Annex-4
Help Sheet for Data Capture Format for Non-PPP infrastructure projects
S. No. / Parameter / DescriptionA. / General Information
Project Name / Provide the name of the project as mentioned in the contract agreement
Project Brief / Provide a brief description of the project including key features of the project for e.g. land area, type of technology, number of lanes in case of road project, type of fuel in case of power project, etc.
Sector / Select a sector from the drop down menu
(In case of hardcopy submission, indicate the sector as per the list of infrastructure sectors attached)
Sub sector / Select a sub sector from the drop down menu
(In case of manual submission, indicate the sub sector as per the list of infrastructure sectors attached)
Project Capacity / Select the appropriate unit and provide the capacity of the project. For example select “Km” and provide total length in case of road and highway project, select “MW” and provide generation capacity in case of power generation project, select “passengers/annum” and provide passengers handled per annum in case of an airport project.
Location / Select the state/ union territory (UT) from the drop down menu. In case the project extends to two or more states/ UT, select the option “multiple states” and select the origination state from the drop down menu. (In case of hardcopy submission, indicate the state/ UT for the project. If the project extends to multiple states/ UT, indicate “multiple” and mention the origination state/ UT)
Status / Select the current status of the project from the drop down menu. Select/ indicate:
- “Under construction” for projects which are awarded but are not yet completed;
- “Completed” for completed project;
- “Terminated” for projects which are terminated/
Nodal Authority / Select the nodal authority from the drop down menu. Select/ Indicate
- “Centre” in case the project is initiated by a central government/ agency;
- “State” in case the project is initiated by a state government/ agency
Project Authority / Provide name of the authority responsible for the project. Also provide contact details including name of the contact person, address, email, phone and fax
Project Contractor / Provide name of the contractor executing the project. Also provide contact details including name of the contact person, address, email, phone and fax
B. / Project Timelines
Date of award of project / Provide the start date of the project as mentioned in the letter of award. Provide the date in dd/mm/yyyy format
Date of Project Completion (as per Contract) / Provide the date of completion of the project as defined in the contract. Provide the date in dd/mm/yyyy format
Date of Project Completion (Actual) / Provide the actual date on which the project has been completed. Provide the date in dd/mm/yyyy format. Provide only for completed projects
C. / Project Cost
Project Cost (as per Contract), in Rs. crore / Provide the cost of the project in Indian Rupees crore as per the contract
Project Cost (Revised), in Rs. crore / Provide the revised cost of the project, if any, in Indian Rupees crore.
Project Cost (Actual), in Rs. crore / Provide the actual or the executed cost of the project in Indian Rupees crore. The cost to be provided only for completed projects
D. / Others
Any other information / Provide any other information relevant for the project and not captured elsewhere in the information template
List of Infrastructure Sectors & Sub-sectors:
S.No. / Category / Sub Sector1. / Transport / Roads and bridges
Ports (excluding captive)
Inland waterways
Airports
Railway track, tunnel, viaducts, bridges
Urban public transport (except rolling stock)
2. / Energy / Electricity generation (grid)
Renewable energy (grid)
Electricity transmission
Oil pipelines
Oil/ gas LNG storage
Gas pipelines
City gas distribution
3. / Communication / Telecommunication towers
4. / Water and sanitation / Solid waste management
Water supply pipeline
Water treatment plants
Sewage collection, treatment and disposal system
Irrigation (dams, channels, embankments, etc.)
Storm water drainage system
5. / Social and commercial infrastructure / Common infrastructure for industrial parks, SEZs
Cold Chains