PREMIER POOLS CONSTRUCTION

EXCAVATION 2/1/11

Base Dig for Rancho Cordova Office$XXXX per day + $X per sq. ft. past 400

Base Dig for Satellite Office$XXXX per day + $X per sq. ft. past 400

Attached Spa or grotto$XXX

Detached Spa$XXX

Spa Only$XXXX

Extra Grading or Layout after form/pre-site$XXX per hr

Rock/Hard Soil Charge$XXXX per day

Walk out over 100’$X per foot

Clean drive way or access over 20’ $XXX per hour

Stand By Charge$XXX per hour

Dirt on Site Credit ($XXX)

Deep end ramp$XXX

Vanishing Edge$XXX

Pool Cover Box$XXX

Extra Skimmer or Leaf Cannister$XX each

Extra Fence Removal(after 1 sections)$XX each

Pool Depth $XX per 6” past 6’

All Raised Bond Beam $X per Ln. ft.

Wing Walls with footings $X per Ln. ft.

Waterline Notched Beam (12” to 18”)$X per Ln. ft.

Concrete Removal$X per ft.

Concrete Removal w/ Steel$X per ft.

Trash Haul Each Load$XXX

Tree/Stump Removal = Grading Time + Trash Haul

Gravel Pack + Labor$XXX

Gravel $XX per yard

PREMIER POOLS CONSTRUCTION

STEEL 2/1/11

Swimming Pool Steel$XX.XX per perimeter ft.

6” Fountain wall (up to 8’)$XXX.XX

6” Fountain wall (after 8’) $XX per ft.

12” Spa Wall (up to 8’)$XXX

12” Spa Wall (after 8’)$XX per ft.

Total Bench footage after 8’ $X.XX per ft.

Ledge$XXX + $X per sq.ft. after 50

Beach$XXX

Raised Bond Beam or Wing Walls (per ln. ft.)

6” to 12”$X per ft.

18” to 24”$X per ft.

30” to 36”$X per ft.

(Add $1.00 per foot if notched for flagstone)

Footings for Block/Gunite Wall Outside of Pool$X.XX per ft.

Depth charge after 6’ 6” $XXper additional ft.

Under 12” Notched Beam $X per ft.

12 to 18” Waterline Notched Beam$X per ft.

Vanish Edge Dam Wall w/ keyway$XX per ft.

Pool Cover Box $XX per ft.

Extra Skimmer $XX ea.

Barstool $XXX ea. (must have In-Floor)

Raised Columns $XXX ea.

Waterfall Pad $XX

Custom water fall pads $XX per ft.

Deep Ramp $XXX

Free Standing Wall Schedule (Single Curtain) $X per ft.

Free Standing Wall Schedule (Double Curtain)$XX per ft.

Steel for Deck Steps$X per ft.

Commercial Recessed Steps $XX per set

Steel for Deck 12” on Center $X.XX per sq ft.

Gunite Slides Off Contract/Bid Only

Additional Labor (Engineering, Keyways, Etc.$XX per hour

PREMIER POOLS CONSTRUCTION

ROUGH PLUMBING 2/1/11

Base Pool Plumbing$XXXX

(Includes 300’ total pipe, 1 main drain, 1 skimmer, 1 pump, 1 filter)

Base Pool-Spa Combo Plumbing$XXXX

(Includes 400’ total pipe, 4 jets, 2 main drains, air loop)

Base Spa Only Plumbing$XXXX

(Includes 100’ total pipe, 4 jets, 2 main drains, air loop)

Floor Cleaning System

Set Water Valve (labor only)$XXX

Set Leaf Canister$XX

Paramount Equipment(See Equip.)

Additional Plumbing Footage$X.XX per ft.

Copper Line (Serrano)$X per ft

Solar Conduit Run$X.XX per ft

Additional Jandy valves not included in base $XX

P.V.B. or R.P.P. valve (Davis/Roseville/Lincoln)$XXX

Check valves/Non Jandy Valves$XX

Gas Line 1st 30’$XXX

Additional Gas Line-up to 2”$X.XX per ft.

Additional Gas Line- 3/4”$X.XX per ft.

Attic/under house gas run (Additional) $XX.XX per ft.

Additional Gas Riser $XXX each

Extra Jets after 4 (standard)$XX

Upgrade to Waterway Jets (first 4)$XXX

Additional Waterway spa jets (after 4)$XX

Auto Fill$XXX

Extra Skimmer$XXX

Hook up Sheer Descent$XX each

Deck Jets$XXX ea.

Laminars$XX ea.

Tunneling under concrete up to 3’$XX

Saw Cut (Does not include removal)$XXmin.

($X per ft.>40’)

Relocate Eq. pad in yard (Add per ft. price after 10’)$XXX

Relocate Gas Line (Add per ft. price after 10’) $XXX

PREMIER POOLS CONSTRUCTION

ELECTRIC 2/1/11

BASE POOL ELECTRIC$XXXX

(Includes 125’ total, GFI at pad, pool light

switch, one pool light niche and j-box,

bonding, sub-panel, timer box, ¾” main

conduit and #8 wire)

BASE POOL/SPA ELECTRIC$XXXX

(Includes 200’ total, spa light)

PDA Credit($XXX)

Additional Footage$X.XX per ft.

Additional Footage ½” to ¾” conduit only $X.XX per ft.

Extra Light$XXX

Extra Time Clock$XXX

Extra 110 Outlets$XX

Install 220 Switch$XX

Freeze control (No PDA)$XXX

Install Sub-Panel (No available Breakers at Main)$XXX

FIBER OPTICS

Quote Only from Electrical Dept.

PORTABLE SPAS/SUB-PANELS

Spa Disconnect/50 amp G.F.I.$XXX

Footage from house panel to spa disconnect$X.XX per foot

Hook-up Portable Spa from Disconnect To Spa$X.XX per foot

MISCELLANEOUS CHARGES

Move Equipment Pad$XXX up to 10’( per ft. after 10’)

Trip Charge (misc. Elec.) $XXX

PREMIER POOLS PRICING

Sacramento/Vacaville/Stockton

Perimeter Pricing
79 perimeter feet and under / $XX.XX
80 Perimeter Feet to 90 Perimeter Feet / $XX.XX
91 Perimeter Feet to 106 Perimeter Feet / $XX.XX
107 Perimeter Feet to 118 Perimeter Feet / $XX.XX
119 Perimeter Feet to 129 Perimeter Feet / $XX.XX
130 Perimeter Feet to 139 Perimeter Feet / $XX.XX
140 Perimeter Feet to 149 Perimeter Feet / $XX.XX
150 Perimeter Feet or Larger / $XXX.XX
7 ft Deep Pools – 600sq ft and Under / $XXX.XX
7 ft Deep Pools – 600sq ft and Over / $XXX.XX
8ft – 9ft Deep Pools – 600sq ft and under / $XXX.XX
8ft – 9ft Deep Pools – 600sq ft and over / $XXX.XX
Spa Perimeter Pricing
Spa Perimeter / $47.50 LFT
Itemized Extras For Perimeter Pricing
Spa Only / $X,XXX.XX
Separate Spa with Pool / $XXX.XX
Deep End Loveseat & Bench w/dirt / $XX.XX/LFT
Deep End Loveseat & Bench no dirt (1yd/4lf) / $XX.XX/LFT
Shallow End Loveseat & Bench no dirt (1yd/8lf) / $XX.XX/LFT
Raised Bond Beam / $X.XXSqFt
Baja Ledge no dirt (2 ½ - 3 yd avg) / $XXX.XX
Baja Ledge ½ dirt / $XXX.XX
Baja Ledge w/dirt / $XX.XX
Automatic Cover Box up to 15 ft / $XXX.XX
Automatic Cover Box 16 ft to 20 ft / $XXX.XX
Extra Steps over 30 lineal ft / $XX.XX/LFT
Deep End Ramp 7 ft and Over / $XXX.XX
Button Board / $XX.XX

(Page 2 of 4)

Itemized Extras For Perimeter Pricing Continued
Over break after 3 yards / $XXX.XX
Gunite for Slides and Rock / $XXX.XX per yd
Flash / $XXX.XX (3 yd Min)
Set-up Fee for Chargeable Returns / $XXX.XX
Strip and Finish / $X.XX LFT
Columns / $XX.XXCFT
Notch Beam / $X.XX LFT
Grotto / $XXX.XX
Fuel Surcharge / See sliding scale
Yardage Pricing
*Rockwork, Waterfalls above pool elevation, and remodels over minimum charges will be billed by yard. / $XXX.XX/Yd
*Minimum Charge / $X,XXX.XX
*Pools over 150 Perimeter Ft, over 9ft in depth, out of ground, pools with caves, commercial, & vanishing edges will be billed by the yard / $XXX.XX/Yd
*Labor (muck out, set frames, tie steel, stand by) / $XXX.XX/Hr

*Perimeter price per foot includes: steps up to 30 lineal feet and waterfall pads.

Itemized Extras for Yardage Pricing
Wing Walls / $X.XX/ Sq Ft
Raised Bond Beam per 6inch raise in elevation / $XX.XX
Spa and Grotto Labor / $XXX.XX
Vanishing Edge / $XX.XX/LFT
Button Board / $XX.XX
Strip Forms / $X.XX/LFT
Notched Bond Beam / $X.XX/LFT
Walls Outside of pool / $X.XX/Sq Ft

(Page 3 of 4)

Travel Surcharges
Travel – 40 Mile Radius / $XXX.XX
Travel – 60 Mile Radius / $XXX.XX
Travel – 80 Mile Radius / $XXX.XX
From Vacaville across Scales (Cordelia) / $XXX.XX
To Vacaville / $X.XX PFT

Remodels, flashes and repairs will be $XXX.XX per yd. With no additional discounts

Dividing Factor for Gunite is 33

3 yds over break allowed per pool

Exhibit B

(Page 4 of 4)

SLIDING SCALE

FUEL SURCHARGE CHART

Fuel percentage is adjusted the 1st day of each month; based on what the U.S. average price is for DIESELFUEL at the pump.

SOURCE: then click onto Weekly Retail on Highway Diesel Prices and then click onto Average All Types.

Fuel surcharge is based on total invoice amount.

$X.XX per gallon = 0%

$X.XXper gallon = 1.0%

$X.XXper gallon = 1.5%

$X.XXper gallon = 2.0%

$X.XXper gallon = 2.5%

$X.XXper gallon = 3.0%

$X.XXper gallon = 3.5%

$X.XXper gallon = 4.0%

$X.XXper gallon = 4.5%

$X.XXper gallon = 5.0%

$X.XXper gallon = 5.5%

$X.XXper gallon = 6.0%

$X.XXper gallon = 6.5%

$X.XXper gallon = 7.0%

For every .XX cents increase per gallon the surcharge goes up by ½ %.

PREMIER POOLS CONSTRUCTION

TILE 2/1/11

Standard Pool Tile$XX per ln.ft.

Glass Pool Tile (Jewels)$XX.XX per ln. ft.

Glass Pool Tile (Oceanscapes)$XX.XX per ln. ft.

Tile Upgrade #1addtl $X.XX per ft

Tile Upgrade #2addtl $X.XX per ft

Trim Tile$X.XX per ln. ft.

Glass Trim Tile$XX per ln.ft.

PebbleTec Spotters (Fire Opals, etc.)$XX ea.

Tile Faced Raises$XX per sq. ft.

Tile Upgrade #1addtl $X.XX per sq. ft

Tile Upgrade #2addtl $X.XX per sq. ft

12” Tile Dam Wall$XXX (up to 10 ft.)

Dam Wall Past 10’$XX per ft.

12” Tile Dam Wall (Glass-Jewels)$XXX (up to 10 ft.)

Dam Wall Past 10’$XX

12” Tile Dam Wall (Glass- Oceanscapes)$XXX (up to 10 ft.)

Dam Wall Past 10’$XX

Spillways$XXX each up to 2’ wide

Install Sheer Descents$XX ea.

Wok Pots (Pre Drilled Only)$XXX ea.

Extra Skimmer$XX ea.

Diamond Inserts$XX ea.

Depth Markers$XX ea.

Targets$XX ea.

Install Sconce$XX each

Mosaics (12-18”) $XXX minimum ($XX each after 3)

Bar Stools (Must Have In Floor System)$xxx (Top & 6” along sides-penny tile only)

$XXX (Entire Stool)

3” Handhold$XX per ln.ft.

Racing Lanes (6” wide)$XX per ln. ft.

Pool Cover Weir$XX per sq. ft.

Negative Edge Weir$XX per sq. ft. ($XXon radius)

Prep Wall for Double Cantilever$X.XX per ln. ft. (Raised Spas, Pool and Walls)

PREMIER POOLS CONSTRUCTION

ROCK 2/1/11

Moss/

El Do Blue Granite Sierra Boulder

Bond Beam Rock $XX $XX $XX

Notched Bond Beam Rock w/sealing $XX $XX $XX

Set Rock Beyond Bond Beam $XX $XX $XX

“A” Waterfall (beam bubbler) $XXX $XXX Not Available

“B” Waterfall 3’ tall 4’ wide $XXXX $XXXX $XXXX

“C” Waterfall 4’ tall 5’ wide $XXXX $XXXX $XXXX

“D” Waterfall 5’ tall 6’ to 7’ wide $XXXX $XXXX $XXXX

Other Specialty Rock is now Per Bid

LARGER FALLS BID ONLY

(Note: Waterfalls with notched beam rock: Do not subtract width of waterfall from footage of beam covered by rock)

Deep end rock cluster $XXX (Must meet diving standards)

Cantilevered Grotto Rock$XXX

Standard Flagstone: (ThreeRivers, BoquetCanyon, ColdWaterCanyon, Silver/Gold

Quartzite, Blonde Rainbow, HighDesert, Mexican Multi)

Flagstone Coping$XX per sq. ft.

Flagstone Facing (includes sealing)$XX per sq. ft.

Tumbled Flagstone$XX per sq. ft.

Flagstone Grinding for Pool Edge $X per ln. ft.

Flagstone Hand Holds $XX per ln. ft.

Upgrade Coping/Facing (All other choices)$XX per sq. ft.

Ledge Stone$XX per sq. ft.

Fire pits 3’ diameter (10-12” high)$XXXX

Additional Size for Fire Pit$XXX per ft.

Access charge: Hand haul rock for difficult access $XX per ln. ft. beam rock

$XXX per waterfall

Extra rock left on site$XXX per ton (Moss & El Do Blue)

$xxx per ton (Sierra Boulder/ Other Specialty Rock)

Labor Rate$XX per hour

PREMER POOLS CONSTRUCTION

BRICK, BLOCK, STUCCO 2/1/11

Brick

Bullnose Brick Coping 12”15 per ft.

Mitered Corner (Doesn’t include l.f.)$XX each

Brick Facing (sealing included)$XX per sq. ft.

Brick Paving (base not included)$XX per sq. ft.

Brick Expansion Joints $XX per ln.ft.

(forming not included)

Mastic$ X per ln. ft.

Block Retaining Walls

Block Retaining Wall w/steel and concrete$XX.XX per sq. ft.

Footing for block wall with steel$XX per ln. ft.

Block Wall no steel/concretew/ existing footing$XX per ft.

Stucco

Stucco Face$ X per sq. ft.

Wall Prep when required$ X per sq. ft.

Seal Wall Only$ X per sq. ft.

Drainage Must Be Installed. Not Responsible for Water Damaged Stucco.

Coping

Travertine or PreCast$XX per sq. ft.

Mitered Corner for all coping stones$XX ea.

Cuts – Brick Mitered Corner$XX ea.

EARTHSCAPES CUSTOM CONCRETE

1. 400 SQ. FT. includes 80’ LN Cantilever$X,XXX

2. 1 Color Stamp$X.XX per sq.

3. 2 Color Stamp$X.XX per sq.

4. Grey Broom$X.XX per sq.

5. Thickened Edge (1st 12”)$X.XX per sq.

6. Cantilever Edge$X.XX per sq.

7. Cantilever Edge w/ Extension$XX per ln.

8. Footings$XX per ln.

9. Step Face$XX per ln.

10. Bullnose Step Face$XX per ln.

11. Deck-O-Drain$XX per ln.

12. Steel$XX per sq.

PREMIER POOLS CONSTRUCTION

EQUIPMENT SETS 2/1/11

Pool Only$XXX (Includes 1 Jandy Valve)

Pool/Spa$XXX (Includes 3 Jandy Valves)

Set Extra Pump$ XX (includes electric at pad)

Extra Jandy Valve$ XX

All Other Valves$ XX

Sheer Descent Install$ XX

Bubbler Install$ XX

Install Waterways Jets$ XX each.

Fusion Salt w/ PDA$ XX

Fusion Salt w/o PDA$XXX

Fusion Tab Feeder$ XX

Heater Install Pool Only$XXX

Manifold Change$ XX

Solar Ready Plumbing Only$XXX

Vanishing Edge Water Leveler $XXX

Set Extra Filter – Vanishing Edge$ XX

BW Valve and Sep Tank$ XX

Fire Pit/BBQ Hookup $XXX

Install MDX Drain$XX

Set In-Floor Heads $XX per head

Jandy RS install $XXX

PDA Pool Only $XX

PDA Pool and Spa $XXX

Trip Charge to install items not on equipment order $XX

PREMIER POOLS CONSTRUCTION

CLEAN-UP 2/1/11

Pool Clean-upPool/Spa Clean-up

$XXX up to 400 sq. ft.$XXX up to 400 sq. ft.

$X.XX per sq. ft. after 400 sq. ft.$X.XX per sq. ft. after 400 sq. ft.

*Clean Up Includes 1 section of fence, no post

Spa Only Prep$XXX

Install/Reverse Gate$XXX

Section of Fence (w/ New Post)$ XX

Rebuild Fence$ XX per ft.

Misc. Extra Labor per Crew$ XX per hr.

Grading w/ Small Tractor$ XX per hr.

5 Yard Trash Haul$XXX

Sand Trenches – Pool$XXX

Sand Trenches – Pool/Spa$XXX

Mastic$ X per ln. ft.

Acid Wash Decking$ .XX per sq. ft.

Concrete Removal$ X per sq. ft.

STANDARD PLASTER (WHITE) - "11"
201-800 / $X,XXX / add $X.XXsq.ft. after 400
OVER 800 / BID ONLY
(up to 35' of steps, two anti vortex drains, four eyeball fittings, up to 6' deep.
$XX for each additional 6" over 6 feet
SPAS,GROTTOS,FOUNTAINS,NEGATIVE EDGE POOLS
(WITH POOLS)
$XX.XX / persq.ft.
Includes 2 anti vortex drains, 4 eyeball fittings
SPA, FOUNTAINS, PONDS
(WITHOUT POOLS)
0-200 / $X,XXX.XX
(Includes 2 anti vortex drains, 4 fittings)
TAHOE BLUE / SILICONE SHIELD
Tahoe Blue / $XXX.XX
Silicone Shield / $X.XXsq.ft.
EXTRAS
Set mosaics at plaster - up to 3 / $XXX.XX
Plaster around mosaics - up to 6 / $XXX.XX
Main drains over 2 / $XX.XX / ea.
Umbrella Sleeves / $XX.XX / ea.
Total steps over 35' / $XX.XX per ft.
Bar Stools / $XXX.XX each
Cabo ledge / $XXX.XX each
Finish to Floor Cleaning System / $XXX.XX
Pebbled beach entry / $X,XXX.XX / standard color only
(see pebble list for upgrade cost)
MISCELLANEOUS
Taping of colored grout or rock / $XXX.XX
Install recessed steps / $XX / set
PEBBLE FINA PRICES AND UPGRADES - "11"
STANDARD COLORS: / $X,XXX.XX(Add an additional $4.00 sq.ft. over 400)
Classico / Grigio
Bella Blue / Cielo Blue
Acquos
#1 UPGRADE COLORS: / $X,XXX.XX (Add an additional $4.75 sq.ft.over 400)
Black Galaxy / Sapphire Galaxy
Emerald Galaxy / BermudaShores
SPAS, GROTTOS, NEG. EDGE & FOUNTAINS
$XX.XX SQ.FT.
Premium colors, add the additional $ sq.ft. noted above.
SPAS, PONDS, FOUNTAINS W/O POOL
up to 50 sq.ft. / $X,XXX.XX / (Stand. colors only - add the above $ for upgrades)
over 50 sq.ft. / Bid Only
EXTRAS
Same as Plaster except:
Pebble Main Drains / $XX ea.
Abalone Shells / $0.XX per sq. ft.
(2 separate trips are needed for this)
Included in Base Price
Main drain grate (2 for pool - 2 for spa) & 4 return fittings for pool and for spa
Removal of slurry box
PEBBLE TEC PRICES AND UPGRADES - "11"
STANDARD COLORS: / $X,XXX.XX+(An addtional $4.00 sq.ft. over 400)
Black Pearl / Majestic Plum
White Pearl / Sandy Beach
Tahoe Blue / Black Marble
Caribbean Blue
#1 UPGRADE COLORS: / $X,XXX.XX+(An additional $4.50 sq.ft. over 400)
Jade / Soft White
Moonlight Grey / Crème de Menthe
Blue Lagoon / Jet Black
Sedona Red
#2 UPGRADE COLORS: / $X,XXX.XX +(An additional $5.00 sq.ft. over 400)
EmeraldBay / Midnight Blue
Sky Blue / Tropical Breeze
SPAS, GROTTOS, NEG. EDGE, & FOUNTAINS W/ POOL
$15.00 SQ.FT. / Premium colors add the additional $ sq.ft. noted above
SPAS, PONDS, FOUNTAINS W/O POOL
up to 50 sq.ft. / $X,XXX.XX / (Stand. colors only - add the above $ for upgrades)
over 50 sq.ft. / Bid Only
EXTRAS
Same as Plaster except:
Pebble Main Drains / $XX ea.
Abalone Shells / $0.XX per sq. ft.
Beach Entry / $XXX.XX / ea.
Beach entry / spa not same color as pool / $X,XXX.XX
(2 separate trips are needed for this)
Included in Base Price
Main drain grate (2 for pool - 2 for spa) & 4 return fittings for pool and for spa
Removal of slurry box
PEBBLE SHEEN PRICES AND UPGRADES - "11"
STANDARD COLORS: / $X,XXX.XX(Add an additional $4.50 sq.ft. over 400)
Blue Granite / Black Onyx
White Diamonds / Aqua Blue
French Grey / Bordeaux
Desert Gold / Irish Mist
#1 UPGRADE COLORS: / $X,XXX.XX (Add an additional $5.00 sq.ft.over 400)
Arctic White / Black Satin
Seafoam Green / Cool Blue
#2 UPGRADE COLORS: / $X,XXX.XX(Add an additional $5.50 sq.ft. over 400)
Ocean Blue / Slate Blue
Sky Blue / Prism Blue
TurtleBay
SPAS, GROTTOS, NEG. EDGE & FOUNTAINS
$XX.XX SQ.FT.
Premium colors, add the additional $ sq.ft. noted above.
SPAS, PONDS, FOUNTAINS W/O POOL
up to 50 sq.ft. / $X,XXX.XX / (Stand. colors only - add the above $ for upgrades)
over 50 sq.ft. / Bid Only
EXTRAS
Same as Plaster except:
Pebble Main Drains / $XX ea.
Abalone Shells / $0.XX per sq. ft.
Beach Entry / $XXX.XX / ea.
Beach entry / spa not same color as pool / $X,XXX.XX
(2 separate trips are needed for this)
Included in Base Price
Main drain grate (2 for pool - 2 for spa) & 4 return fittings for pool and for spa
Removal of slurry box

PREMIER POOLS CONSTRUCTION

START UP & SERVICE 2/1/11

START UP

Pool $XXX

Pool/Spa $XXX

Waterway Jets (includes 6)$XXX

Waterway Jets (after 6)$XX ea.

Paramount In-Floor Setup$XXX

Negative Edge Setup$XXX

SERVICE

Monthly Pool Service(see retail sheet)

50 lb. Bag of salt$XX ea.

40 lb. Bag of salt$XX ea.

Door Alarm$XX

Fire Ring (Includes 5 bags of rock)$XXX

Extra Lava Rock$ X per bag

Hook Up Slide $XX

Install Diving Board$XX

Deck Jets (up to 4)$XX

Mastic$ X per ln. ft.

Handrail Install $XX

Autofill$XX

Autofill Extender$XX

Hose Bib Backflow and Preventer Extras$XX

Tan/Grey Skimmer Lids$XX

Tan/Grey Letro Lids$XX

Skimmer Baskets$XX

Skimmer Basket Handles$X.XX

Skimmer Weir$XX

Float Valve Assembly$XX

Leaf Master Bag/Leaf Master Lid$XX

Roman Fountain $XX