SPECIAL PROVISIONS CONTRACT NO. IFB_ContractNo

715 — TREE ROOT PRUNING 2 of 2

CATEGORY 700

LANDSCAPING

SECTION 715 — TREE ROOT PRUNING

Requires SPI 701, SPI 704, SPI 705, SPI 708, SPI 709, and SPI 920

617 DELETE:Section 71 5 — Tree Root Pruning, in its entirety.

INSERT:The following.

SECTION715 — TREE ROOT PRUNING

715.01DESCRIPTION. Prune tree roots as indicated in the SP 700 Tree Preservation Program, or in the plans. Perform Tree Root Pruning within a Tree Preservation Area per Section 120 when specified.

715.02MATERIALS.

Salvaged Topsoil 920.01.01

Furnished Topsoil 920.01.02

715.03CONSTRUCTION.

715.03.01General.

(a)Permits. Obtain a Roadside Tree Permit from the Maryland Department of Natural Resources - Forest Service.

(b)Tree Preservation Program (TPP). Adhere to the requirements of the TPP when developed by the Administration.

(c)Schedule. Perform operations when soil moisture and weather conditions are suitable. Cease operations when conditions are not suitable.

715.03.02Maryland Licensed Tree Expert (LTE). A LTE shall perform or directly supervise the Operations in conformance with the Maryland Roadside Tree Law, the Forest Conservation Act, and accepted arboricultural practices.

715.03.03Meetings. Meet with the Engineer, the LTE, and the Landscape Operations Division before beginning Operations.

715.03.04Utilities Marking and Conflicts. Refer to Section875 when included in the Contract Documents.

(a)Utilities Marking. Contact ‘Miss Utility’ or another approved service to identify and mark utilities in the rights-of-way and on SHA property.

(b)Conflicts. Notify the Administration of conflicts that may affect operations. Conflicts will be reviewed by the Landscape Operations Division and resolved within 14 days after notice.

715.03.05Marking. Mark areas to be root pruned, and obtain approval before beginning Operations.

715.03.06Equipment. Use a vibratory knife or other equipment and tools that conform to accepted arboricultural practices.

715.03.07Notice. Notify the Engineer at least 10days before beginning Operations.

715.03.08Operations. Meet ANSI A300 standards for Tree Care Operations. Cleanly cut tree roots along the approved line to a depth of 24in., or to the depth specified in the Tree Preservation Program, and immediately backfill trenches with excavated soil.

715.03.09Cleanup and Restoration. Avoid damage to existing structures, plants, and turfgrass. Keep turfgrass areas, paved surfaces and sidewalks clean. Promptly remove, disperse, or dispose of wood debris and other waste materials as directed. Restore areas of root pruning, ruts and damaged turfgrass areas by seeding in conformance with Section 705, or perform Turfgrass Sod Establishment in conformance with Section 708 when directed, before beginning other landscape operations.

715.03.10Damage Repair. Do not injure vegetation to be preserved. Repair injuries to bark, trunks, or limbs by cutting, smoothing, and tracing the bark in accordance with ANSI A300 Standards for Tree Care Operations.

715.03.11Damage Compensation. Monetary compensation for damage or loss of trees will be calculated and assessed in conformance with the Guide for Plant Appraisal of the Council of Tree & Landscape Appraisers.

715.04MEASUREMENT AND PAYMENT. Tree Root Pruning will be measured and paid for at the Contract unit price per linear foot. The payment will be full compensation for all labor, material, equipment, tools, cleanup and restoration, damage repair, disposal fees and incidentals necessary to complete the work.