NATIONAL HIGHWAYS AUTHORITY OF INDIA

PIU-Hisar

Name of Work: Four laning of of Hisar to Dabwali section of NH-10 from km. 170.000 to Km. 315.550 under NHDP Phase –IVB in the State of Haryana.

Member (F/T): Sh. Satish Chandra CGM (T): Sh. B.S. Singla

CGM-cum-RO (Chandigarh): Sh. Dev Raj GM (T)-P&H: Col. M. K. Jain

Project Director: Sh. V.K. Jain

SALIENT FEATURES / STATUS OF THE PROJECT

As on 27.06.2014

Sl. No. / Particulars / Details/Status
1 / Length: Existing/Design / 145.550 km / 145.785 km
2 / NH No. : Old/New / 10/09
3 / Chainage: Existing –
New - / Km 315 (Dabwali) to Km 170 (Hisar)
Km 33.220 (Dabwali) to Km 178.720 (Hisar)
4 / NHDP Phase / IV B
5 / Funding / DBFOT
6 / Name of DPR Consultant / M/s Theme Engineering Services Pvt. Ltd.
7 / Name of contractor (Concessionaire in case of BOT/ Annuity Project / Work yet to be awarded
8 / Name of Supervision consultant (IE in case of BOT/Annuity Project) / Work yet to be awarded
9 / Contract Amount/TPC (Rs. in Crores) / 1461.49 crore
10 / Construction period / 910 days
11 / Concession period / 24 years
12 / Premium / Work yet to be awarded
13 / Date of Issue of LOA / Work yet to be awarded
14 / Date of Agreement / Work yet to be awarded
15 / Date of Commencement / Appointed date / Work yet to be awarded
16 / Scheduled Date of Completion / Work yet to be awarded
17 / Physical Progress (%) as on date / Work yet to be awarded
18 / Detail of Structures
Type of structure / No. of structure / Location of structure at (Design Chainage)
a)  / ROBs / 01 no. / Km.262.127
b)  / Grade Separator / 09 Nos. / i.  Km.187.338
ii.  Km.209.135
iii.  Km.213.372
iv.  Km.217.358
v.  Km.223.383
vi.  Km.250.705
vii.  Km.252.350
viii.  Km.257.165
ix.  Km.262.415
c)  / Major Bridges / 01 No. / i.  Km.263.760
d)  / Bypasses / 02 Nos. / i)  Fatehabad Bypass (Design Chainage - Km. 208+900 to Km.223+565) – Length -14.665 Km.
ii)  Sirsa Bypass (Design Chainage -Km. 251+431 to Km.262+311) – Length -10.880 Km.
e)  / Toll Plaza / 03 nos. / i.  Km.184.025
ii.  Km.241.893
iii.  Km.302.273
f)  / Vehicular Underpass / 01 no. / i.  Km.179.03
g)  / Cattle Underpasses / 02 nos. / i.  Km.215.400
ii.  Km.255.300
h)  / Truck Lay bye / 03 nos. / i.  Km.198.800
ii.  Km.248.100
iii.  Km.308.250
i)  / Bus Bays / 18 nos.
j)  / Service Road (Length) / 39.654 Km. (On Both sides)
k)  / Slip Road (Length) / 11.914 km (both side)
l)  / Average base traffic/ PCU (year 2011) / 15772 PCU