1155010: 81594 - Powering Progress Together

Accessibility script for Monodiameter_7_8_15_Approval_16x9

[Background music plays]

Keyboards, rhythmic

[Female voice over]

“Just 130 miles south east of New Orleans…”

[Caption]

MonoDiameter

Innovation Worth Replicating

[Video footage]

Aerial shot of offshore platform, partial circle R to L, smaller platform in background

[Voice over]

“…lies one of the most prolific oil and gas development areas in the Gulf of Mexico.”

[Graphic]

Google Map style graphic map of part of Western Hemisphere, zoom in on Gulf of Mexico

[Voice over]

“The Ursa-Princess field is indeed a rewarding basin, but it’s also a challenging one.”

[Text]

Ursa-Princess Field

[Graphic]

White dot pinpointing Ursa-Princess field appears on map, pulsates, circle effect revolves around the point

[Voice over]

“The oil is trapped in several layers under the ocean floor.”

[Graphic]

Pipeline through centre of geological layers, oil flowing up pipeline

[Voice over]

“Since the upper layers are quickly depleted,Shell was determined to find a way to

reach the deeper reservoir sections.”

[Graphic]

Dissolve into closer view of geological layers, pan down to end of pipeline and beyond to layers not yet reached

[Voice over]

“It's a task that typically requiresmany sections to be drilledand isolated,which reduces the diameter ofthe wells from section to section.”

[Graphic]

Dissolve out to wider view of geological layers, pan down pipeline showing its varying widths as it goes deeper

[Voice over]

“With such traditional tapered well design…”

[Graphic]

Static wider view of geological layers

[Voice over]

“…the borehole gets so narrowin the new reservoir layer,that production amounts becometoo small to be commercially viable.”

[Graphic]

Outline of tapered borehole design dissolves onto graphic of geological layers

[Voice over]

“Shell developed a different solution:MonoDiameter well technology.”

[Video footage]

Pan down horizontal flow pipeinfrastructure on offshore platform to team of engineers on deck bringing into place a vertical pipe

[Voice over]

“In the P8 well in the Princess field,the company has deliveredthe first well in deep water,where depleted formations werepenetrated and isolatedwhile maximizing the diameter.”

[Video footage]

Wide shot of engineers lowering unit into flow pipe

Medium shot of engineers lowering unit further onto flow pipe

Medium shot of pipe at horizontal slant being manoeuvred across deck

Engineers on deck moving pipe into position

Slight zoom in of pipe revolving

[Voice over]

“Maintaining one hole size over several drilling sectionsmarks a breakthrough in the abilityto reach production zonesthat until now have been consideredtoo difficult to access.”

[Graphic]

Long pan down from structure at top of pipe through pipe sections to boring element at end of pipe

[Voice over]

Shell's unique MonoDiameterwell construction technique usesa top anchor and pull system

to expand steel pipe down hole.

[Video footage]

Boring device sliding down pipeline, zoom out

Slight zoom of graphic on abstract background showing: top anchor; pull system; close up of drill head

[Voice over]

“It's the first system of its kindto install multiple linerswith minimal or no reductionin the hole size.”

[Graphic]

Liner inserts down drill in centre of graphic, with outline comparison on either side: Conventional Telescoping Well Design; and 100% MonoDiameter Expandable Well Production Design – text labels

[Voice over]

“Here's how it works:after a section of the well is drilled,a specially designed lineris inserted. Once this liner is at target depth in the well, the top anchor is activated, and an expansion assembly

is pulled up to widen the pipe to match the size of the previous liner.”

[Graphic]

Close up of liner fluid streaming out of end of drill, pan up drill hole as liner fluid fills up it will lining until it reaches top anchor, top anchor moves into activation

Close up of expansion assembly being pulled up

Wider view of expansion assembly as it continues upward

[Voice over]

“This process can then be repeatedin the next hole section,to maintain the hole size.”

[Graphic]

Pan down sections of the drill hole, each moves from empty dark to filled with grey liner

[Ambient voice over]

“It's quite hard work, you know,and you see it's working.”

[Video footage]

Wide interior of cabin on platform, gage, screens and partial view of face of engineer speaking

[Voice over]

The revolutionary technique enablesgreater recovery rates,not only in the Princess field,but other basins in the deepwater portfolio.

[Video footage]

Engineers monitoring large piece of machinery being moved into place

Engineer moves around drill pipe, washing it

[Voice over]

It is a testament to Shell's continued commitmentto optimize resultsand stands out asinnovation worth replicating.

[Video footage]

Aerial shot of offshore platform, partially circling platform R to L

Aerial shot of platform from lower down nearer sea level

[Graphic]

Shell pecten on white background

[Text]

© Shell International Limited 2015

[Background music]

Ends on sting