PROJECT TITLE
Applicant:
Contact Person: / Title:
Email: / Phone:
This project is ranked as number: _____ / From total number of applications: _____
  1. PROJECT TYPE
/ Check
ONE 
On-Street Bicycle Facility (B) Bike/Ped Plan Pages 89-91
On-Street Pedestrian Facility/Sidewalk (S) Bike/Ped Plan Page 88
Shared Use Path/Trail (T) Bike/Ped Plan Page 92
Corridor Study (CO)
Complete Street (CS) CS Evaluation Pages1-2/Speed limit <45
1.1 Project Type / Complete for B/S/T/SS/CO/CS
SCTPO Bicycle and Pedestrian
Mobility Plan December 2013 / Map ID#___
Mobility Plan Project List, Table 7.1
Jurisdiction ______/ Priority Project List, Table 9.2
Corridor ______
Functional Score (FS) ___ X .1 = ___ / Recreational Score (RS) ___ X .1 = ___ / Priority Project
(PP)___ +2 points / 1.1
TOTAL
FS + / RS + / PP + / =
1.2 Project Type / Complete for B/S/T/SS/CO
Complete Streets Evaluation Methodology
January 2014
Phase 1:
Project Identification / Jurisdiction ______
Suitable Areas (SA) Total Score ___ / Overall Corridor (OC) Score ___ / Project Priority 1.1 TOTALScore (1.1T)___ / PROJECT
TOTAL
SA + / OC + / 1.1 T + / =
  1. PROJECT TOTAL for B/S/T/SS/CO

1.3 Project Type / Complete for CS
Complete Streets Evaluation Methodology January 2014
Final Long List, Page 120,Table 20
Jurisdiction ______/ Priority Project List, Page 79, Table 16
Corridor ______
Suitable Areas (SA) Total Score ___ / Overall Corridor (OC) Score ___ / Priority Project
(PP)___ +2 points / PROJECT
TOTAL
SA + / OC + / PP + / 1.1T+ / =
  1. PROJECT TOTAL for CS

  1. Design GUIDELINES
/ Complete for B/S/T/SR/CO/CS
SCTPO Bicycle and Pedestrian Mobility Plan December 2013
Functional Classification
Page 82, Figure 8.2 / Check
ONE  / Transect/Context
Page 82-83, Figure 8.1-8.2 / Check
ONE 
Principle arterial road / Natural area
Minor arterial road / Rural area
Collector road / Suburban area
Local road / Transition area
Off-road shared use path / Activity center
2.1 Design Typologies / Page 86-87, Table 8.1
Pedestrian treatment description:
Bicycle treatment description:
*Exception requested:
Preferred Treatment
+3 points / OR Minimum Standard
+1 point / OR Exception Requested*
No points
  1. DESIGN TOTAL

  1. CONNECTIVITY
/ Complete forB/S/T/SS
Sidewalk / Would connect to or extend existing sidewalk / +1 point
Bike facility / Would connect to or extend existing bike facility / +1 point
Trail
OR / Would connect to or extend existing trail / +2 points
Would connect to or extend programmed trail / +1 point
Complete forB/S/T/SS/CO/CS
Transit
OR
OR / Addresses SCAT Transit Accessibility Plan / +3 points
One or more routes located on corridor / +1 points
One or more routes cross the corridor / 0 points
Rail / Within 1/2 mile of future train station / +1 point
  1. CONNECTIVITY TOTAL

  1. ACCESSIBILITY
/ Complete forB/S/T/SS/CO/CS
List all within ¼ mile / +0.5pts
EACH
Schools
Civic/social community ctr
Parks and rec land/facilities
Scenic lands
Water access (ocean/river)
Conservation lands
Tourist sites
Historic or art district
ACCESSIBILITY SUB -TOTAL
Posted speed
OR
OR / <35 mph / +2 points
35 to 45 mph / +1 point
> 45 mph / 0points
  1. ACCESSIBILITY TOTAL

  1. READINESS
/ Complete for B/S/T/SR/CO/CS
Policy
OR / Concept approved by elected leaders / 0 points
Project design beyond conceptual plans approved / +1 point
Plans
OR
OR
OR / None completed / 0 points
Feasibility study or conceptual plans developed / +1 point
30% plans complete / +2 points
60% plans complete / + 3 points
Funding
OR
OR
OR
OR / No match (no match required) / 0 points
5% to 19% match / +1 point
20% to 34% match / +2 points
35% to 49% match / +3 points
50% or more match / +5 points
  1. READINESS TOTAL

  1. TRAILS
/ Complete for T ONLY / Part of / Connects
Regional Trails* / +5 points / +1 point
Florida East Coast Greenway
St. Johns River to Sea Loop
Coast to Coast Connector
Showcase Trails / +3 points / +1 point
Central Brevard Zoo Trail
South Brevard Al Tuttle Trail
West Brevard St. Johns River Eco Heritage Trail
  1. TRAILS TOTAL

*Also eligible for SUN Trail Network funding. Information at:

and

  1. PROJECT TOTAL
/ +
  1. DESIGN TOTAL
/ +
  1. CONNECTIVITY TOTAL
/ +
  1. ACCESSIBILITY TOTAL
/ +
  1. READINESS TOTAL
/ +
SUBTOTAL 1 / =
Use SUBTOTAL 1 as total score for the following:
TOTAL FOR On-Street Bicycle Facility (B)
TOTAL FOR On-Street Pedestrian Facility/Sidewalk (S)
TOTAL FOR Corridor Study (CO)
TOTAL FOR Complete Street (CS)
SUBTOTAL 1 + / +
  1. TRAILS TOTAL
/ +
TOTAL FOR TRAIL PROJECT (T) / =

Page 1 Space Coast TPO Supplemental Project Application