Appointment of a Multi-Disciplinary Professional Team for the design and supervision for Replacing of Roof covering with Minor Building Works in Administration Building and the Improvement of Strand Ticket Office in Port Elizabeth Station. (Scope of Works)
Subject / 5GB Turnkey Contract
  1. PROJECT BRIEF

Metrorail together with PRASA CRES Eastern Cape, divisions of Passenger Rail Agency of South Africa (PRASA), have Identified stations within the Eastern Cape that need to be improved. The basis for the improvements, among others are to look at issues of security in the ticket offices, this is a means of increasing fare revenue for the organisation. This document seeks to get permission from the organisation to source a Turnkey Contract, comprising of a Professional Team and a Contractor, which would perform standard Professional Services to carry out the designs and management of the Project and construction of the Project respectively.

The purpose of the submission is to obtain the approval for the procurement of a Consortium Professional Team to design and a CIDB 5GB Contractor to construct in the National Station Improvement Programme (NSIP), for the identified Port Elizabeth Station and Strand Ticket Office, within Port Elizabeth Station Precinct, in the Eastern Cape.

  1. SCOPE OF WORK

The consortium on a Turnkey Contract, will consists but not limited to the following:

oArchitect

oQuantity Surveyor

oCivil and Structural Engineer

oElectrical and Mechanical Engineer

oHealth & Safety Consultant and

o5GB CIDB Grading Contractor

The submission covers work that needs to be done at the Port Elizabeth and Strand Ticket Office as part of the National Station Improvement programme. The appointed consortium is expected to prepare, coordinate, finalise and monitor a detailed design and documentation programme for the Port Elizabeth Administration Building and Strand Ticket Office, led by the Architect as the Principal Agent.

The consortium is also to be managed by an independent Quantity Surveyor firm to be acquired independently by PRASA. The project manager (Quantity Surveyor) will be responsible for the coordination of all activities relating to the project, management of construction, management of procurement of services, certification and sign off, and most importantly advise PRASA on approvals and authorizations relating to the project.

The services of a Quantity Surveyor are engaged because:

  • A conflict of interest exist as the client cannot be a principal agent as well on a capital project in terms of the construction contract;
  • A unbiased and professional review is needed for construction documents prepared by the DB Contractor’s design team for payment recommendation;
  • All the skills needed to execute the subject capital projects are not available from the PRASA personnel;
  • The volume and extend of the subject capital projects is such that the existing personnel compliment will not be able to cope with the work load; and
  • The time available to execute the subject capital projects does not allow for training and recruitment of personnel resources to execute it in-house.

In essence the project will have a Design Team and the expectation is to provide the following services

  1. Architectural Consultant – Principal Consultant, to do building drawings and align to building regulations and standards and acquire occupancy certificates
  2. Quantity Surveying Services - to quantify the work to be carried out
  3. Architectural Consultant – to do building drawings and align to building regulations and standards and acquire occupancy certificates
  4. Heritage Consultant - Advisory on alterations to the building
  5. Electrical and Mechanical service – Design of electrical and mechanical requirements as set out by client
  6. Structural Engineer - Provide structural integrity reports and advisory on any losses/gains of structural strength
  7. Health and Safety Services – to ensure safety standards are in order throughout the project
  8. Construction Team -The below is a clear scope of works defining the activities to be performed in each area.
  1. Scope of Works and Areas of Focus

The general Scope of Works is as follows:

  • Replacing roof and ceilings in Port Elizabeth Station
  • Replace carpets
  • Renovate the existing ticket offices to safe workable standards
  • Resurfacing of the Platforms with Tactile as a yellow line
  • Access Control to Stations, including Universal Access
  • Provide new and refurbish existing Shelters & Benches
  • Provide refurbish existing Ablutions
  • Provide Solar Bank
  • Provide LED Lighting
  • Provide Water Harvesting
  • Provide Rubbish Bins
  • Provide PRASA Signage
  • Provide Notice Boards
  1. Technical Evaluations Criteria

Evaluation of Multi-Disciplinary Built Environment Professional Team
CRITERIA / SUB-CRITERIA / SCORING / MAXIMUM POINTS
Track Record of Tenderer on similar type and sizes ( or more ) of projects previously executed
/ Points allocated for track record of similar type and scale of previous projects executed by tenderer in consideration:
1. Appointment letter from client. and 2. Final Account 3. Close Out letter 4. Practical Completion certificates / 5-Same type of Projects of same value or higher
4-Same type of Projects not less than 80 % of value
3-Same type of Projects not less than 50 % of value
2-Same type of Projects not less than 35 % of value
1-Type of project not similar / 20%
Qualifications and Competencies of Key Staff / Points allocated for qualifications and professional registration for the lead member of each Discipline required. 1. Certified qualifications 2. Certified professional registration 3. CVs
B Degree (B Tech or Degree in Built Environment) plus 10 years of Experience and above in similar projects
Diploma(in Built Environment) plus 12 years of Experience and above ( extra year for Diploma )
Certificate(in Built Environment) / 5-Professionally Registered personnelwith minimum of Bachelor's Degree in the built environment (Evidence is CV + certified Proof of Qualifications + certified Proof of Professional registration with SACPCMP anda Professional Body relevant to that Discipline, endorsed in RSA)
4-Professionally Registered personnel with minimum of Bachelor's Degree in the built environment (Evidence is CV + Certified Proof of Qualifications + certified Proof of Professional registration with a Professional Body relevant to that Discipline, endorsed in RSA )
3-Professionally Registered personnel with National Diploma in the built environment (CV + Certified Proof of Qualifications + certified Proof of Professional registration with a Professional Body relevant to that Discipline, endorsed in RSA)
2-Professionally Registered personnel with Certificate in the built environment (CV + Certified Proof of Qualifications + certified Proof of Professional registration with a Professional Body relevant to that Discipline, endorsed in RSA)
1-No relevant qualifications or registration in the built environment; or No submission / 15%
Approach and Methodology / Points allocated for submission of Methodology that is detailed (addressing in detail all activities to be carried out), project specific (talking to the Scope to be carried out in the Project) and have milestones (Covering all six stages of the Project) / 5-Submission of approach and methodology plus 1. Detailed 2. Project Specific 3. Milestones
4-Submission of approach and methodology plus 1. Detailed and any 1 of 2. Project Specific or 3. Milestones
3-Submission of approach and methodology plus any 2 of the three requirements met 1. Detailed 2. Project Specific or 3. Milestones
2-Submission of approach and methodology plus any of 1. Detailed 2. Project Specific or 3. Milestones
1-Submission of 1 requirement or No Submission / 10%
Client Satisfaction Letter / Points allocated for a submitted Client Satisfaction Letters / 5-Submission of letter from at least 5 + clients
4-Submission of letter from at least 4-5 clients
3-Submission of letter from at least 2-3clients
2-Submission of letter from at least 2 clients
1-Submission of letter from at least 1 client / 5%
Professional Team Sub-Total / 50%
Main Building Construction Evaluation (5GB or higher )
CRITERIA / SUB-CRITERIA / SCORING / MAXIMUM POINTS
Organisational Experience (Turnkey Projects)
/ At least a minimum of 5 completed projects of similar naturewith contactable reference
Attach letters of Appointment, or Completion Certificates / 5 = proof of 6 projects and above
4 = Proof of 5 Projects
3 = Proof of 4 Projects
2 = Proof of 2 or 3 Projects
1 = Proof of 0-1 Projects / 20%
Experience key staff (assigned site personnel) in relation to the scope of work / Submit proof of :
  1. At least one registered professional or Candidate Construction Manager with 5 year experience with CVs and qualifications
  2. Supporting Site personnel – Lower Qualifications such as National Diploma, N3-N6 Certificates, Trade qualifications such (Masonry, Carpentry, Welding, etc )
/ 5 = CV with qualifications, BSC Eng. or B-TECH and Professional Registration supported by lower qualifications
4 = CV with qualifications, National Diploma Professional Registration supported by lower qualification including trades qualifications
3 = CV with qualifications, National Diploma supported by lower qualifications including trades qualifications
2 = CV with qualifications, N3-N6 including trade qualification
1 = In adequate qualifications and experience (CV only) (No Professional Registration and no Trade qualification) / 15%
Plant and Equipment / Proof of ownership of plant and equipment or proof of account to hire [100% = Tipper Trucks, 1 Tonne Bakkies, Power Tools, Forming & Shoring Tools, Stamping Tools, Hand Tools(shovels, chisels, scrapers, hammers, Hands Saws, measuring tools, trowels, floats and knives)
Ownership = Certified Asset Register / 5 = 100% Proof of all owned equipment
4 = 80% Proof of owned or 100% Proof of account to Hire
3 = 70% Proof of owned or 80% Proof of account to hire
2 = 50% Proof of ownership or 70% account to hire
1 = Less than 50% and no proof of account to hire / 10%
Health and Safety Report / 1. Provide a competent Safety Rep with a (Attach CV and qualifications)
2. Provide a competent Safety Officer with a minimum of 3 years industry experience and registered with the SACPCMP(Attach CV and qualifications)
3. Provide a project specific and comprehensive baseline risk assessment.
4. Provide a valid Workman’s compensation registration certificate / 5 = All required information
4 = 1,2,3 and 4 without the registration
with the SACPCMP
3 =Provision of item 1 and 2,
without 3 and/or 4.
2 = Provision of 2 and 3 without
1 and / or 4
1 = Provision of only 1 requirement
“Kindly note that you are required to submit a comprehensive safety file for approval on appointment as the preferred bidder.” / 5%
Construction Team Sub-Total / 50%
TOTAL / 100%