/ Transport Services Division
ENVIRONMENT/STORMWATER
Stormwater Treatment Infrastructure

Part A.3 - NEW STI (LOCATION) TEMPLATE

INSTRUCTIONS FOR FILLING OUT THIS MAINTENANCE SHEET TEMPLATE:[CL1]

  1. Fill out in Conjunction with the Design Engineer, the STI Manufacturer and the STI Installation Personnel.
  2. When complete, send to the Stormwater Group so they can add it to the STI Maintenance Register.
  3. When filling out this from electronically, click the box to tick the box.
  4. This sheet is designed for double sided printing.

Location name[CL2]– STI Type (Road Name)

Road
Number: ______
Name: ______
Locality Identifier[CL3]
RRD: ______
MM: ______
GPS Coordinates: ______
Location name:
______/ STI Type/Model
(refer to note below):
______
NOTE: Refer to the “STI by Type” section of the DPTI STI Maintenance Manual for general information on each type of STI.
If no section exists for the type of STI being installed, add a new section, using the New STI (Type) Template. / STI Drawing Reference(s)
(appended to email to Stormwater Group):
DPTI Dwg. __ Sheet __
Knet # __
[CL4]
DPTI Dwg. __Sheet __
Knet # __
Item No. __ on Drainage Connection Schedule.
STI Installation Date:
______/ Directions to Reach STI from nearest Main Road:
______
Date added to Maintenance Manual:
______
Insert Photos – one photo per box with labels (i.e. outlet, inlet, etc) as required
Append photo files to email to the Stormwater Group. / Insert photo - one photo per box, add more tables if necessary

K-Net Doc: Template - 991848 UNCONTROLLED COPY WHEN PRINTED

Version No.: 2

Issue Date: December 2014

Doc. Owner: Principal Environmental Officer Page 1 of 2

Stormwater Treatment Infrastructure –Part A.3 - Template

Cleaning Requirements
As indicated in relevant STI by Type section
Requirements specific to this site detailed below:
______
STI Maintenance History up to the time this sheet added to Manual:
Unknown
Vegetation Management Requirements:

As indicated in relevant STI by Type section
Requirements specific to this site detailed below:
______
One-off activities required at time of writing this Manual:
  • ______
Ongoing Maintenance:
  • Spot spray and hand pull declared and environmental weeds.

Disposal Considerations:
As indicated in relevant STI by Type section
Requirements specific to this site detailed below:
______
______
Other Maintenance Considerations:
As indicated in relevant STI by Type section
Requirements specific to this site detailed below:
______
______
Manufacturer/Supplier:
As indicated in relevant STI by Type section
Requirements specific to this site detailed below:
______
______

Now email the completed form, photos and design drawings to the Stormwater Management Group to add to the STI Maintenance Register

K-Net Doc: Template - 991848 UNCONTROLLED COPY WHEN PRINTED

Version No.: 2

Issue Date: December 2014

Doc. Owner: Principal Environmental Officer Page 1 of 2

[CL1]Delete the instructions once form is complete

[CL2]Use location name determined below

[CL3]NOTE: STI are grouped according to “Road Names and Numbers” and differentiated by their “Road Running Distance (RRD) and Locality Identifier”. For example, all wetlands along the Southern Expressway are grouped under the road name and number, “Southern Expressway / RN 6780”. They are differentiated by being given a Locality Identifier that combines the RRD and an appropriate infrastructure name (eg. “RRD 7.50 / Field River Wetland”).

[CL4]If you have saved the drawings to knet include the drawing number, sheet number and knet number

If not append drawings to email.