- 4 -

Document CNG3/5-E
31 May 2006
English Only
CNG3
Chairman, CNG3
report DOCUMENT on 2nd iteration
EASTERN AFRICA
Problem at 2nd iteration / Remaining Problem / Remarks
BDI / Bad results for DVB_T in Band III
Out of 7 reqs, only 2 went in. They will be happy with 5 reqs in.
Pb: No coordination with COD / No coordination with COD / BR representative for COD
RRW, TZA
KEN / Very good results achieved. / Problems at the border of KEN.
They are now coordinating with their neighbours. 2 absent Adm’s: ETH, SOM. / BR representative for absent countries.
RRW / Bad results for DVB_T in bands III, IV and V / The input data previously generated by the BR was merged with the new set of requirements.
+
No coordination with COD / Mr W. Broszczak from the BR
SDN / Bad results for DVB_T in Band III
4 neighbouring Adm’s absent: CFA, ETH, ERI, COD
Completed after 2nd iteration: TCD, ARS. / Coordination with COD has to be re-done to take the terrain into account.
Coordination not done with CFA, ETH, ERI. / BR representative for absent countries
Problem at 2nd iteration / Remaining problem / Remarks
TZA / Problems not yet reported. / Coordination with COD, F(Mayotte) / BR representative for absent countries
UGA / Bad results for DVB_T in Band III.
UGA has finalised the preparation of
reciprocal AD’s with
SDN. It was not taken into account for iteration 2. / No Coordination with COD. / BR representative for absent countries
COD / Not present at the Conference / BR representative for absent countries
ETH / Not present at the Conference / BR representative for absent countries
SOUTHERN AFRICA
Problem at 2nd iteration / Remaining Problem / Remarks
AFS / Good results achieved
Coordination with MOZ ongoing. / Calvo (AFS)
AGL / Not present at the CNG meeting.
60% in for Band III
66% in Bands IV V / Calvo (AFS)
And
Mr Petzer (AFS)
BOT / Good results achieved.(56% DVB_T in Band III) / Will solve the T_DAB
problems by adopting the SADC plan / NO EXTERNAL HELP REQUIRED
COM / Not present for 1st and 2nd iterations / Working on SADC plan for T_DAB / BR representative for absent countries
and
F
LSO / Major problems with DVB_T / On VHF 11 channels to sort out
Major internal incompatibilities whith margins higher than 20dB
T_DAB will be harmonised with T_DAB plan for Southern Africa
MAU / Just arrived at the conference. Not seen in CNG3 / ?
MOZ / 32% in Band III
MOZ did not submit their AD’s during the 2nd iteration. Will be done for the 3rd iteration / Working on SADC plan for T_DAB
Coordination needed with F(Mayotte), ZMB, MWI. / Calvo(AFS)
Mr Petzer(AFS)
MWI / -Interference with ZMB will be solved by reducing the effective heights
-have to coordinate with MOZ / Working on SADC plan for T_DAB
NMB / No reciprocal declarations submitted with the neighbours / Change from assignmnt to allotment planning for T_DAB.
Will not adopt the SADC plan for now
SOUTHERN AFRICA
Problem at 2nd iteration / Remaining Problem / Remarks
SWZ / Problems with T_DAB / Problems in allotting SWZ for T_DAB.
Will adopt the SADC plan / Mr Mwale (ZMB)
ZMB / Not major problems / Will solve the T_DAB
problems by adopting the SADC plan / Have to coordinate with MOZ, AGL
ZWE / Internal incompatibilities to be solved
Has to coordinate with BOT,MOZ, ZMB. / Will solve the T_DAB
problems by adopting the SADC plan / Have to coordinate with BOT, MOZ, ZMB
MDG / Not present at the Conference / BR representative for absent countries

4

http://fpweb/ITU-R/conferences/rrc/rrc-06/plan_process/CNG3/docs/DocCNG3-5.doc 31.05.06 31.05.06