Alternate NSPS PERMIT TO CONSTRUCT
Comment Information
Please submit any comments or questions on the following permit applications to Shannon Heafey at :
Gaylord National Resort and Convention Center- application received for 3natural gas fired, nonemergency engines each rated at 2000kW (2682 hp) equipped with an SCR. The proposed installation will be located at 201 Waterfront Street, Oxon Hill, MD 20745. The comment period will expire on January 15, 2017.
Doctors Community Hospital- application received for 2 natural gas-fired, non-emergency generators, each rated at 600kW (804HP) and equipped with Selective Catalytic Reduction emissions control. The proposed installation will be located at 8118 Good Luck Road, Lanham, MD, 20706. The comment period will expire on December 21, 2016.
University of Maryland- Baltimore Health Sciences Facility III- application received for two natural gas fired, nonemergency generators, each rated at 2000kW (2826HP). The proposed installation will be located at 225 North Penn Street, Baltimore, MD. The comment period will expire on December 3, 2016.
Peninsula Regional Medical Center- application for 2 natural gas fired non-emergency generators, each rated at 2176hp (1560kW) equipped with oxidation catalyst. The proposed installation will be located at 100 East Carroll Street, Salisbury, MD. The comment period will expire on November 29, 2016.
Valley Proteins, Inc - Baltimore Division- application received for 1 Cleaver Brooks multi-fuel fired (Natural Gas/No. 2 oil, used cooking oil) boiler rated at 29.3 mmbtu /hr heat input. The proposed installation will be located at 1515 Open Street, Baltimore, MD 21226. The comment period will expire on November 18, 2016.
U. S. Department of Energy-Germantown Facility- application received for the installation of four dual-fuel (natural gas and no. 2 fuel oil) fired boilers, three of which are rated at 14.71 mmBtu/hr and one rated at 5.25 mmBtu/hr. The proposed installation will be located at 19901 Germantown Road, Germantown, MD 20874. The comment period will expire on September 23, 2016.
ColdspringRenewables, LLC- application received on February 29, 2016 for the installation of an anaerobic digester system using cow manure to produce biogas. The biogas will be used for fueling one reciprocating internal combustion engine/generator rated at 400kW (536bhp) to produce electricity for onsite consumption. The installation will be located at 3901-B Hawks Hill Road, New Windsor, MD 20776. The comment period will expire on August 19, 2016.
Page 1 of 2