To, Dated: 25.05.2012
Additional Director(S)
Ministry Of Environment and forests,
Northern Regional Office,
Chandigarh.
Subject: Six monthly Progress report/Information as desired by the office.
Ref:Your letter no. F.No.5-258/2010-RoP(NS)/816 dated 04/05/2012
MoEF’s letter No. J-11011/33/2010-IA.II(I) dated 01.06.2010
Sir,
Our project M/Infinity Laboratories Private Limited at Village: Behra, Gulabgarh Behra Road, PO: Rampur Sainian,Tehsil: Derabassi, Distt: Mohali, Punjab was accorded environmental clearance by Ministry of Environment and forests, New Delhi on 01.06.2010 as per letter no. J-11011/33/2010-IA-II(I).As desired by you Please find below the progress report point wise.
- Name and address of the project in charge
Mr. A.K.Mittal, Director
Mobile: 09888036622,
Email:
Fax: Not available
Address: H.No. 1080, Sector-12 A, Panchkula.
- Due to certain unavoidable reasons and new 1st generation entrepreneur plus due to global recession the plant could not start production till December 2011. Following are the production figures from December onwards:
December 2011 = 750 kgs
January 2012 = 1060 kgs
February 2012 = 1200 kgs
March 2012 = 2000 kgs
April 2012 = 1050 kgs
- Company has installed following measures for air and water pollution control measures.
For Air pollution control:
- 30 Meters height stack chimney both for boiler and Incinerator
- Dust collector and cyclone filter in boiler.
- Proper stack for DG Set.
- Heat exchangers for all distillation reactors to avoid any vapor losses.
- Filters in return duct of HVAC systems to avoid dust particle going out.
For Water Pollution control:
- Full MEE Plant with Oil & Grease trap , Equalization tank(2.0 lacs lts), Clarifier, Tube settler are provided before MEE and concentrate residue are passed through sludge drying bed and filtrates got back to equalization tank and dried sludge is incinerated in incinerator.
- Separate biological treatment plant for low TDS and domestic effluent with clarifier, tube settler, SAFF reactor, chlorine dosing system, Pressure sand filter and Activated carbon filter and collection tank from where it is pumped to cooling towers and gardening.
- In process the research is on to reduce consumption of water and recovery of maximum solvents towards waste minimization measures.
- Yes there is separate high TDS and low TDS Effluent lines
- ETP Photographs are enclosed in CD.
- Yes MEE has been commissioned and photos are attached in CD.
- Company has got approval for storage of solid and hazardous waste and photo of room is enclosed in CD and a copy of approval is attached.
- Company has membership of Nimbua Greenfield society at Nimbua, Derabassi and a copy is enclosed for reference.
- Company has planted around 500 trees of picus along side boundary wall and as erection work was there now company will plant more trees in coming months.
- Company has got both consents for water and Air for 6 months and now we have applied for renewal of the same to Punjab pollution control board.
- Company has got permission for running transformer, DG sets and HT cables for energy/power from chief electrical inspector, Punjab.
- All effluent lines, domestic sewage lines, recycle/reuse lines has already been installed.
- Company has installed new silent and green with very low smoke DG for backup power demand.
- All reactors, centrifuges, Driers, Agitated nutch filters, Multimills, blenders, sifters, Flame proof electrical fittings etc. are erected and commissioned.
- All types of Storage rooms like engineering goods storage, Raw material storage, FG storage, are complete.
- Lab instruments are being erected and will be completed by end June 2011.
- Incinerator has been installed and photograph is enclosed in CD.
- Environment Management cell has been developed with Mr. J K Saxena being in charge of the cell.
- Ambient air quality monitoring will be started from next month and data will be provided.
- Please find attached medical report of 2-3 employees as sample for your reference.(Medical report attached)
- Paid up capital of the industry as on date is 3.61 crores and 1.75 crores as share application money which will be allotted in due course of time.
- As the approach road is under municipal committee so no land is coming under forest conservation act 1980. NOC from PWD has been obtained for getting approach to factory from main road.
S. No / Items / Expenditure details till date / Proposed budget estimates for next two years
Recurring
(in Rs.)
Running expenses / Non – recurring (in Rs.)
(Capital expenses) / Recurring
(in Rs.) / Non – recurring
(in Rs.)
a. / APCM / 1.5 lacs / 15.0 lacs / 10.0 lacs / 5.0 lacs
b. / ETP / 3.5 lacs / 45.0 lacs / 15.0 lacs / 10.0 lacs
c. / Monitoring / 0.89 lacs / 0.75 lacs / 5.0 lacs / 3.0 lacs
d. / Occupational health surveillance / 1.5 lacs / 1.0 lac / 2.5 lacs / 2.0 lacs
e. / Rain Water harvesting / 1.0 lacs / 3.0 lacs / 2.0 lacs / 5.0 lacs
f. / Green belt / 0.55 lacs / 1.2 lacs / 2.0 lacs / 3.0 lacs
g. / Establishment of SWP / 2.0 lacs / 10 lacs / 5.0 lacs / 5.0 lacs
h. / Safety Training to workers / 0.5 lacs / 0.8 lac / 2.0 lacs / 3.0 lacs
Total / 11.44 lacs / 76.75 lacs / 43.5 lacs / 36.0 lacs
Hope you will find the above in order and any further information required will be provided immediately. The letter is also being submitted in CD as soft copy also as desired.
With best Regards
For Infinity Laboratories Private Limited,
(Anil Kumar Mittal)
Director
Ministry of Environment & Forests
Northern Regional Office
Chandigarh
DATA SHEET
1. / Project Type: / Industry Projects2. / Name of the Project : / Infinity Laboratories Private Limited
3. / Clearance letter (s)/ O.M. No. & dates: / J-11011/33/2010-IA.II(I)
dated 01.06.2010
4. / Location :
a) District (s)
b) State (s)
c) Latitudes/Longitudes / S.A.S. Nagar
Punjab
5. / Address for correspondence : / House No. 1080
Sector – 12 A
Panchkula, Haryana
6. / Salient features :
a) of the project
b) of the environmental
management plans / Already provided to the office
7. / Breakup of the project area
a) Submergence area :
Forest and Non-forest.
b) Others / Non - Forest
8. / Break up of project affected population with enumeration of those losing houses/dwelling units only, agricultural land only both dwelling units and agricultural land and landless laborer artisans.
a) SC/ST/Adivasis
b) Others
(Please indicate whether these figures are based on any scientific and systematic survey carried out or only provisional figures. If a survey has been carried out give details and year of survey ) / N.A
9. / Financial details :
a) Project cost as originally planned and subsequent revised estimates and the year of price reference.
b) Allocations made for environmental management plans with item wise and year wise break up.
c) Benefit cost ratio/Internal Rate of Return and the year of assessment.
d) Whether (c) includes the cost of environmental management as shown in b) above
e) Actual expenditure incurred on the project so far
f) Actual expenditure incurred on the environmental management plans so far: / 9.5 crores in 2011-2012
Project successfully commissioned
Provided in column above
To be done
Will be provided after doing the actual estimates.
9.67 crores till date
Around 1.0 crore till date
10. / Forest land requirement:
a) The status of approval for diversion of forest land for non-forestry use.
b) the status of clear felling.
c) the status of compensatory afforestation programme in the light of actual field experience so far. / No land is under forest Act.
11. / The status of clear felling in non-forest areas (such as submergence area of reservoir approach road) if any, with quantitative information. / NA
12. / Status of construction :-
a) Date of commencement (actual and / or planned)
b) Date of completion (actual and / or planned) / December, 2010
March/April, 2012
13. / Reasons for the delay it the project is yet to start. / Due to bank loans delay, PPCB consents delay and then delay in power connection by six months.