Weston Woods
Monthly Association Board Meeting
June 9,2015
At SavageCity Hall
Attendees: / X / Board Members / X / Jane Bizal, Vice PresidentX / Dennis Nelson, President / X / Mary Ann Wessel, Steering Committee Director
X / Tom Schammel, Buildings Director / X / Doug Rage, Secretary
X / Arlis Esnough, Treasurer / A=ABSENT
X / Thomas Thompson, Grounds Director / X=ATTENDING
I. Call to Order
The meeting was called to order by President Dennis Nelson at 7:00 P.M.
II.Special Guests:
Janet Williams (Mayor of Savage): Mayor Williams presented a basic “State of the City” overview. Her presentation included but was not limited to city development, land use, streets, taxes, schools, city staff, parks, etc. Today’s city needs include more housing and street and highway improvements. Savage currently has approximately 28,000 residents and is 17 square miles in size. The city was named after Marion Savage, the owner of the famous race horse named “Dan Patch”.
Dave Beer(Owner of “Turning Leaf”, our landscape maintenance contractor): Dave’s presentation included but was not limited to a general overview of the landscape maintenance and snow removal his company provides for the homeowners.
III.Review & Approval of Board Minutes
A motion to approve the May 12, 2015 minutes was made by Arlis Esnough, seconded by Thomas Thompson. Motion carried 7-0.
IV.President’s Report by Dennis Nelson
- Survey: The survey recently conducted was reviewedand will be posted onthe web site. There were 69 responses.
2. New Board Member: Doug Rage, the current secretary of the WWA board, is moving to Florida and is resigning as secretary effective June 30. Arnie Odefey has volunteered and will replace Doug effective July 1, 2015.
3. Request for additional security for the web site: It wassuggested that the Weston Woods web site be more secure by having a user name and password login. This process was discouraged as it would be difficult to manage.
4. Reserve Study:The Reserve Study has commenced. It will take approximately 12 weeks to finalize.
V.Financial Report by Arlis Esnough
- Review of current financial reports (Current Balance Sheet, Profit and Loss Statement. Expenses to Budget, Accounts Receivable): Arlis reviewed the reports for May 2015. Expenses are under plan for May and the September through May months of the fiscal year. This will change as repairs to landscaping and concert are finished. A motion was made by Tom Schammel and second by Thomas Thompson to approve the May 2015 financial report. Motion carried 7-0.
2. Electronic Funds Transfer of Dues: Homeowners are encouraged to sign up for this feature. The sign up form is now on the website and should be sent to P.O. Box 38, SavageMN55378 or put in the association mail box on Lake Ridge Drive.
3. HOA Due Date: Dues are due on the 1st of the month. If dues are not received by the 10th, homeowners will be assessed a $20.00 late fee.
4, CD’s: Two of our 3 CD’s have expired. Funds were transferred to the WWA savings account until such time as the interest rate on CD’s improve. The 3rdCD will also becoming due in September.
VI.Vice President Report by Jane Bizal
- Jane thanked all homeowners (attendees) for coming to the quarterly WWA meeting. There were 48 homeowners present representing 38 homes.
VII.Building Report by Tom Schammel
- See Attachment
VIII.Grounds Report by Thomas Thompson
- See Attachment
IX.Secretary's Report by Doug Rage
- Open Request(s) Review: There aresix to review. These were reviewed and are in process for resolution.
X.Steering Committee Report by Mary Ann Wessel
1.Smoke Detectors: Smoke detectors for those requesting new detector(s) will be replaced July 7 through July 11 with a schedule to follow.
2.Combining the annual night out and the annual picnic previously held at the ELC. These two evens have been merged and will be named “A Night to Unite”. The event will be August 4th. More information will follow as the date draws near.
XI.Communications Report
1)Website. Homeowners should visit the website. There have been changes to improve functionality. There is useful information on HOA rules and on vendors.
XII.Adjournment
The meeting was adjourned at 8:55 P.M.
XIII.Next Meeting
These meetings will be on the second Tuesday of each month at 7:00 P.M. at the SavageCity Hall.The next meeting will be on July14, at Savage City Hall. Homeowners are always invited to attend.
ATTACHMENTS:
DIRECTOR OF BUILDINGS ANNUAL REPORT – JUNE 9, 2015
Below is a recap of the work completed thus far during the Spring of 2015:
- The major project for this spring was to have the driveways repaired and seal-coated. In addition to the driveways that were repaired last fall, we had 4 additional driveways that needed repair this spring. Jet Black seal-coated all 106 driveways on June 8th and June 10th. The parking areas will be done June 16th.
- Earlier this spring, we had 4 more sidewalks that were stabilized and raised by Metro Concrete Raising, Inc. In addition to raising the sidewalks to the appropriate level, they also fill the void under the sidewalk. They drill small holes in the concrete and use a material that contains portland cement to help solidify the underneath portion of the sidewalk.
- Air Supplied Technologies was here on May 26 and 27 to clean 39 dryer vents. I think he did a good job as he was sure full of lint when he completed each vent. We were not lacking for lint as his bag was also full. A word of caution to homeowners is to check the next time you are drying clothes to make sure the flap at the end of the vent line is opening properly.
- Curb to Curb was here on May 18th to sweep the main roadway through the complex. He came back last week to repeat as they forgot to do the parking areas.
- ABC Construction has been out 4-5 times to do minor repair work such as repair panels under porches that were blown off this spring and also to tend to a water leak.
- Howard Nissen repaired and repainted the drop off box. It looks great!!!
- Items to be completed during the summer include: 7 additional sidewalks need to be raised. I know there are more than 7 but these are the ones in most dire need as determined by the Board on our annual walkthrough conducted on May 11th.
- It was brought to the Boards attention that the foundations need to be scraped and repainted. We have approximately 50 that need attention. We are in the process of getting a bid on this project but the $200.00 quote so far is cost prohibitive. If anyone is handy with a paint brush and would like to volunteer and lead this project let me know.
- We have 2 sidewalk repairs that need to be done and hopefully we can take care of that later this summer.
Tom Schammel
Director of Buildings
Weston Woods Association
Director of Grounds Quarterly Report June 9 2015
- LANDINGSCAPING
- The walkthrough inspection by Weston Woods Board Members conducted on May 11 2015 and the results were posted to Weston woods web site by house number. Three separate lists were made up as follows. 1. Shrubs/trees replacement list. This list of the shrubs/trees inspection on May 11 2015were 56 shrubs and 2 trees that were candidates for replacement. Another inspection on May 28 2015 was made by myself and Dave Beer (Our Lawn service provider) to verify thelist and now the list is 49 shrubs and 2 trees. The two trees could change to 1 because the three small arborvitaes that replaced a large pine tree may still have a small chance of recovery. 2. Landscaping repair requirements. Items such as retaining walls repair, top soil and rocks in areas. Repair/replacement of damaged edging. 3. Dog damage to lawn. Thanks to all Homeowners this list is smaller than last year. (only 5) Only one has not been repaired because of the death of homeowner. I think that in a short time the grass will cover the small round spots.
- Our Lawn was mowed the first time on Friday May 8 2015 and will be mowed every Friday through October weather permitting.
- Core Aeration to reduce thatch accumulation was also completed and fertilizer was applied on May 15 2015.
- IRRIGATION a. The irrigation system was turned on and checked. Repairs were made and now the system is operating well. We are still operating the water system one half on even days and one half on odd day. If anyone knows of any problems with our irrigation system please telephone my cell 612-220-8790 or send request form.
- LAND SCAPE LIGHTS
David Rugg is performing an outstanding job in maintaining our landscape lights. If anyone is having problems with landscape lights please submit a request submission on our web site and I will let Davis Rugg know.
Thomas E. Thompson
Director of Grounds
Weston Woods
Tel # cell 612-220-8790