BC Hydro Bioenergy Call for Power (Phase I) – Proposal Letter-Schedule A

SCHEDULE A

PROJECT PRICE FORM

Note: This document is Schedule A to the Proposal Letter. Only one Schedule A (Project Price Form) per Proposal is permitted. This Schedule is a form field document. Enter data only in the form fields. All other text is in read only format. Follow the instructions under “Description of Data”.

Full Legal Name of Proponent:

Project Name:

This Schedule sets out the Proponent’s proposed pricing for the Proposal.

In this Schedule:

(a) “COD” has the meaning given in the Specimen EPA; and

(b) “CPI” means the Consumer Price Index for British Columbia, All Items (Not Seasonally Adjusted) as published by Statistics Canada.


1. Project Price

Ref. # / Description of Data / Proposed Data
1.1 / Term: Using a whole integer, state the number of years of the proposed term of the EPA (the “Term”) commencing on COD.
The Term should be not greater than 20 years and not less than 5 years. / years
1.2 / Guaranteed COD: State the month and year of the proposed guaranteed COD (which should be not later than November 2012). Guaranteed COD is understood to be the 1st day of the proposed month. / Month: (blank)JanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecember ò
Year: (blank)20082009201020112012 ò
1.3 / Pricing: State the proposed firm energy price for the Term, expressed in Canadian $ per MWh (as of January 1, 2008). / $ per MWh
1.4 / Escalation: State a percentage, in whole integers, of (a) the pre-COD firm energy price, and (b) the post-COD firm energy price, that will be subject to annual escalation at CPI from January 1, 2008.
The escalation percentage applicable to the pre-COD firm energy price may be not greater than 300% and not less than 0%. The escalation percentage applicable to the post-COD firm energy price may be not greater than 50% and not less than 0%. / Pre COD: %
Post COD: %


2. Hourly Firm Energy Profile

Complete the hourly firm energy (“HFE”) profile set out below, in accordance with the guidelines that follow this paragraph. The HFE profile determines the amount of electrical energy the Proponent is proposing be delivered under the EPA from its Project, failing which liquidated damages will apply. An annual profile will be applicable under the EPA in each year of the Term commencing on COD. Under the EPA, BC Hydro will purchase associated non-firm energy as specified in the Specimen EPA.

Completion guidelines:

(a) “Peak”, “Super-peak” and “Off-peak” have the meanings given in the Specimen EPA.

(b) Assume no leap year in completing the table. The table will be subject to adjustment for leap years under the EPA.

(c) Round MWh/h to two decimal places.

(d) Assume no Planned Outages (as defined in the Specimen EPA) in completing the table.

(e) The table should reflect Energy deliveries at the POI (all as defined in the Specimen EPA).

(f) The aggregate HFE for May, June and July should not be greater than 25% of the annual HFE.

Peak
(MWh/h) / Super-peak
(MWh/h) / Off-peak
(MWh/h)
January
February
March
April
May
June
July
August
September
October
November
December