NKHATABAY DISTRICT COUNCIL
ENVIRONMENTAL MANAGEMENT PLAN FOR SCHOOL BLOCKS AND TEACHER HOUSES.
Name of School:KalabweZone: St Maria GorettiTA: Mkumbira
Constituency: CentralProject: Teachers House
Environmental Component / Expected impacts / Proposed Mitigation measures / Targets / Responsibility / Timeframe2009/10 / 2010/ 12
Soils / Loss of top soil for Agricultural Activities / Planting of grass around the house / 20 m2 / SMC / 2011 / June 2012
Creation of ditches/ open pits to pose as danger to children / refilling the ditches and pits / 5 m2 / SMC / June 2012
Barrow pits/ trenches due to sand and clay mining / from the lake and the lake back fill the sand / nature / 2010/ 2012
Debris left from construction activities / collecting and heaping them / 5 m2 / SMC / July 2012
Reflection from roof surfaces and poor workmanship / Construction of water drain / about 15 m / Contractors / June 2012
Cultural heritage and sites / Possible destruction of the nearby commentary / N/A
Social Conflict / Loss of farming land due to loss of extension of land for the school loss of livelihood / N/A
Flora and Terrestrial Fauna / Conflict over use of natural resources, water, land e.t.c. / 2012 ongoing process.
Sustainability / Loss of vegetation due to kilning of bricks. / Planting new trees and grass. / 20 m2 / SMC / 2012 ongoing process.
Loss of roofs due to hail winds / Planting new trees and grass. / 20 m2 / SMC / 2012 ongoing process.
Theft and vandalism of solar equipment / N/A
Quantity of material and workmanship / Planting new trees and grass. / 20 m2 / SMC and resident of the house / 2012 ongoing process.
Status of implemented measures. / 30% implemented measures have been done.
CHALLENGES FACES DURING THE IMPLEMENTATION OF MITIGATION MEASURES.
- Stealing of planted trees.
- Community not taking the major role.
- Delay in the installation of electricity.
SUGGESTED SOLUTIONS.
- Sensitizing the community the importance of trees on the site and stop vandalizing the premise.
- Sensitizing the community the importance of taking a big role in a project.
- Visiting and reminding the ESCOM Office to install the power.
CONTACT.
KALAMBWE SCHOOL
C/O BOX 93, NKHATA-BAY
CELL: 0999609298/ 0881774529
Name of School: MteteteZone: St Maria GorettiTA: Mkumbira
Constituency: CentralProject: Mtetete Teachers House
Environmental Component / Expected impacts / Proposed Mitigation measures / Targets / Responsibility / Timeframe2009/10 / 2010/ 12
Soils / Loss of top soil for Agricultural Activities / Planting of tree / 1/10 of hector / Community / December 2012
Creation of ditches/ open pits to pose as danger to children / Planting of bananas / 25 m2 / Community / December 2012
Barrow pits/ trenches due to sand and clay mining / Planting of trees where there was no trees (hot spots) / 100m / Community / December 2012
Debris left from construction activities / Half bricks were used for making lawns / School / September 2010
Reflection from roof surfaces and poor workmanship / Construction of water drain / Surrounding the house / Contractors / September 2010
Cultural heritage and sites / Possible destruction of the nearby commentary / N/A
Social Conflict / Loss of farming land due to loss of extension of land for the school loss of livelihood / N/A
Flora and Terrestrial Fauna / Conflict over use of natural resources, water, land e.t.c. / N/A / .
Sustainability / Loss of vegetation due to kilning of bricks. / N/A
Loss of roofs due to hail winds / N/A
Theft and vandalism of solar equipment / N/A
Quantity of material and workmanship / Planting of flowers and new trees and grass. / surrounding the house / house resident and the community for the tree / December 2012
Status of implemented measures. / standard infrastructure and of good quality / house / Maintenance committee / December 2012
CHALLENGES FACES DURING THE IMPLEMENTATION OF MITIGATION MEASURES.
- Delay of some mitigation measures.
- Delay of electricity installation by ESCOM.
SUGGESTED SOLUTIONS.
- The SMC to be sensitized on mitigation measures so that they should inform the community and implement the measures by end 2012.
- Continuous press the ESCOM people.
CONTACT.
RIC Mhone (Head Teacher) 0999583957
Mtetete F.P. School
P.O. Box 70, Nkhata bay.
Name of School:LifupaZone:KacheleTA: Kabundulu
Constituency:Nkhata-Bay WestProject:Lifupa Teachcers House
Environmental Component / Expected impacts / Proposed Mitigation measures / Targets / Responsibility / Timeframe2009/10 / 2010/ 12
Soils / Loss of top soil for Agricultural Activities / Filling of ditches with soil / ¼ hactors / Community / October 2011
Creation of ditches/ open pits to pose as danger to children / Filling in of ditches with soil 1/10 hectors / 1/10 hectors / Community / June 2011
Barrow pits/ trenches due to sand and clay mining / Protecting trees and vegetation cover from bush fire / 6 hectors / Community / 2011- 2012
Debris left from construction activities / Reserved for filing in foundation for school block. / 5 m2 / Community / 2011- 2012
Reflection from roof surfaces and poor workmanship / Construction of water drain / 64 metres by ½ m / Contractors / October 2011
Cultural heritage and sites / Possible destruction of the nearby commentary / N/A
Social Conflict / Loss of farming land due to loss of extension of land for the school loss of livelihood / N/A
Flora and Terrestrial Fauna / Conflict over use of natural resources, water, land e.t.c. / N/A / 2012 ongoing process.
Sustainability / Loss of vegetation due to kilning of bricks. / Planting new trees and grass and protecting available trees. / 3 hectors / Community / 2010/ 2011 February
Loss of roofs due to hail winds / Planting new trees and grass and protecting surrounding trees. / 1 hector / Community / 2011/ 2012
Theft and vandalism of solar equipment / Sensitizing of community to prevent vandalism. / Solar Panel / Community / 2012
Quantity of material and workmanship / Application of minor maintenance e.g. flooring and planting. / Whole house and other components / SMC and resident of the house / Every two years.
Status of implemented measures. / 80% implemented measures have been done.
CHALLENGES FACES DURING THE IMPLEMENTATION OF MITIGATION MEASURES.
- Lack of fruits seedlings.
- Opening of new gardens and shifting cultivation.
- Delayed installation of solar.
SUGGESTED SOLUTIONS.
- SMC to raise funds for purchasing of fruit seedlings and other tree speeches.
- SMC to sensitize communities through village heads
- Not to practice shifting cultivation and opening of new gardens.
- SMC discussing with the MP to support the school to procure solar system.
CONTACT.
Ephron C. Phiri (HEAD TEACHERS).0884195076
Lifupa F.P. School, P/ Bag 3, P.O. Kande. Nkhata-Bay.
Name of School:KambuwiZone: St Maria GorettiTA: Mkumbira
Constituency: CentralProject:School Block
Environmental Component / Expected impacts / Proposed Mitigation measures / Targets / Responsibility / Timeframe2009/10 / 2010/ 12
Soils / Loss of top soil for Agricultural Activities /
- Planting of vertiver.
- Applying manure
Creation of ditches/ open pits to pose as danger to children /
- Cover with soil
Barrow pits/ trenches due to sand and clay mining /
- Cover with soil
- Do not dig deep
Debris left from construction activities / used to cover pits and ditches / pupils / Head Teacher / October 2012
Reflection from roof surfaces and poor workmanship / Construction of water drain / Parents / SMC / October 2012
Cultural heritage and sites / Possible destruction of the nearby commentary / N/A
Social Conflict / Loss of farming land due to loss of extension of land for the school loss of livelihood / relocate to the other land / community / Village Head / July 2012 to January 2013
Flora and Terrestrial Fauna / Conflict over use of natural resources, water, land e.t.c. /
- Increase sources of water.
- Relocate to new land
Sustainability / Loss of vegetation due to kilning of bricks. / Planting new trees and grass. / Community / Community / December 2012
Loss of roofs due to hail winds / Planting new trees and grass. / community / PTA / December 2012
Theft and vandalism of solar equipment / Icrease security / community / Village Headman
Quantity of material and workmanship / intensify supervision / community / SMC / September
Status of implemented measure
CHALLENGES FACES DURING THE IMPLEMENTATION OF MITIGATION MEASURES.
- Lack of seedlings, polythene tube, canes and wheel barrows.
- Inadequate land to re-allocate dispersed people.
SUGGESTED SOLUTIONS.
- Provision of necessary resources to enable timely completion of the work.
- Liaise with other village Heads to find land for the reallocation.
CONTACT.
W.M KAMANGA
CELL: 0884107765
Name of School:BweleroZone: St Maria GorettiTA: Mkumbira
Constituency: CentralProject:Teachers House
Environmental Component / Expected impacts / Proposed Mitigation measures / Targets / Responsibility / Timeframe2009/10 / 2010/ 12
Soils / Loss of top soil for Agricultural Activities /
- Planting of glass.
- Planting of shrubs like tree
Creation of ditches/ open pits to pose as danger to children /
- Cover ditches/ open pits with debris left from construction and soil
Barrow pits/ trenches due to sand and clay mining /
- Cover with soil
- Do not dig deep
Debris left from construction activities / used to cover pits and ditches / PTA / PTA / September 2012
Reflection from roof surfaces and poor workmanship / select skilled laborer / SMC / Community / June 2012
Cultural heritage and sites / Possible destruction of the nearby commentary / N/A
Social Conflict / Loss of farming land due to loss of extension of land for the school loss of livelihood / N/A
Flora and Terrestrial Fauna / Conflict over use of natural resources, water, land e.t.c. / N/A
Sustainability / Loss of vegetation due to kilning of bricks. / Planting new trees and grass. / Community / Group Village Head / December 2012
Loss of roofs due to hail winds / Planting new trees and grass. / community / Group Village Head / December 2012
Theft and vandalism of solar equipment / Increase security / community / Village Headman
Quantity of material and workmanship / intensify monitoring and supervision / community / Village Headman / September 2012
Status of implemented measure / Improve environmental management / provision and locally resources necessary resources / community / Local Council / December 2012
CHALLENGES FACES DURING THE IMPLEMENTATION OF MITIGATION MEASURES.
- Lack of resources like seedlings, polythene tube e.t.c.
- Low community participation.
- Untimely tackling of the proposed mitigation measures.
SUGGESTED SOLUTIONS.
- Locally sources and provide necessary resources.
- Adequately motivation of the community.
- Tackle proposed mitigation measures in time.
CONTACT.
MATHIAS KAULANDA
CELL: 0999076337
Name of School:ChipamboZone:MazambaTA: Kabunduli
Constituency:WestProject: Teachers House
Environmental Component / Expected impacts / Proposed Mitigation measures / Targets / Responsibility / Timeframe2009/10 / 2010/ 12
Soils / Loss of top soil for Agricultural Activities / it was infertile land
Creation of ditches/ open pits to pose as danger to children / refilling the ditches and pits / all ditches / SMC
Barrow pits/ trenches due to sand and clay mining / refilling / all / SMC
Debris left from construction activities / removal and used to fill pits and over foundation / all debris / SMC
Reflection from roof surfaces and poor workmanship / Construction of per plan / good design / Contractors
Cultural heritage and sites / Possible destruction of the nearby commentary / N/A
Social Conflict / Loss of farming land due to loss of extension of land for the school loss of livelihood / N/A
Flora and Terrestrial Fauna / Conflict over use of natural resources, water, land e.t.c. / chiefs open declaration of land as part and parcel of the school premise / community / SMC
Sustainability / Loss of vegetation due to kilning of bricks. / sourcing and planting of seedlings / 1600 / SMC
Loss of roofs due to hail winds / Planting new trees and grass. / 1600 / SMC
Theft and vandalism of solar equipment / recruiting of the watchmen / no loss of materials
Quantity of material and workmanship / close supervision / throughout the project / SMC and resident of the house / 2012 ongoing process.
Status of implemented measures.
CHALLENGES FACES DURING THE IMPLEMENTATION OF MITIGATION MEASURES.
- Late sourcing of seedlings which resulted in most of them wilting.
SUGGESTED SOLUTIONS.
- Timely panning and planting of trees.
CONTACT.
B. Kumwenda 0888683705.
Name of School:ChangantoleZone:MazambaTA: Kabunduli
Constituency:SouthProject: Teachers House
Environmental Component / Expected impacts / Proposed Mitigation measures / Targets / Responsibility / Timeframe2009/10 / 2010/ 12
Soils / Loss of top soil for Agricultural Activities
Creation of ditches/ open pits to pose as danger to children / refilling the ditches and pits / all created ditches ditches / community
Barrow pits/ trenches due to sand and clay mining / refilling with debris and bricks and stones / all / SMC
Debris left from construction activities / removing them and use to back stop the slope / all / SMC
Reflection from roof surfaces and poor workmanship / Construction of per plan / good design / Contractors
Cultural heritage and sites / Possible destruction of the nearby commentary / N/A
Social Conflict / Loss of farming land due to loss of extension of land for the school loss of livelihood / N/A
Flora and Terrestrial Fauna / Conflict over use of natural resources, water, land e.t.c. / the chief Machuka II and SMC signed a the land agreement / SMC
Sustainability / Loss of vegetation due to kilning of bricks. / planting of Pine, Blue Gum and acacia / 300 / Luwawa Environmental Trust
Loss of roofs due to hail winds / Planting trees around the house. / 300 / SMC
Theft and vandalism of solar equipment / recruiting of the watchmen / no loss of materials / community
Quantity of material and workmanship / close supervision / throughout the project / SMC and resident of the house / 2012 ongoing process.
Status of implemented measures.
CHALLENGES FACES DURING THE IMPLEMENTATION OF MITIGATION MEASURES.
- Payment of the watchman due the financial constraint of t he community..
SUGGESTED SOLUTIONS.
- Project amount should include watchmen wages in the budget.
CONTACT.
Mr. M.P. Kanyika 0884902349/ 0996336049
Mr. Matias Chirwa 0881009178
Name of School:MgonapasiZone:ChikwinaTA: M’Bwana
Constituency:NorthProject: Teachers House
Environmental Component / Expected impacts / Proposed Mitigation measures / Targets / Responsibility / Timeframe2009/10 / 2010/ 12
Soils / Loss of top soil for Agricultural Activities / planting Kapinga and Floriculture / quarter / community / 1/1/2012
Creation of ditches/ open pits to pose as danger to children / refilling the ditches and pits / ¼ acre / community / December 2011.
Barrow pits/ trenches due to sand and clay mining / planting of trees along river banks reserving existing trees / 5 hectors / community / December 2012
Debris left from construction activities / used for filling in trenches and ditches / 5m*8m / community / December 2011
Reflection from roof surfaces and poor workmanship / construction of water drainage / 40m Surrounding the house. / Contractors / December 2011
Cultural heritage and sites / Possible destruction of the nearby commentary / N/A
Social Conflict / Loss of farming land due to loss of extension of land for the school loss of livelihood / N/A
Flora and Terrestrial Fauna / Conflict over use of natural resources, water, land e.t.c.
Sustainability / Loss of vegetation due to kilning of bricks. / planting trees and conserving exciting ones / 3 hector / community / December 2012
Loss of roofs due to hail winds
Theft and vandalism of solar equipment / SMC sensitizing community on Vandalism / solar and community / community / December 2012
Quantity of material and workmanship / planting of more flowers and maintenance / house and surrounding / SMC and occupant / December 2011
Status of implemented measures. / 75% coverage
CHALLENGES FACES DURING THE IMPLEMENTATION OF MITIGATION MEASURES.
- Delay of solar procurement due, due to funds with the council.
SUGGESTED SOLUTIONS.
- SMC to follow-up of the remaining funds for Solar.
CONTACT.
Deputy Head Teacher 099541529
Name of School:Chufupa Zone:ChikwinaTA: Nyaluwangwa
Constituency:NorthProject: Teachers House
Environmental Component / Expected impacts / Proposed Mitigation measures / Targets / Responsibility / Timeframe2009/10 / 2010/ 12
Soils / Loss of top soil for Agricultural Activities / planting vertiva kapinga and hedge / ¼ Acres / community / December 2012
Creation of ditches/ open pits to pose as danger to children / Land Scapping filling of open pits and ditches / ¼ Acres / community / April 2012
Barrow pits/ trenches due to sand and clay mining / Reserving trees and vegetation cover along river banks. / river banks / community / 2012 on-going
Debris left from construction activities / filling of pits and dishes / ¼ Acres / Community / December 2011
Reflection from roof surfaces and poor workmanship / Construction of drains / 30 M surrounding the housing. / Contractors / December 2011
Cultural heritage and sites / Possible destruction of the nearby commentary / N/A
Social Conflict / Loss of farming land due to loss of extension of land for the school loss of livelihood / N/A
Flora and Terrestrial Fauna / Conflict over use of natural resources, water, land e.t.c. / N/A
Sustainability / Loss of vegetation due to kilning of bricks. / Planting trees and conserving existing ones / 2 hectors / January 2012 and on-going
Loss of roofs due to hail winds / Planting trees surrounding the house / ¼ Acres / Community / January 2012 and on-going
Theft and vandalism of solar equipment / Civic education to community / community / SMC / January 2012 and on-going
Quantity of material and workmanship / maintenance works to be done yearly / House / SMC Committee / December 2012
Status of implemented measures. / 75% of coverage of measures implement
CHALLENGES FACES DURING THE IMPLEMENTATION OF MITIGATION MEASURES.
- Insufficient building materials e.g. cement (the drainage is not complete)
- Fruits trees not accessed
SUGGESTED SOLUTIONS.
- School community to mobilize funds for procurement of materials for the completion of the drains
- School committee to raise seedlings and plant around the school.
CONTACT.
Chifupa F.P. School
Box 19,
Chikwina
Gladson G. Msiska
0881804128/ 0994256305
Name of School:Chufupa Zone:ChikwinaTA: Nyaluwangwa
Constituency:NorthProject: Teachers House
Environmental Component / Expected impacts / Proposed Mitigation measures / Targets / Responsibility / Timeframe2009/10 / 2010/ 12
Soils / Loss of top soil for Agricultural Activities / planting vertiva kapinga and hedge / ¼ Acres / community / December 2012
Creation of ditches/ open pits to pose as danger to children / Land Scapping filling of open pits and ditches / ¼ Acres / community / April 2012
Barrow pits/ trenches due to sand and clay mining / Reserving trees and vegetation cover along river banks. / river banks / community / 2012 on-going
Debris left from construction activities / filling of pits and dishes / ¼ Acres / Community / December 2011
Reflection from roof surfaces and poor workmanship / Construction of drains / 30 M surrounding the housing. / Contractors / December 2011
Cultural heritage and sites / Possible destruction of the nearby commentary / N/A
Social Conflict / Loss of farming land due to loss of extension of land for the school loss of livelihood / N/A
Flora and Terrestrial Fauna / Conflict over use of natural resources, water, land e.t.c. / N/A
Sustainability / Loss of vegetation due to kilning of bricks. / Planting trees and conserving existing ones / 2 hectors / January 2012 and on-going
Loss of roofs due to hail winds / Planting trees surrounding the house / ¼ Acres / Community / January 2012 and on-going
Theft and vandalism of solar equipment / Civic education to community / community / SMC / January 2012 and on-going
Quantity of material and workmanship / maintenance works to be done yearly / House / SMC Committee / December 2012
Status of implemented measures. / 75% of coverage of measures implement
CHALLENGES FACES DURING THE IMPLEMENTATION OF MITIGATION MEASURES.