H7Checklist — Design or manufacture of aftermarket front underrun protection

Applicable vehicle details

Vehicle make(s): / Vehicle model(s): / Month and year range of compliant vehicles (start and end date):

FUPD/FUPS details

Name of manufacturer of FUPD/FUPS: / Type of FUP: / FUPD/FUPS Approval No (i.e. CRN or allocated by H7 approval number):
FUP device / ☐ / FUP system / ☐

Test facility details

Test facility name: / Test date: / Address:

Test report details

Test report no.: / Date issued: / Approved: / Position of approval plate on device or vehicle:
Click here. / Yes / ☐ / No / ☐

Certification owner details

Name of certification owner: / Address:

Supporting documentation list

Document details:

Design details

Front underrun protectionCheck Yes, No, N/A as applicable: / Yes / No / N/A
1 / Does the design of the FUPD/ FUPS comply with the requirements of Australian Design Rule (ADR) 84/..? / ☐ / ☐
InstallationCheck Yes, No, N/A as applicable: / Yes / No / N/A
2 / Havedetailed fitting instructions been created for the installation of the FUPD/FUPS? / ☐ / ☐ / ☐
3 / Has the FUPD/FUPS been designed to be fitted without the removal or weakening of vehicle sub-frames, chassis, cross-members or body members, or if not were these alterations included during the testing of the FUP certification to ensure the vehicle(s) will continue to comply with ADR 84/.. ? / ☐ / ☐
4 / Is the FUPD/FUPS designed so that all lights are free of obstruction from all viewing angles as a result of the fitting? / ☐ / ☐
5 / Is the design of the FUPD/FUPS such that the maximum ground clearance below the FUPD/FUPSis no more than 400mm except within 200mm from either side of FUP device (measured from outside of tyre)? / ☐ / ☐
Approval plateCheck Yes, No, N/A as applicable: / Yes / No / N/A
6 / Does the design of the approval plate list all necessary information? / ☐ / ☐
Approval certificateCheck Yes, No, N/A as applicable: / Yes / No / N/A
7 / Has an approval certificate been created to cover the FUPD/FUPS? / ☐ / ☐

Compliance

ModificationCheck Yes, No as applicable: / Yes / No
1 / Does this design meet all the requirements of Modification Code H7? / ☐ / ☐
2 / Is the quality of the work to an accepted industry standard? / ☐ / ☐
3 / Does the design of the FUPD/FUPS when installed on the vehicle/rage of vehicles not prevent the vehicle(s) from continuing to comply with all affected ADRs? / ☐ / ☐

Authorisation

Comments:
Examined by: / Company (if applicable): / AVE No.:
Signed: / Modification certificate no.: / Date:
FUPD/FUPS H7 approval No.(allocated by H7 approved vehicle examiner): / Date: / Signed:

Vehicle Standards Bulletin 6 — Version 3.0
Section H—Chassis1 of 2