Afghanistan National Horticulture Development Organization (ANHDO)
Horticulture Value Chain Project (HVP)
Construction of 3 Underground cellars in Khulm district of Balkh Province
Requestfor Quotations
(RFQ) #001-2017
Pilot demonstration of enhanced Post-harvest management systems and market driven value chain development for pomegranate
27- September2017
Closing Date &Time: MondayOctober,7, 2017, 09:00 AM
1
Dear Sir/Madam,
ANHDO hereby solicits a quotation for the construction of 3 Underground Cellars in Khulm district of Balkh Province with the following specifications:
No. / Description / Quantity / Unit M31 / Excavation / 409 / M3
2 / Backfilling with compaction / 107.3 / M3
3 / Boulder for ground level / 27.5 / M3
4 / Stone masonry / 21.12 / M3
5 / RCC Concrete for Foundations, Columns, Beams, and Slabs.(M:200) / 32.5 / M3
6 / PCC, Concrete for Grounds and Roof (M:150) / 17 / M3
7 / Steel Bars required for RCC, ɸ=14, ɸ=12 & ɸ=8 / 2.54 / Ton
8 / Wires ɸ=1mm / 5 / Bundle
9 / Bricks for Walls / 20594 / NO
10 / Mortar for Stone Masonry and Brick works / 16 / M3
11 / Plastering of outside wall & Inside Roof / 230 / M2
12 / Shuttering / 162 / M2
13 / Isogam for walls, and Roof / 184
14 / Gutter for water flow slope / 10 / M
15 / Metal Door Size 2X 1.5 Meter with installation / 1 / NO
16 / PVC Windows Size 1X1.5 Meter With installation / 2 / NO
17 / Electrical Works with required equipment / 1 / Lump Sum
18 / Storage Internal wall Plaster with Kagel(کاه گل) / 1 / Lump Sum
This Request for Quotation is open to all legally-constituted construction companies that can build the requested 3 underground cellars in Khulm district of Balkh Province and have legal capacity to build through an authorized representative.
- ProjectBackground
The Afghanistan National Horticulture Development Organization (ANHDO) is a non-governmental organization registered under the laws of Afghanistan for the support and development of the perennial horticulture industry of Afghanistan.
ANHDO is implementing the Horticulture Value Chain Project (HVP)(in synergy with HPS), planned as successive support to some actions formerly implemented by the PHDP-II or to organizations formerly assisted by the PHDP-II. Hence, the HVP design has the advantage of building on the experience and outcomes in horticulture development made by the PHDP and PHDP II projects. The HVP overall objective is to “Contribute to the uplifting of horticulture (yields, quality standards, market value and enhancement of capabilities of the private sector, through specific pilot actions in target areas)”.
- Objective
The objective of this RFQ is to identify theConstruction Company who can build 3 Underground cellarsin Khulm district of Balkh province with all the above mentioned specifications. The selected vendor is expected to buildthe mentioned cellars in due date with given specifications.
- Location of the project
Khulm district of Balkh Province,
GPS coordinates:
1)36.4158° N, 67.4220° E Elevation: 440 Meter
2)36.4158° N, 67.4220° E Elevation: 440 Meter
3)36.4230° N, 67.4117° E Elevation: 430 Meter
- Questions
Questions or requests for further clarifications should be submitted in writing to the contact person below:
Name of contact person atANHDO: / Ghulam Mahboob YarzadaTel Nº: / 0093 729804133
Email address of contact person: / ,
The deadline for submission of questions is 6th,October, 2017, 09:00 AM local time.
- Content of quotations
Quotations should be submitted in a single envelope whenever possible, depending on file size. Quotations must contain:
a)The quotation should be cumulatively for three underground cellars.
b)In response to the requirements outlined in the specifications should comply with:
- The bidder shall be required to quote for all items.
c)Price quotation, to be submitted strictly in accordance with Price Quotation Form.
Quotation must be signed by the company’s relevant authority and submit in envelop to the main office of ANHDO.
- Instructions for submission
Quotation should be prepared based on the guidelines set forth in Section IV above, along with a properly filled out and signed price quotation form, are to be sent in sealed envelope (not through email)to the address indicated below, no later than 6th, October 2017, 09:00 AM Kabul local time.
Name of contact person at ANHDO: / Ghulam Mahboob YarzadaANHDO address : / Taimani Str# 9 Beside Moi Mubarak, Kabul Afghanistan • 0729804133 •
- Overview of Evaluation Process
Quotations will be evaluated based on the compliance with the technical specifications and the total cost of the goods (price quote).
Following is the evaluation criteria for the quotations received:
- Company registration with Government and submission with the RFQ
- Quality proof for the implementation of same project with other organizations.
- Bank Guarantee for the above project (10% for the awarded company).
- Official bank account details.
- Inclusion of 2% Government tax in the quotation.
- As per Afghanistan Central Bank policy the quotation should be on local currency (Afs).
- All these three underground cellar should be started on the same time.
- The project handover should be within one month.
- Award
ANHDO shall award the project to the companywith the lowest price and quality bidder whose bid has been determined to be sustainable with the bidding documents.
- Payment Terms
- ANHDO payment terms are based on the completion and appraisal of work in the field.
- Payment should be based on to the Bank transfer or chique.
- Zero Tolerance
ANHDO has adopted a zero-tolerance policy on gifts and hospitality. The construction companies are therefore requested not to send gifts or offer hospitality to ANHDO staff.
1
PRICE QUOTATION FORMName of Bidder:
Date of the quotation:
Request for quotation Nº: / 001- 2017
Currency of quotation: / AFN
Validity of quotation: / 1 Month.
No. / Description / Quantity / Unit M3 / Unit Cost / Total Amount for 1 Underground Cellar
(AFN) / Total Amount for 3 Underground cellars
(AFN)
1 / Excavation / 409 / M3
2 / Backfilling with compaction / 107.3 / M3
3 / Boulder for ground level / 27.5 / M3
4 / Stone masonry / 21.12 / M3
5 / RCC Concrete for Foundations, Columns,Beams, and Slabs.(M:200) / 32.5 / M3
6 / PCC, Concrete for Gounds and Roof (M:150) / 17 / M3
7 / Steel Bars required for RCC, ɸ=14, ɸ=12 & ɸ=8 / 2.54 / Ton
8 / Wires ɸ=1mm / 5 / Bundle
9 / Bricks for Walls / 20594 / Nos
10 / Morter for Stone Masonery and Brick works / 16 / M3
11 / Plastering of outside wall & Inside Roof / 230 / M2
12 / Shuttering / 162 / M2
13 / Isogam for walls, and Roof / 184
14 / Gutter for water flow slope / 10 / M
15 / Metal Door Size 2X 1.5 Meter with installation / 1 / Nos
16 / PVC Windows Size 1X1.5 Meter With installation / 2 / Nos
17 / Electrical Works with required equipments / 1 / Lump Sum
18 / Storage Internal wall Plaster with Kagel(کاه گل) / 1 / Lump Sum
TOTAL
1
Disclaimer
I hereby certify that the company mentioned above, which I am duly authorized to sign for, has reviewed RFQ 001-2017 including annexto the RFQ document and the responses provided by ANHDO on clarification questions from the prospective service providers. Further, the company accepts the General Conditions of Contract for ANHDO and we will abide by this quotation until it expires.
Name and Title / SignatureANNEX
Drawing of Underground Cellar
1