KENDRIYA VIDYALAYA AIR FORCE STATION SULUR

LIST OF MATERIALS/SERVICES

Sl.no / Items/description / Quantity / Rate / Remark
1 / Distemper 10 ltr (standard company with ISI) / per container
2 / Distemper 20 ltr (standard company with ISI) / per container
3 / Distemper 40 ltr (standard company with ISI)
3 / Oil paint 4 ltr (standard company with ISI) / per container
4 / Oil paint 10 ltr (standard company with ISI) / per container
5 / Exterior emulsion paint 10 ltr (standard company with ISI) / per container
6 / Exterior emulsion paint 20 ltr (standard company with ISI) / per container
7 / Exterior emulsion paint 40 ltr (standard company with ISI)
8 / Wall putty 1 kg / Per kg
9 / Turpentine 1 ltr / Per litter
10 / Thinner 1 ltr
11 / Emery cloth / Per piece
12 / Wire brush (good quality) / Per piece
13 / Jnathacem/sneha cem 40 kg bag / Per bag
14 / Brush 4 inch (good quality) / Per piece
15 / Blue 1 kg packet / Per kg
16 / Banyan waste / Per kg
17 / Cement ( standard company with ISI) / Per 50 kg bg
18 / Sand (river) / Per unit
19 / Crusher Blue metal ½ inch / Per unit
20 / Crusher Blue metal ¾ inch / Per unit
21 / Crusher Blue metal 1 inch / Per unit
22 / PVC door 7 feet x 2 feet approximately
(Fabricating the door panel to the size of existing doors measuring individually and fitting, fixing the door to the frames by providing appropriate hinges, latches, tower bolts, screws etc) / 17 nos (app) / Per piece
23 / Semiskilled laborer (Painter) / Per person/day / 8 hrs
24 / Semiskilled laborer (Mason) / Per person/day / 8 hrs
25 / Semiskilled laborer (Carpenter) / Per person/day / 8 hrs
26 / Semiskilled laborer (Plumber) / Per person/day / 8 hrs
27 / Unskilled laborer-(male) helper for plumbing/ carpenter/ mason/ painter and etc / Per person/day / 8 hrs
28 / Unskilled laborer–(female) for cleaning/grass cutting/weed removing etc. / Per person/day / 8 hrs
29 / Unskilled laborer – (male) for earth work/digging/trenching etc. / Per person/day / 8 hrs

continued..

i)Supply includes transportation of the materials to the vidyalaya premises or staff quarters including loading, unloading and handling charges (if any).

ii)The rate should be inclusive of all Taxes/VAT etc as applicable

iii) The quantities mentioned are tentative and the Principal KV AFS Sulur reserves the right to modify the quantities as per the requirements

iv) The contractor should have his/her own TIN number and PAN number, payments will be made only by cheque

v)Cost of tender form Rs.50/-

Principal