SITE MONITORING REPORT

File Ref: 24 421 09c / Date: 26 June 2008 / Visit no: 1 of 4
Monitoring Officer:Glenn Shaw
Tel No:01245437117 / Time on site:
1530 / Time off site:
1630
Site Co-ordinator:Maria Tourvas / Tel No:01245 437507
Site Name:Asheldham Quarry, Tillingham Road, Essex, CM0 7DT
Operator:Lafarge Aggregates
Site Representative: John Hilton Lafarge Aggregates
Permission no’s:
MAL/252/77 (dated September 1980) Extraction of minerals (completion in 17 years of the date of commencement).
MAL/252/77/1 Provision of concrete roadway, alternative temporary access, weighbridge and office, processing plant and workshop.
ESX/49/92/MAL Variation of MAL/252/77 conditions 2 (time limit extended to 31 December 2014), 8 (the method of working and restoration), 10 (general direction of excavation shown on plan D7/30A Oct 93) and 17 (not more than one working phase (shown on plan D7/30A) between one being worked and restored)
ESS/14/00/MAL ROMP.
Outstanding Submission of details:
None
Constraints:
Weather:Dry/ Windy / Rain / Snow
Noise:Acceptable/ Not acceptable N/A
Approach Roads:Dry / Dusty / Wet / Muddy / Flooded
Ground:Dry / Dusty / Wet / Damp / Muddy / Flooded
Access: Obstructed / Not Obstructed / Mud on Road / Ice / Slippery
Wheel Cleaning:Washer / Spinner / Sweeper / none
Hose:In use / Not in Use/ N/A
Machinery:Working / Not working N/A
In correct position:Yes / No / N/A
Stockpiles:Height=5- 10 metres
Bunds:Profiled / Grassed / Weeds
Actions from last site visit:
Lafarge to advise on effects of the site on neighbouring pond.
Lafarge to provide agreed details on Phase 1 aftercare.
Lafarge to provide details on water body banks restoration.
Inspection results summary:
Site notice visible and unobstructed.
Site neat and tidy.
Bunds well profiled and grassed.
Footpath topped and maintained.
Compliance with Conditions
Permission No. / Condition No. / Scope of Condition and Action to be taken / Action to be taken by
Actions to be taken before next site visit:
Lafarge to advise on effects of the site on neighbouring pond.
Lafarge to provide agreed details on Phase 1 aftercare.
Lafarge to provide details on water body banks restoration

Updated 14/08/07