Questionnaire CO2 Recovery System – Brewery
Please provide the following information to assist us in preparing our proposal for you:Date:
Company:
Name:Position:
Address:
Telephone:
Telefax:
E-Mail:
Capacity of plant *………………….kg CO2 / hour
*In case not decided or for check –up please complete the questions below
Annual brewery capacity……………………..hl liters/year
Annual soft drink capacity……………………..hl liters/year
Location of proposed plant (city):
Elevation at plant site:______feet (meters) above sea level
Estimate total CO2 requirements in: Previous Year ______, Current Year ______, Next Year (projected) ______
Indicate your present maximum weekly CO2 requirements:
Kindly indicate your Purpose for use of CO2 to quote complete system i.e Inplant Use + Cylinder filling etc ………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………
Brewing Data
Net size of each brew into closed fermenter: ______Barrels (U.S., IMP., etc.) or hectoliters
Daily Brew Schedule(How many brews/day?) / Total Fermentation Cycle / Blow-Off Period / Collection Period / Gravity at:
Start of fermentation:_____ Plato
End of blow-off:_____ Plato
Start of collection:_____ Plato
Finish of collection:_____ Plato
Days/Wk / M /
T
/ W / T / F / S / SSummer / Hours / Hours: / Hours:
Winter / Hours: / Hours: / Hours:
Total Brews/Wk: Summer ______Winter ______
Fermenter Operating Pressure: ______PSIG (kg/cm2) Note: Attach time vs. gravity curve if available.
If different beers and/or ales are produced regularly, specify percent of total output of each product and repeat above information for each product on a separate sheet.
CO2 pressure available for collection if different from fermenter operating pressure: ______PSIG (kg/cm2).
Utility Data
Power Voltage: ______Volts, ______Phase, ______Hertz
Control Voltage:______Volts, ______Phase, ______Hertz
Motor starting requirements: Direct on line starting up to and including ______horsepower
Wye-Delta starting ______horsepower and over
Motors: Open Drip Proof Totally Enclosed, Fan-Cooled Tropical Protection Required
Cooling water temperature:Summer _____F (C)Winter _____F (C)Wet bulb temperature: _____F (C)
Auxiliary coolant available: Glycol Brine Alcohol Water – Specify one only at _____F (C)
_____ GPM (U.S., IMP., etc.); _____ % mixture; _____ PSIG (kg/cm2 )
Plant ammonia suction pressure:_____ PSIG (kg/cm2); days steam is available per week: _____ days
Steam pressure available:Maximum _____ PSIG (kg/cm2 ); Minimum _____ PSIG (kg/cm2 )
Dry compressed air supply available:Maximum _____ PSIG (kg/cm2 ); Minimum _____ PSIG (kg/cm2 )
Indicate approximate distance from closed fermenters to proposed location of CO2 collection equipment: _____ feet (meters)
Whether Cooling Tower Is Required ______(Yes / No)
Preferable applied refrigerant for liquefying CO2 ______(R22 / R404A / NH3)
Preferable content CO2 storage tank……………. tons CO2
Preferable CO2 evaporator capacity…………………. kg CO2 /hr
Size of available building (L x W x H) mtrs.
Please submit building drawing (if Possible for submitting the layout)
Whether a Mobile Tanker is Required ______(Yes / No)
Additionally Kindly provide information for economics
1.Present price of purchased CO2/ton delivered:......
2.Present CO2 source:......
3.Present cost of electricity:...... High/generators/KWH
4.Present cost of water:......
Indicate if CO2 is to be used in the beverage industry (i.e.: soft drinks, etc.):
Please send the completed questionnaire to:
Gulati Industrial Fab (P) Ltd.
1404 Chiranjiv Towers
43 Nehru Place
New Delhi 110019
India
Ph - +91-11-26447075, 76, 51608246
Fax - +91-11-2642647 /+91-129-5066707
Email: ;