Engineering Toolmaking (Mould, Tool and Die Equipment)
Level 3
Awarded by the EMTA Awards Limited
Accredited from 2 November 2005to 30 November 2010
Group award number: G83C 23
Standards
This SVQ is based on standards developed by SEMTA. SEMTA draws its membership from the engineering sector.
For further information, please contact the SQA web site.
Structure of the SVQ
The way the SVQ is made up is shown below. The unit title appears in bold and the elements that make up each unit are listed under the unit title.
Mandatory units
Candidates must complete all of these units:
Complying with Statutory Regulations and Organisational Safety Requirements
1Complying with statutory regulations and organisational safety requirements
Using and Interpreting Engineering Drawings and Documentation
1Using and interpreting engineering drawings and documentation
Work Efficiently and Effectively in Engineering
1Work efficiently and effectively in engineering
Carrying Out Fault diagnosis on Mould, Press Tool or Die Equipment
1Carrying out fault diagnosis on mould , press tool or die equipment
Maintaining Mould, Press Tool or Die Equipment
1Maintaining mould, press tool or die equipment
Handing Over and Confirming the Completion of Mould, Press Tool or Die Equipment Maintenance Activities
1Handing over and confirming the completion of mould, press tool or die equipment maintenance activities
Optional units
Candidates must also complete 2 of the following units, in addition to the mandatory units.
Repairing or Modify Mould, Press Tool or Die Components
1Repairing or modify mould, press tool or die components
Producing Mould, Press Tool or Die Components by Manual Machining
1Producing mould, press tool or die components by manual machining
Preparing and Setting Power Presses
1Preparing and setting power presses
Carrying Out Condition Monitoring of Mould, Press Tool or Die Equipment
1Carrying out condition monitoring of mould, press tool or die equipment
Carrying Out Planned Maintenance on Mould, Press Tool or Die Equipment
1Carrying out planned maintenance on mould, press tool or die equipment
Carrying Out Planned Maintenance on Power Presses
1Carrying out planned maintenance on power presses
There may be publications available to support this SVQ. For more information, please contact:
EMTA Awards Ltd (EAL)
National Verification Centre
3365 Century Way
ThorpePark
Leeds
LS15 8ZB
Tel: 01132 601188
Fax:01132 321159
Website:
Engineering Toolmaking/3/140905/LK