4T08
Completion Certificate Proformas
For NEC, FIDIC, JBCC & GCC contracts
To:(The Contractor) / To:
(The Employer)
Contract person: / Contract person:
Address: / Address:
Telephone: / Telephone:
Fax: / Fax:
Attention: / Attention:
Contract no:
Contract title:
Insert appropriate wording depending upon which form of contract is utilized. (Delete options that are not required).
1NEC Engineering and Construction Contract (NEC ECC2)
DEFECTS CERTIFICATEday / month / year
Completion achieved on:
The end of the last defects correction period is:
The defects date is:
This Defects Certificate Date is :
(at the later of the defects date or the end of the last defects correction period)
Defect reference / List of Defects modified before the defects date which the Contractor has not corrected
(or if there are no such Defects, a statement that there are none.)
Works checked by:
......
Signature:Name:Date:
Certified by the Supervisor:
......
Signature:Name:Date:
2NEC Engineering and Construction Short Contract. (ECSC)
DEFECTS CERTIFICATEday / month / year
Completion achieved on:
The end of the last defects correction period is:
The defects date is:
This Defects Certificate Date is :
(at the later of the defects date or the end of the last defects correction period)
Defect reference / List of Defects modified before the defects date which the Contractor has not corrected
(or if there are no such Defects, a statement that there are none.)
Certified by the Employer:
......
Signature:Name:Date:
3FIDIC Conditions of Contract for Construction (Red Book)
PERFORMANCE CERTIFICATEIt is hereby certified that Contractor is considered to have completed all obligations in terms of clause 11 of the FIDIC Conditions of Contract for Construction on ......
......
Signature:Name:Date:
Engineer
4FIDIC Conditions of Contract for Plant and Design (Yellow Book)
PERFORMANCE CERTIFICATEIt is hereby certified that Contractor is considered to have completed all obligations in terms of clause 11 of the FIDIC Conditions of Contract for Pant and Design on ......
......
Signature:Name:Date:
Engineer
5FIDIC Conditions of contract for EPC Turnkey Projects (Silver Book)
PERFORMANCE CERTIFICATEIt is hereby certified that Contractor is considered to have completed all obligations in terms of clause 11 of the FIDIC Conditions of Contract for EPC Turnkey Projects on ......
......
Signature:Name:Date:
Employer
6JBCCPrincipalBuilding Agreement
CERTIFICATE OF FINAL COMPLETIONIt is hereby certified that the abovementioned works have in terms of clause 26 of the JBCC Principal Building Agreement reached final completion on ......
......
Signature:Name:Date:
Principal Agent
7JBCC Minor Works Agreement
CERTIFICATE OF FINAL COMPLETIONIt is hereby certified that the abovementioned works have in terms of clause 10 of the JBCC Minor Works Agreement reached practical completion on ......
......
Signature:Name:Date:
Agent
8General Conditions of Contract for Construction Works (2004)
Final Approval CertificateIt is hereby certified that in accordance with the provisions of clause 52of the General Conditions of Contract, that the abovementioned works have been completed and all defects have been corrected in accordance with the provisions of the Contract.
Certified by the Engineer:
......
Signature:Name:Date:
4T08 Completion Certificate Proformas for NEC,FIDIC,JBCC & GCC v4-0 1