap between door/window panel and door/window frame / 5 / 1.5 / 3.5
PC5. Check and ensure the right type of decorative moulding is used for installation / 10 / 3 / 7
PC6. Apply bonding agent to the underside of the architrave(decorative moulding) as per instructions / 5 / 1.5 / 3.5
PC7. Install the decorative moulding around the door/window frame as per specification. / 10 / 3 / 7
PC8. Ensure the miter joints are flat and square at corners for seamless finish / 5 / 1.5 / 3.5
PC9. Ensure proper swinging of doors after hinging / 5 / 1.5 / 3.5
PC10. Check that an even contact has been created between the door/window face and the weather stripping attached to the frame / 10 / 3 / 7
PC11. Insulate around the door/window frame usingfiberglass insulationor low expansion foam as per applicability / 10 / 3 / 7
PC12. Install theinterior trim as per specifications / 10 / 3 / 7
PC13. Ensure caulking of all joints of the trimand brick mold / 5 / 1.5 / 3.5
PC14. Install the weather strip at the base of the door/window as per instructions / 5 / 1.5 / 3.5
Total / 100 / 30 / 70
CON/N 1113:
Install pre fabricated sliding doors and windows / PC1. apply flexible waterproof flashing to the sides of bare wall surfaces along the frames as per applicability / 100 / 5 / 1.5 / 3.5
PC2. ensure that frame should be plumb, square and not twisted between the openings / 5 / 1.5 / 3.5
PC3. install sliding door frame or pocket wall frame as per specification for sliding doors/windows fixing / 10 / 3 / 7
PC4. visually check any surface damage before installation / 5 / 1.5 / 3.5
PC5. ensure proper alignment and verify the under-cut dimensions prior to installing doors/window panels / 5 / 1.5 / 3.5
PC6. fit the sliding door into the frame and check that it glides well and is parallel to the frame sides / 5 / 1.5 / 3.5
PC7. adjust the rollers under the sliding panel if necessary / 5 / 1.5 / 3.5
PC8. assemble main frame at site as per size requirement / 5 / 1.5 / 3.5
PC9. install vertical parts of main frame using appropriate bonding agent. / 5 / 1.5 / 3.5
PC10. fasten horizontal parts of frame after fixing and drying of vertical parts / 5 / 1.5 / 3.5
PC11. caulk between the siding and the frame (or brick moulding) as per applicability / 5 / 1.5 / 3.5
PC12. install the decorative moulding around the door/window frame as per specification / 5 / 1.5 / 3.5
PC13. ensure the miter joints are flat and square at corners / 5 / 1.5 / 3.5
PC14. check that an even contact has been created between the door/window face and the weather stripping attached to the frame / 5 / 1.5 / 3.5
PC15. caulk between the siding and the frame (or brick moulding) as per applicability / 5 / 1.5 / 3.5
PC16. insulate around the door/window frame usingfiberglass insulationor low expansion foam as per applicability / 5 / 1.5 / 3.5
PC17. install theinterior trim as per specification / 5 / 1.5 / 3.5
PC18. ensure caulking of all joints of the trimand brick mold / 5 / 1.5 / 3.5
PC19. install the weather strip at the base of the door/window as per instructions / 5 / 1.5 / 3.5
Total / 100 / 30 / 70
CON/N 1114:
Install aluminum doors and windows with glass glazing / PC1. Apply flexible waterproof flashing to the sides of bare wall surfaces along the frames as per applicability / 100 / 5 / 1.5 / 3.5
PC2. Ensure that frame should be plumb, square and not twisted between the openings / 5 / 1.5 / 3.5