PREMIER POOLS CONSTRUCTION
EXCAVATION 2/1/11
Base Dig for Rancho Cordova Office$XXXX per day + $X per sq. ft. past 400
Base Dig for Satellite Office$XXXX per day + $X per sq. ft. past 400
Attached Spa or grotto$XXX
Detached Spa$XXX
Spa Only$XXXX
Extra Grading or Layout after form/pre-site$XXX per hr
Rock/Hard Soil Charge$XXXX per day
Walk out over 100’$X per foot
Clean drive way or access over 20’ $XXX per hour
Stand By Charge$XXX per hour
Dirt on Site Credit ($XXX)
Deep end ramp$XXX
Vanishing Edge$XXX
Pool Cover Box$XXX
Extra Skimmer or Leaf Cannister$XX each
Extra Fence Removal(after 1 sections)$XX each
Pool Depth $XX per 6” past 6’
All Raised Bond Beam $X per Ln. ft.
Wing Walls with footings $X per Ln. ft.
Waterline Notched Beam (12” to 18”)$X per Ln. ft.
Concrete Removal$X per ft.
Concrete Removal w/ Steel$X per ft.
Trash Haul Each Load$XXX
Tree/Stump Removal = Grading Time + Trash Haul
Gravel Pack + Labor$XXX
Gravel $XX per yard
PREMIER POOLS CONSTRUCTION
STEEL 2/1/11
Swimming Pool Steel$XX.XX per perimeter ft.
6” Fountain wall (up to 8’)$XXX.XX
6” Fountain wall (after 8’) $XX per ft.
12” Spa Wall (up to 8’)$XXX
12” Spa Wall (after 8’)$XX per ft.
Total Bench footage after 8’ $X.XX per ft.
Ledge$XXX + $X per sq.ft. after 50
Beach$XXX
Raised Bond Beam or Wing Walls (per ln. ft.)
6” to 12”$X per ft.
18” to 24”$X per ft.
30” to 36”$X per ft.
(Add $1.00 per foot if notched for flagstone)
Footings for Block/Gunite Wall Outside of Pool$X.XX per ft.
Depth charge after 6’ 6” $XXper additional ft.
Under 12” Notched Beam $X per ft.
12 to 18” Waterline Notched Beam$X per ft.
Vanish Edge Dam Wall w/ keyway$XX per ft.
Pool Cover Box $XX per ft.
Extra Skimmer $XX ea.
Barstool $XXX ea. (must have In-Floor)
Raised Columns $XXX ea.
Waterfall Pad $XX
Custom water fall pads $XX per ft.
Deep Ramp $XXX
Free Standing Wall Schedule (Single Curtain) $X per ft.
Free Standing Wall Schedule (Double Curtain)$XX per ft.
Steel for Deck Steps$X per ft.
Commercial Recessed Steps $XX per set
Steel for Deck 12” on Center $X.XX per sq ft.
Gunite Slides Off Contract/Bid Only
Additional Labor (Engineering, Keyways, Etc.$XX per hour
PREMIER POOLS CONSTRUCTION
ROUGH PLUMBING 2/1/11
Base Pool Plumbing$XXXX
(Includes 300’ total pipe, 1 main drain, 1 skimmer, 1 pump, 1 filter)
Base Pool-Spa Combo Plumbing$XXXX
(Includes 400’ total pipe, 4 jets, 2 main drains, air loop)
Base Spa Only Plumbing$XXXX
(Includes 100’ total pipe, 4 jets, 2 main drains, air loop)
Floor Cleaning System
Set Water Valve (labor only)$XXX
Set Leaf Canister$XX
Paramount Equipment(See Equip.)
Additional Plumbing Footage$X.XX per ft.
Copper Line (Serrano)$X per ft
Solar Conduit Run$X.XX per ft
Additional Jandy valves not included in base $XX
P.V.B. or R.P.P. valve (Davis/Roseville/Lincoln)$XXX
Check valves/Non Jandy Valves$XX
Gas Line 1st 30’$XXX
Additional Gas Line-up to 2”$X.XX per ft.
Additional Gas Line- 3/4”$X.XX per ft.
Attic/under house gas run (Additional) $XX.XX per ft.
Additional Gas Riser $XXX each
Extra Jets after 4 (standard)$XX
Upgrade to Waterway Jets (first 4)$XXX
Additional Waterway spa jets (after 4)$XX
Auto Fill$XXX
Extra Skimmer$XXX
Hook up Sheer Descent$XX each
Deck Jets$XXX ea.
Laminars$XX ea.
Tunneling under concrete up to 3’$XX
Saw Cut (Does not include removal)$XXmin.
($X per ft.>40’)
Relocate Eq. pad in yard (Add per ft. price after 10’)$XXX
Relocate Gas Line (Add per ft. price after 10’) $XXX
PREMIER POOLS CONSTRUCTION
ELECTRIC 2/1/11
BASE POOL ELECTRIC$XXXX
(Includes 125’ total, GFI at pad, pool light
switch, one pool light niche and j-box,
bonding, sub-panel, timer box, ¾” main
conduit and #8 wire)
BASE POOL/SPA ELECTRIC$XXXX
(Includes 200’ total, spa light)
PDA Credit($XXX)
Additional Footage$X.XX per ft.
Additional Footage ½” to ¾” conduit only $X.XX per ft.
Extra Light$XXX
Extra Time Clock$XXX
Extra 110 Outlets$XX
Install 220 Switch$XX
Freeze control (No PDA)$XXX
Install Sub-Panel (No available Breakers at Main)$XXX
FIBER OPTICS
Quote Only from Electrical Dept.
PORTABLE SPAS/SUB-PANELS
Spa Disconnect/50 amp G.F.I.$XXX
Footage from house panel to spa disconnect$X.XX per foot
Hook-up Portable Spa from Disconnect To Spa$X.XX per foot
MISCELLANEOUS CHARGES
Move Equipment Pad$XXX up to 10’( per ft. after 10’)
Trip Charge (misc. Elec.) $XXX
PREMIER POOLS PRICING
Sacramento/Vacaville/Stockton
Perimeter Pricing79 perimeter feet and under / $XX.XX
80 Perimeter Feet to 90 Perimeter Feet / $XX.XX
91 Perimeter Feet to 106 Perimeter Feet / $XX.XX
107 Perimeter Feet to 118 Perimeter Feet / $XX.XX
119 Perimeter Feet to 129 Perimeter Feet / $XX.XX
130 Perimeter Feet to 139 Perimeter Feet / $XX.XX
140 Perimeter Feet to 149 Perimeter Feet / $XX.XX
150 Perimeter Feet or Larger / $XXX.XX
7 ft Deep Pools – 600sq ft and Under / $XXX.XX
7 ft Deep Pools – 600sq ft and Over / $XXX.XX
8ft – 9ft Deep Pools – 600sq ft and under / $XXX.XX
8ft – 9ft Deep Pools – 600sq ft and over / $XXX.XX
Spa Perimeter Pricing
Spa Perimeter / $47.50 LFT
Itemized Extras For Perimeter Pricing
Spa Only / $X,XXX.XX
Separate Spa with Pool / $XXX.XX
Deep End Loveseat & Bench w/dirt / $XX.XX/LFT
Deep End Loveseat & Bench no dirt (1yd/4lf) / $XX.XX/LFT
Shallow End Loveseat & Bench no dirt (1yd/8lf) / $XX.XX/LFT
Raised Bond Beam / $X.XXSqFt
Baja Ledge no dirt (2 ½ - 3 yd avg) / $XXX.XX
Baja Ledge ½ dirt / $XXX.XX
Baja Ledge w/dirt / $XX.XX
Automatic Cover Box up to 15 ft / $XXX.XX
Automatic Cover Box 16 ft to 20 ft / $XXX.XX
Extra Steps over 30 lineal ft / $XX.XX/LFT
Deep End Ramp 7 ft and Over / $XXX.XX
Button Board / $XX.XX
(Page 2 of 4)
Itemized Extras For Perimeter Pricing ContinuedOver break after 3 yards / $XXX.XX
Gunite for Slides and Rock / $XXX.XX per yd
Flash / $XXX.XX (3 yd Min)
Set-up Fee for Chargeable Returns / $XXX.XX
Strip and Finish / $X.XX LFT
Columns / $XX.XXCFT
Notch Beam / $X.XX LFT
Grotto / $XXX.XX
Fuel Surcharge / See sliding scale
Yardage Pricing
*Rockwork, Waterfalls above pool elevation, and remodels over minimum charges will be billed by yard. / $XXX.XX/Yd
*Minimum Charge / $X,XXX.XX
*Pools over 150 Perimeter Ft, over 9ft in depth, out of ground, pools with caves, commercial, & vanishing edges will be billed by the yard / $XXX.XX/Yd
*Labor (muck out, set frames, tie steel, stand by) / $XXX.XX/Hr
*Perimeter price per foot includes: steps up to 30 lineal feet and waterfall pads.
Itemized Extras for Yardage PricingWing Walls / $X.XX/ Sq Ft
Raised Bond Beam per 6inch raise in elevation / $XX.XX
Spa and Grotto Labor / $XXX.XX
Vanishing Edge / $XX.XX/LFT
Button Board / $XX.XX
Strip Forms / $X.XX/LFT
Notched Bond Beam / $X.XX/LFT
Walls Outside of pool / $X.XX/Sq Ft
(Page 3 of 4)
Travel SurchargesTravel – 40 Mile Radius / $XXX.XX
Travel – 60 Mile Radius / $XXX.XX
Travel – 80 Mile Radius / $XXX.XX
From Vacaville across Scales (Cordelia) / $XXX.XX
To Vacaville / $X.XX PFT
Remodels, flashes and repairs will be $XXX.XX per yd. With no additional discounts
Dividing Factor for Gunite is 33
3 yds over break allowed per pool
Exhibit B
(Page 4 of 4)
SLIDING SCALE
FUEL SURCHARGE CHART
Fuel percentage is adjusted the 1st day of each month; based on what the U.S. average price is for DIESELFUEL at the pump.
SOURCE: then click onto Weekly Retail on Highway Diesel Prices and then click onto Average All Types.
Fuel surcharge is based on total invoice amount.
$X.XX per gallon = 0%
$X.XXper gallon = 1.0%
$X.XXper gallon = 1.5%
$X.XXper gallon = 2.0%
$X.XXper gallon = 2.5%
$X.XXper gallon = 3.0%
$X.XXper gallon = 3.5%
$X.XXper gallon = 4.0%
$X.XXper gallon = 4.5%
$X.XXper gallon = 5.0%
$X.XXper gallon = 5.5%
$X.XXper gallon = 6.0%
$X.XXper gallon = 6.5%
$X.XXper gallon = 7.0%
For every .XX cents increase per gallon the surcharge goes up by ½ %.
PREMIER POOLS CONSTRUCTION
TILE 2/1/11
Standard Pool Tile$XX per ln.ft.
Glass Pool Tile (Jewels)$XX.XX per ln. ft.
Glass Pool Tile (Oceanscapes)$XX.XX per ln. ft.
Tile Upgrade #1addtl $X.XX per ft
Tile Upgrade #2addtl $X.XX per ft
Trim Tile$X.XX per ln. ft.
Glass Trim Tile$XX per ln.ft.
PebbleTec Spotters (Fire Opals, etc.)$XX ea.
Tile Faced Raises$XX per sq. ft.
Tile Upgrade #1addtl $X.XX per sq. ft
Tile Upgrade #2addtl $X.XX per sq. ft
12” Tile Dam Wall$XXX (up to 10 ft.)
Dam Wall Past 10’$XX per ft.
12” Tile Dam Wall (Glass-Jewels)$XXX (up to 10 ft.)
Dam Wall Past 10’$XX
12” Tile Dam Wall (Glass- Oceanscapes)$XXX (up to 10 ft.)
Dam Wall Past 10’$XX
Spillways$XXX each up to 2’ wide
Install Sheer Descents$XX ea.
Wok Pots (Pre Drilled Only)$XXX ea.
Extra Skimmer$XX ea.
Diamond Inserts$XX ea.
Depth Markers$XX ea.
Targets$XX ea.
Install Sconce$XX each
Mosaics (12-18”) $XXX minimum ($XX each after 3)
Bar Stools (Must Have In Floor System)$xxx (Top & 6” along sides-penny tile only)
$XXX (Entire Stool)
3” Handhold$XX per ln.ft.
Racing Lanes (6” wide)$XX per ln. ft.
Pool Cover Weir$XX per sq. ft.
Negative Edge Weir$XX per sq. ft. ($XXon radius)
Prep Wall for Double Cantilever$X.XX per ln. ft. (Raised Spas, Pool and Walls)
PREMIER POOLS CONSTRUCTION
ROCK 2/1/11
Moss/
El Do Blue Granite Sierra Boulder
Bond Beam Rock $XX $XX $XX
Notched Bond Beam Rock w/sealing $XX $XX $XX
Set Rock Beyond Bond Beam $XX $XX $XX
“A” Waterfall (beam bubbler) $XXX $XXX Not Available
“B” Waterfall 3’ tall 4’ wide $XXXX $XXXX $XXXX
“C” Waterfall 4’ tall 5’ wide $XXXX $XXXX $XXXX
“D” Waterfall 5’ tall 6’ to 7’ wide $XXXX $XXXX $XXXX
Other Specialty Rock is now Per Bid
LARGER FALLS BID ONLY
(Note: Waterfalls with notched beam rock: Do not subtract width of waterfall from footage of beam covered by rock)
Deep end rock cluster $XXX (Must meet diving standards)
Cantilevered Grotto Rock$XXX
Standard Flagstone: (ThreeRivers, BoquetCanyon, ColdWaterCanyon, Silver/Gold
Quartzite, Blonde Rainbow, HighDesert, Mexican Multi)
Flagstone Coping$XX per sq. ft.
Flagstone Facing (includes sealing)$XX per sq. ft.
Tumbled Flagstone$XX per sq. ft.
Flagstone Grinding for Pool Edge $X per ln. ft.
Flagstone Hand Holds $XX per ln. ft.
Upgrade Coping/Facing (All other choices)$XX per sq. ft.
Ledge Stone$XX per sq. ft.
Fire pits 3’ diameter (10-12” high)$XXXX
Additional Size for Fire Pit$XXX per ft.
Access charge: Hand haul rock for difficult access $XX per ln. ft. beam rock
$XXX per waterfall
Extra rock left on site$XXX per ton (Moss & El Do Blue)
$xxx per ton (Sierra Boulder/ Other Specialty Rock)
Labor Rate$XX per hour
PREMER POOLS CONSTRUCTION
BRICK, BLOCK, STUCCO 2/1/11
Brick
Bullnose Brick Coping 12”15 per ft.
Mitered Corner (Doesn’t include l.f.)$XX each
Brick Facing (sealing included)$XX per sq. ft.
Brick Paving (base not included)$XX per sq. ft.
Brick Expansion Joints $XX per ln.ft.
(forming not included)
Mastic$ X per ln. ft.
Block Retaining Walls
Block Retaining Wall w/steel and concrete$XX.XX per sq. ft.
Footing for block wall with steel$XX per ln. ft.
Block Wall no steel/concretew/ existing footing$XX per ft.
Stucco
Stucco Face$ X per sq. ft.
Wall Prep when required$ X per sq. ft.
Seal Wall Only$ X per sq. ft.
Drainage Must Be Installed. Not Responsible for Water Damaged Stucco.
Coping
Travertine or PreCast$XX per sq. ft.
Mitered Corner for all coping stones$XX ea.
Cuts – Brick Mitered Corner$XX ea.
EARTHSCAPES CUSTOM CONCRETE
1. 400 SQ. FT. includes 80’ LN Cantilever$X,XXX
2. 1 Color Stamp$X.XX per sq.
3. 2 Color Stamp$X.XX per sq.
4. Grey Broom$X.XX per sq.
5. Thickened Edge (1st 12”)$X.XX per sq.
6. Cantilever Edge$X.XX per sq.
7. Cantilever Edge w/ Extension$XX per ln.
8. Footings$XX per ln.
9. Step Face$XX per ln.
10. Bullnose Step Face$XX per ln.
11. Deck-O-Drain$XX per ln.
12. Steel$XX per sq.
PREMIER POOLS CONSTRUCTION
EQUIPMENT SETS 2/1/11
Pool Only$XXX (Includes 1 Jandy Valve)
Pool/Spa$XXX (Includes 3 Jandy Valves)
Set Extra Pump$ XX (includes electric at pad)
Extra Jandy Valve$ XX
All Other Valves$ XX
Sheer Descent Install$ XX
Bubbler Install$ XX
Install Waterways Jets$ XX each.
Fusion Salt w/ PDA$ XX
Fusion Salt w/o PDA$XXX
Fusion Tab Feeder$ XX
Heater Install Pool Only$XXX
Manifold Change$ XX
Solar Ready Plumbing Only$XXX
Vanishing Edge Water Leveler $XXX
Set Extra Filter – Vanishing Edge$ XX
BW Valve and Sep Tank$ XX
Fire Pit/BBQ Hookup $XXX
Install MDX Drain$XX
Set In-Floor Heads $XX per head
Jandy RS install $XXX
PDA Pool Only $XX
PDA Pool and Spa $XXX
Trip Charge to install items not on equipment order $XX
PREMIER POOLS CONSTRUCTION
CLEAN-UP 2/1/11
Pool Clean-upPool/Spa Clean-up
$XXX up to 400 sq. ft.$XXX up to 400 sq. ft.
$X.XX per sq. ft. after 400 sq. ft.$X.XX per sq. ft. after 400 sq. ft.
*Clean Up Includes 1 section of fence, no post
Spa Only Prep$XXX
Install/Reverse Gate$XXX
Section of Fence (w/ New Post)$ XX
Rebuild Fence$ XX per ft.
Misc. Extra Labor per Crew$ XX per hr.
Grading w/ Small Tractor$ XX per hr.
5 Yard Trash Haul$XXX
Sand Trenches – Pool$XXX
Sand Trenches – Pool/Spa$XXX
Mastic$ X per ln. ft.
Acid Wash Decking$ .XX per sq. ft.
Concrete Removal$ X per sq. ft.
STANDARD PLASTER (WHITE) - "11"201-800 / $X,XXX / add $X.XXsq.ft. after 400
OVER 800 / BID ONLY
(up to 35' of steps, two anti vortex drains, four eyeball fittings, up to 6' deep.
$XX for each additional 6" over 6 feet
SPAS,GROTTOS,FOUNTAINS,NEGATIVE EDGE POOLS
(WITH POOLS)
$XX.XX / persq.ft.
Includes 2 anti vortex drains, 4 eyeball fittings
SPA, FOUNTAINS, PONDS
(WITHOUT POOLS)
0-200 / $X,XXX.XX
(Includes 2 anti vortex drains, 4 fittings)
TAHOE BLUE / SILICONE SHIELD
Tahoe Blue / $XXX.XX
Silicone Shield / $X.XXsq.ft.
EXTRAS
Set mosaics at plaster - up to 3 / $XXX.XX
Plaster around mosaics - up to 6 / $XXX.XX
Main drains over 2 / $XX.XX / ea.
Umbrella Sleeves / $XX.XX / ea.
Total steps over 35' / $XX.XX per ft.
Bar Stools / $XXX.XX each
Cabo ledge / $XXX.XX each
Finish to Floor Cleaning System / $XXX.XX
Pebbled beach entry / $X,XXX.XX / standard color only
(see pebble list for upgrade cost)
MISCELLANEOUS
Taping of colored grout or rock / $XXX.XX
Install recessed steps / $XX / set
PEBBLE FINA PRICES AND UPGRADES - "11"
STANDARD COLORS: / $X,XXX.XX(Add an additional $4.00 sq.ft. over 400)
Classico / Grigio
Bella Blue / Cielo Blue
Acquos
#1 UPGRADE COLORS: / $X,XXX.XX (Add an additional $4.75 sq.ft.over 400)
Black Galaxy / Sapphire Galaxy
Emerald Galaxy / BermudaShores
SPAS, GROTTOS, NEG. EDGE & FOUNTAINS
$XX.XX SQ.FT.
Premium colors, add the additional $ sq.ft. noted above.
SPAS, PONDS, FOUNTAINS W/O POOL
up to 50 sq.ft. / $X,XXX.XX / (Stand. colors only - add the above $ for upgrades)
over 50 sq.ft. / Bid Only
EXTRAS
Same as Plaster except:
Pebble Main Drains / $XX ea.
Abalone Shells / $0.XX per sq. ft.
(2 separate trips are needed for this)
Included in Base Price
Main drain grate (2 for pool - 2 for spa) & 4 return fittings for pool and for spa
Removal of slurry box
PEBBLE TEC PRICES AND UPGRADES - "11"
STANDARD COLORS: / $X,XXX.XX+(An addtional $4.00 sq.ft. over 400)
Black Pearl / Majestic Plum
White Pearl / Sandy Beach
Tahoe Blue / Black Marble
Caribbean Blue
#1 UPGRADE COLORS: / $X,XXX.XX+(An additional $4.50 sq.ft. over 400)
Jade / Soft White
Moonlight Grey / Crème de Menthe
Blue Lagoon / Jet Black
Sedona Red
#2 UPGRADE COLORS: / $X,XXX.XX +(An additional $5.00 sq.ft. over 400)
EmeraldBay / Midnight Blue
Sky Blue / Tropical Breeze
SPAS, GROTTOS, NEG. EDGE, & FOUNTAINS W/ POOL
$15.00 SQ.FT. / Premium colors add the additional $ sq.ft. noted above
SPAS, PONDS, FOUNTAINS W/O POOL
up to 50 sq.ft. / $X,XXX.XX / (Stand. colors only - add the above $ for upgrades)
over 50 sq.ft. / Bid Only
EXTRAS
Same as Plaster except:
Pebble Main Drains / $XX ea.
Abalone Shells / $0.XX per sq. ft.
Beach Entry / $XXX.XX / ea.
Beach entry / spa not same color as pool / $X,XXX.XX
(2 separate trips are needed for this)
Included in Base Price
Main drain grate (2 for pool - 2 for spa) & 4 return fittings for pool and for spa
Removal of slurry box
PEBBLE SHEEN PRICES AND UPGRADES - "11"
STANDARD COLORS: / $X,XXX.XX(Add an additional $4.50 sq.ft. over 400)
Blue Granite / Black Onyx
White Diamonds / Aqua Blue
French Grey / Bordeaux
Desert Gold / Irish Mist
#1 UPGRADE COLORS: / $X,XXX.XX (Add an additional $5.00 sq.ft.over 400)
Arctic White / Black Satin
Seafoam Green / Cool Blue
#2 UPGRADE COLORS: / $X,XXX.XX(Add an additional $5.50 sq.ft. over 400)
Ocean Blue / Slate Blue
Sky Blue / Prism Blue
TurtleBay
SPAS, GROTTOS, NEG. EDGE & FOUNTAINS
$XX.XX SQ.FT.
Premium colors, add the additional $ sq.ft. noted above.
SPAS, PONDS, FOUNTAINS W/O POOL
up to 50 sq.ft. / $X,XXX.XX / (Stand. colors only - add the above $ for upgrades)
over 50 sq.ft. / Bid Only
EXTRAS
Same as Plaster except:
Pebble Main Drains / $XX ea.
Abalone Shells / $0.XX per sq. ft.
Beach Entry / $XXX.XX / ea.
Beach entry / spa not same color as pool / $X,XXX.XX
(2 separate trips are needed for this)
Included in Base Price
Main drain grate (2 for pool - 2 for spa) & 4 return fittings for pool and for spa
Removal of slurry box
PREMIER POOLS CONSTRUCTION
START UP & SERVICE 2/1/11
START UP
Pool $XXX
Pool/Spa $XXX
Waterway Jets (includes 6)$XXX
Waterway Jets (after 6)$XX ea.
Paramount In-Floor Setup$XXX
Negative Edge Setup$XXX
SERVICE
Monthly Pool Service(see retail sheet)
50 lb. Bag of salt$XX ea.
40 lb. Bag of salt$XX ea.
Door Alarm$XX
Fire Ring (Includes 5 bags of rock)$XXX
Extra Lava Rock$ X per bag
Hook Up Slide $XX
Install Diving Board$XX
Deck Jets (up to 4)$XX
Mastic$ X per ln. ft.
Handrail Install $XX
Autofill$XX
Autofill Extender$XX
Hose Bib Backflow and Preventer Extras$XX
Tan/Grey Skimmer Lids$XX
Tan/Grey Letro Lids$XX
Skimmer Baskets$XX
Skimmer Basket Handles$X.XX
Skimmer Weir$XX
Float Valve Assembly$XX
Leaf Master Bag/Leaf Master Lid$XX
Roman Fountain $XX